Loading...
HomeMy WebLinkAboutCreekside Lot 108 Dryin.pdfg3UNIVERSALc ENGINEERING SCIENCES INSPECTION RESULTS Inspections D�ate�:� (�( _ ( Permit No Project: Address: Check one: A, Regular inspection: AIn 3 o �i-3 � ❑ Reinspection Date of Initial Inspection: / —,? — 2-/ Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Slab Underground Underground Floor Rough -In Rough -In Duct Rough -In Steam Piping & Test Masonry Wall/Ceiling Wall Rough -In Stack Piping & Test Ceiling Rough -In Water Piping Q. Test HW Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping &Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: L3 co " A � �a Inspection Results; droved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name: a 1 / Lic.#: lV 7 5 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com