HomeMy WebLinkAboutCreekside Lot 107 Column.pdfg3UNIVERSALE
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection 7-
— /
Date:
(
_
Permit No. ,' �D
_ d g 3A,
Project:
Address:`
Check one:
RegularInspection:
❑ Reinspection
Date of Initial Inspection:
%
Inspection Type Requested
(check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
Footing
Slab
Underground
Underground
g
Duct Rough -In
Masonry
Floor Rough -In
Wall Rough -In
g
Rough -In
Stack Piping &Test
Steam Piping & Test
p g
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
HW Piping &Test
CHW Piping &Test
Framing
Structural
Panel/Feeder
Gas Piping & Test
Cond.Piping & Test
Sheet Rock
Service/Ground
Appliance/Equipment
Storm Piping &Test
Fixtures
Insulation
Roofing I
I Lighting Protection I I
Fm dnMPn♦
Wall &Ceiling
Final Building nr-lnspecuon
Final Electrical F' i of ti
inal • .��•.,,,,6 I Final mechanical
Other Inspection Type:
Area Inspected/Code:
Inspection Results• AP -Approved ❑ AE-Approved with Exceptions
P-Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
❑ DA-Disallowed
Inspector's Name: o / Lic #: /v - 419
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com