HomeMy WebLinkAboutCreekside Lot 107 Bond Beam.pdfJPVNIVERSAL'
ENGINEERING SCIENCES
lam- /0 7
INSPECTION RESULTS
Inspection Dater a I Permit No. C� d
Project:
Address: 2 3 C0�
Check one:
A— Regular Inspection:
❑ Reinspection Date of Initial Inspection
Inspection Type Requested (check):
ELECTRICAL
Slab Floor
Masonry I I Wall I
Structural
Sheet Rock
Protection
Final Building Final
PLUMBING
Rough -In
Stack Piping & Test
Water Piping & Test
Gas Piping & Test
Storm Piping & Test
Fixtures
Final
Other Inspection Type:
Area Inspected/Code:
Inspection Result P-Approved ❑ AE-Approved with Exception!
-Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
MECHANICAL
Duct Rough -In
Steam Piping & Test
HW Piping & Test
CH W Piping & Test
Cond. Piping & Test
Insulation
Wall & Ceiline
Final Mechanical
❑ DA-Disallowed
Inspector's Name: Lic.#:
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com