Loading...
HomeMy WebLinkAboutCreekside Lot 9 UG Plumbing.pdf@UNIVERSAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: �z� �—J Permit No. Project: Address: 3 3 3 Check one: Regular Inspection: (❑ Reinspection Date of Initial Inspection Inspection Type Requested (check): .WILU11VU/-� 1 KUL [ URAL I I ELECTRICAL Footing Undergroun Slab Floor Rough Masonry Wall Rough- Wall/Ceiling Ceiling Roug Framing Panel/Feede Structural Service/GroL Sheet Rock Protection Final Building Final Electrical Other Inspection Type Jd y /66/ -7 �a/ PLUMBING MECHANICAL Stack Piping & Test Water Piping & Test Gas Piping & Test Storm Piping & Test Fixtures Final PI Area Inspected/Co*,P-Disapproved dde:b r— U Inspection Result P-Approved ❑ AE-Approved with Exceptions ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Steam Piping & Test HW Piping & Test CHW Piping &Test Cond. Piping & Test Insulation Wall & Ceiling Final Mechanical ❑ DA-Disallowed Inspector's Name: Lic.#: /J A) ] 9 5�5 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com