HomeMy WebLinkAboutCreekside Lot 9 UG Plumbing.pdf@UNIVERSAL
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Date: �z� �—J Permit No.
Project:
Address: 3 3 3
Check one:
Regular Inspection:
(❑ Reinspection
Date of Initial Inspection
Inspection Type Requested (check):
.WILU11VU/-� 1 KUL [ URAL I I ELECTRICAL
Footing
Undergroun
Slab
Floor Rough
Masonry
Wall Rough-
Wall/Ceiling
Ceiling Roug
Framing
Panel/Feede
Structural
Service/GroL
Sheet Rock
Protection
Final Building Final Electrical
Other Inspection Type
Jd y /66/
-7 �a/
PLUMBING MECHANICAL
Stack Piping & Test
Water Piping & Test
Gas Piping & Test
Storm Piping & Test
Fixtures
Final PI
Area Inspected/Co*,P-Disapproved
dde:b r— U
Inspection Result P-Approved ❑ AE-Approved with Exceptions
❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Steam Piping & Test
HW Piping & Test
CHW Piping &Test
Cond. Piping & Test
Insulation
Wall & Ceiling
Final Mechanical
❑ DA-Disallowed
Inspector's Name: Lic.#: /J A) ] 9 5�5
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com