HomeMy WebLinkAboutCreekside Lot 9 Sewer Connect.pdf&3UNIVERSALO
ENGINEERING SCIENCES
INSPECTION RESULTS
7 7--2'
Inspection Date: Permit No.
Project: / `
Address: 3 2 J ( 3 t
Check one:
Regular Inspection:
❑ Reinspection
Date of Initial Inspection:
Inspection Type Requested (check):
Slab
Framing
Structural
Sheet Rock
Final
Other Inspection Type:
ELECTRICAL
Floor
Wall I
Protection
Final Electrical
- 7-a/
PLUMBING
Stack Piping & Test
Water Piping & Test
Gas Piping & Test
Storm Piping & Test
Fixtures
Final
MECHANICAL
Duct Rough -In
Steam Piping & Test
H W Piping & Test
CHW Piping & Test
Cond. Piping & Test
Insulation
Wall & Ceiling
Final Mechanical
Area Inspected/Code:.!);
Inspection Results:il(AP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name:
Lic.#: �/v Z 9
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com