Loading...
HomeMy WebLinkAboutCreekside Lot 6 Sewer Connect.pdfUNIVERSAL' ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 7r7_;K_ Q / Permit No Project:■�a7ri Check one: Regular Inspection: )/by -ogy7 ❑ Reinspection Date of Initial Inspection: _ Z — 7 — p< / Inspection Type Requested (check): nuuUInIb/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping &Test CHW Piping &Test Framing Structural Panel/Feeder Gas Piping &Test Cond. Piping &Test Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceilinu Protection Final Building I Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: a Inspection ResultsP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: OFFICES OFFICES THROUGHOUT FLORIDA s-s- 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com