Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 45-Prepower.pdf
[BUNIVERSAU ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: / 0 - 0 / Permit No. Project: �i)_ Q p A)D Address: Check one: XRegular Inspection: ❑ Reinspection // _©/6'/ Date of Initial Inspection: =- 'S' " D Inspection Type Requested (check): uanw11YV/31 KUL IUKAL ELECTRICAL PLUMBING Footing Underground Underground Slab Floor Rough -In Rough -In Masonry Wall Rough -In Stack Piping &Test Wall/Ceiling Ceiling Rough -In Water Piping &Test Framing Panel/Feeder Gas Piping &Test Structural Service/Ground Storm Piping & Test Sheet Rock Appliance/Equipment I I Fixtures Roofing Lighting Protection Equipment Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbine Other Inspection Type: �1 Area Inspected/Code: q & % — EAR Inspection Results P-Approved ElAE-Approved with Exceptions ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. MECHANICAL Duct Rough -In Steam Piping & Test HW Piping & Test CHW Piping & Test Cond. Piping & Test Insulation Wall & Ceiline Final Mechanical ❑ DA-Disallowed Inspector's Name: Lic.#: 6 rAJ OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com