Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 40 Address Final.pdf
g3UNIVERSALE. ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 7 — /3 — d- I Permit No Project: Address: 1 ` Check one: I`a Regular Inspection: a oil -cello 3 ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): uV16sn1Yu�� I KUL I URAL 1 1 ELECTRICAL PLUMBING Footing Underground Underground Slab Floor Rough -In Rough -In Masonry Wall Rough -In Stack Piping &Test Wall/Ceiling Ceiling Rough -In Water Piping &Test Framing Panel/Feeder Gas Piping &Test Structural Service/Ground Storm Piping & Test Sheet Rock Appliance/Equipment Fixtures Roofing Lighting Protection Equipment Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbine Other Inspection Type: Area Inspected/Code: fr c Inspection Results: AP -Approved ElAE-Approved with Exceptions DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. S. 6. 7. Inspector's Name: MECHANICAL Duct Rough -In Steam Piping & Test HW Piping & Test CHW Piping & Test Cond. Piping & Test Insulation Wall & Ceiline uipment Final Mechanical ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com