Loading...
HomeMy WebLinkAboutCreekside Lot 40 Address Final.pdfg3UNIVERSALE. ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 7 — /3 — d- I Permit No Project: Address: 1 ` Check one: I`a Regular Inspection: a oil -cello 3 ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): uV16sn1Yu�� I KUL I URAL 1 1 ELECTRICAL PLUMBING Footing Underground Underground Slab Floor Rough -In Rough -In Masonry Wall Rough -In Stack Piping &Test Wall/Ceiling Ceiling Rough -In Water Piping &Test Framing Panel/Feeder Gas Piping &Test Structural Service/Ground Storm Piping & Test Sheet Rock Appliance/Equipment Fixtures Roofing Lighting Protection Equipment Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbine Other Inspection Type: Area Inspected/Code: fr c Inspection Results: AP -Approved ElAE-Approved with Exceptions DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. S. 6. 7. Inspector's Name: MECHANICAL Duct Rough -In Steam Piping & Test HW Piping & Test CHW Piping & Test Cond. Piping & Test Insulation Wall & Ceiline uipment Final Mechanical ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com