Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 82 Prepower & Address Final.pdf
LJJ KIVF-COAL ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 3 — Permit No. Project: Address: 3 Y.; Check one: Regular inspection: aol( -o 1-71 ❑ Reinspection Date of Initial Inspection: 7-/ 3 `cq < Inspection Type Requested (check): 6UILDING/STRUCTURAL I I ELECTRICAL PLUMBING MECHANICAL looting U Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW piping &Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping &Test Framing Panel/Feeder Gas Piping &Test Cond.Piping &Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Eauiomrnt I I Final Building Final Electrical Final Plumbing Finat Mechanl Other Inspection Type: Area Inspected/Code: a 060 Inspection Results: ❑ AP -Approved ElAE-Approved with Exceptions ElDA-Disallowed ❑ DP-Disapproved�ot Ready 4. S. 6. 7. Inspectors Name: !Ccl,., Lic.#: 6 IAJ i / � 5� OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com