HomeMy WebLinkAboutCreekside Lot 78 Progress.pdfU.
ENGINEERING sClEKOES
AIY-78
INSPECTION RESULTS
Inspection Date: ^( y q
%%��� Permit No.
Project: l J2 t? OX/1
Address: 3 a T
C
Check one:
kRegular Inspection:
❑ Reinspection
ao/�_In�7U
Date of Initial Inspection: 7-1,y _ aZ
Inspection Type Requested (check):
VVIL✓IIYn�J I KUL I UKAL
Footing
ELECTRICAL
PLUMBING
MECHANICAL
Underground
floor Rough -In
underground
Duct Rough -In
Masonry
Wall Rough -In
Rough -In
g
Rou Stack Piping &Test
P g
Steam Piping &Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
HW Piping & Test
Framing
Panel/Feeder
Gas Piping &Test
CHW piping & Test
Structural
Sheet Rock
Service/Ground
Storm Piping & Test
Cond. Piping & Test
Insu lation
Roofing
Appliance/Equipment
Protection
LightingEquipment
Fixtures
Wall & Ceiling
Re -inspection
Re -inspection
Re -inspection
Equipment
Final Building
Final Electrical
Final Plumbing
Re -inspection
Final Mechanical
Other inspection Type: �1
Area Inspected/Codqqqe,,,:��� �'yy �� `p n� —� 7 ^ eDA-Disallowed
Inspection Results: aKAP-Approved ❑ AE-Approved with Exce tions� P
DP -Disapproved ❑Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: 4 1 \
Lic.q:D_N
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamefa com