HomeMy WebLinkAboutCreekside Lot 78 Weather Barrier.pdf[PUNIVERSAV
ENGINEERING SCIENCES
�,t-7,5-
INSPECTION RESULTS
Inspection Date: ! '/Y- � / Permit No.
/
Project: (_A"- I
Address: 33 a 2�/LLn,l�
Check one:
XRegular Inspection:
❑ Reinspection
doll - a / 7y
Date of Initial Inspection:
Inspection Type Requested (check):
ELECTRICAL
Slab Floor
Masonry I I Wall I
Structural Service/Ground
Sheet Rock I
Protection
Final Building Final Electrical
PLUMBING
Underground
Rough -In
Stack Piping & Test
Water Piping & Test
Gas Piping & Test
Storm Piping & Test
Fixtures
Final
Other Inspection Type:
Area Inspected/Code: Y
Inspection Results.AP-Approved ❑ AE-Approved with Exceptions
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: Lic #:
OFFICES THROUGHOUT FLORIDA
MECHANICAL
Duct Rough -In
Steam Piping & Test
HW Piping & Test
CHW Piping & Test
Cond. Piping & Test
Insulation
Wall & Ceiline
Final Mechan
❑ DA-Disallowed
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com