Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 73 Progress.pdf
@UNIVERSALG ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: l — ` 7 Permit No. Project: Sc !� Address: 3 a 3S_ Check one: Regular Inspection: 45-�' 7 3 ❑ Reinspection Date of Initial Inspection: ( _ ��' d z Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping &Test HW Piping &Test Wall/Ceiling Ceiling Rough -In Water Piping &Test CHW Piping &Test Framing Panel/Feeder Gas Piping &Test Cond. Piping &Test Structural Service/Ground Siorm Piping &Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code: Inspection Results:�AP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. S. 6. 7. Inspector's Name:VQ. ___. e( s, Lic.#: &/) 7 ! J OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com