Loading...
HomeMy WebLinkAboutSEFTEN contract11, TAYL(oi ROOFING CONTRACTOR ICustomer/Owner/Steftettica (Palm Grove) Mobile: �I Project Addsicsio049 Petticoat PI. Ft Pierce FL 34982 Fax: 772-925-9020 Billing Adresssame Fax: Date/Type/Code:4-20-2021,shingle305.12 Email: 1.A. Taylor Roofing will provide necessary permits, schedule all mspe Lions widn related Municipality, and maintain Current Liceirw and Insurance. This proposal includes labor, materials, and all nixes. Please note that "Oil Canning" is a characteristic ormi mcral roof systems and is not a cause for rejection. Our highly trained"Professioner installers will hereby complete the Following; 1. Remove existing roofing materials down to sheathing / decking and prepare as needed to ensure a clean, solid surface in which to apply a new roof. (Based on one layer, tear off, additional layers at extra wary. 2. Inspect all roof sheathing and replace any rotten wood. (Estimate includes up to 3 sheels plywood sheathing replacement at no charge. For additional lumber replacement costs, see attached sheet. 3. Install 8-D "ring -shank" fasteners to existing sheathing / deck to meet current Building Code Requirements. 4. Install (2) ply #30 It. roofing felt over sheathing, and mechanically fasten using approved fasteners per code requirements. 5. Install new roofing accessories including: drip edge, plumbing stack 0ashings, vents, and valley metal. (Accessories to be shop fabricated using 26 gauge Galvanized materials, standard colors.(with metal roof options, accessories will be made to match metal roofing panels). 6. Seal all penetrations using approved rooting cement and/or stations. 7. All new roofing materials / accessories will be installed using approved fasteners per code requirements. 8. Satellite dish, Solar panels, etc. to be removed by others prior to commencement ofwork- unless disposing of items. 9. (Flat/Low-Slope mofarea's, Aluminum structures, gutters, skylights. etc. not included. 10. 'Thoroughly clean project of all "mofing related debris" and haul away. (Landfill fees me included). Shingles Install Architectural Shingles -{Lifetime Warranty/130mph)--Owens Corning-Duration-----511,500.00 Options: *Upgrade to Peel o Stick**aired barrier, deck) for wind mettgation credit —{SWB) ----- *(Secondary water barrier, &for wind mitigation credits from insurance co). ---- ----- ..-. _... _.„... a ......... I .............. oo,,, .a. n. Any alteration or deviation from the above specifications involving additional costs will be executed only upon written orders, and will became an came charge aver and above the estimate. Replacement of rotteNdamaged lumber is not included in estimate unless specified. Customer must provide access inbuilding unless arrangements are made prior to estimate, therefore 1.A. Taylor Roofing is not responsible for damage m driveway/sidewalks and/or any other access areas needed to approach projects. Any client that is in default in the payment of money due under terms of this account will be charged al the rme aft 'h %per month on the unpaid balance, (Maximum allowable by law). If any client is referred to an sttomey, for collection, client agrees to pay all fees incurred in the collection of the amount due, plus on court costs and anomey fees. Work will be scheduled upon written acceptance of this proposal. Tustin pass] may be withdrawn from us if not accepted within 30 days. *All major credit cards accepted, however an additional processing fee itup be assessed to contract rated depending on content monthly rate and card used. P tT A/3D 'tA tl/3 tr I ftl Bel C IH fP it EPT NCE OF PROPOSA I.. _ .EPT NCE OF PROPOSAL - Date: - r - - — Thank you for the opportunity to bid your project! ***Serving the Treasure Coast for over 56 Years**x********x Respectfully Submitted By: Tim Parmiter Phone:772-521-7877 J.A. Taylor Roofing, Inc. 302 Melton Dr. Ft. Pierce, FL 34982 (772-466-4040) (Fax 772-468-8397)