HomeMy WebLinkAboutSEFTEN roof infoTAYLo.
ROOFING CONTRACTOR
"Estimate/Contract/Proposal"
Customer/Owner/Steften,.lin (Palm Grove) Mobile:
Project Address:6049 Petticoat Pl. Ft Pierce F1. 34982 Phone:772-925-9020
Billing Adresssarre has
Date'Tvne/Code:4-20-2021.shinale.305.12 Email:
1.A. taylor Hoofing will provide necessary permits, schedule all inspections with related Municipality. and maintain Current License and
Insurance. I his proposal includes labor, materials, and all taxes. Please note that `Oil Canning" is a characteristic of all metal mofsystems and is
not a cause for rejection. Our highly trained "Professional" installers will hereby complete me following:
I. Remove existing roofing materials down to sheathing / decking and prepare as needed to ensure a clean, solid surface
in which to apply a new roof. (Based on one layer tear off, additional layers at extra cost).
2. Inspect all roof sheathing and replace any rotten wood. (Estimate includes up to 3 sheets plywood sheathing
replacement at no charge. For additional lumber replacement costs, see attached sheet.
3. Install 8-D "ring -shank' fasteners to existing sheathing / deck to meet current Building Code Requirements.
4. Install (2) ply #30 lb. roofing felt over sheathing, and mechanically fasten using approved fasteners per code
requirements.
5. Install new roofing accessories including: drip edge, plumbing stack fiashings, vents, and valley metal. (Accessories to
be shop fabricated using 26 gauge Galvanized material& standard colom.(w ith metal roof options, accessories will be
made to match metal roofing panels).
6. Seal all penetrations using approved roofing cement and/or sealants.
7. All new roofing materials / accessories will be installed using approved fasteners per code requirements.
8. Satellite dish, Solar panels, etc. to be removed by others prior to commencement of work, unless disposing of items.
9. (Fiat/Low-Slope roofarea's, Aluminum structures, gutters, skylights, etc. not included.
10, Thoroughly clean project ofall'Tooftng related debris" and haul away. (Landfill fees are included).
Shingles
Install Architeetural Shingles ---(Lifetime Warranty/13omph)—Owens Corning -
Duration --Options: ��j�.����j%�
'Cpgrade to Peel &Stick* (direct to deck) for wind
menq Additional-urance
"(Secondary water barrier, &for wind mitigation credits from insurance eo).
J.A. Taylor Roofinu will Provide a (5) Year "Leak Free" workmanship warranty from date of come Dletion.
Any alteration or deviation from the above specifications involving additional cons will be executed only upon written orders, and will become
an extra change over and above the eatimaze. Replacement of ronerddamaged lumber is not included in estimate unless specified. Customer must
provide access to building unless arrangements are made prior to astimme, therefore 1.A. Taylor Roofing is not responsible for damage to
driveway/sidewalks and/or any other access areas waited to approach projects. Any client that is in default in the payment of money due under
names of this account will be charged at me rate of 1 'Fe % per month on the unpaid balance, (Maximum allowable by law). If any client is referred
m an anerory for collection, client agrees to pay all fees incurred in the collection ofthe amount due, plus all court comes and attorney fees. Walk
will be scheduled upon written acceptance of this proposal. This p` yQQposm may be with l n from us if not accepted within 30 days. *AII major
credit cards accepted, however an additional processing fee of up P S / will th assessed to eontmc[ total depending on current momhly raze and
..it used. PP�ent TsreuX3 Deposit AC�menceand Ill vmeot completion of dry -ire. Balance noon Completion of Pro'ect
Arm Date:/�(/7f/
Date:
Thank you for the opportunity to bid your project!
**********Serving the Treasure Coast for over 56 Years**********'
Respectfully Submitted By: Tim Parmiter Phone:772-521-7877
J.A. Taylor Roofing, Inc. 302 Melton Dr. Ft. Pierce, Ft. 34982 (772-466-4040) (Fax 772468-8397)
.)Ir ILUCG
o (' ST. LUCIE VVORKS
ST LUCIE COUNTY ROOFING PERMIT INFORMATION SHEET
Florida Building Code 7th Edition (2020)
Based on Section 1525 of the Florida Building Code -Building
INSTRUCTION PAGE
COMPLETE THE NECESSARY SECTIONS OF THE UNIFORM ROOFING SHEET
APPLICATION FORM AND ATTACH THE REQUIRED DOCUMENTS AS NOTED
BELOW:
Roof System
Required Sections of
the Permit Application
Form
Attachments Required
See List Below
Low Slope Application
A, B,C
1,2,3,4AS.7 -
Prescriptive BUR-RAS 150
A, B, C
2,4,5,6,7
Asphaltic Shingles
A, B, D
1,2,4,8,8,7
Concrete or Clay Tile
A, B, D, E
1,2,38,5.8,7
Metal Roofs
A, B, D
Wood Shingles and
Shakes
A, B, D
1,2.4,6,8,7
Other
As Applicable
1A3,4,6,8,7
ATTACHMENTS REQUIRED As Applicable):
1.
Fire Directory Listing Page
2.
From Product Approval:
Front Page
Specific System Description
Specific System Limitations
General Limitations
Applicable Detail Drawings
3.
Design Calculations per Chapter 16, or if applicable, RAS 127 or RAS 128
4.
Other Component of Product Approval
S.
Municipal Permit Application
6.
Owners Notification for Roofing Considerations (Reroofing Only)
7.
Any Required Roof Testing/Ca lculation Documentation
Form RaaflnfoFeb21 Rev Feb 18, 2021
ST. LUCIE ..,CORKS
Section C (Low Slope Roof)
Fill in specific roof assembly components and identify
manufacturer
(If a component is not used, identify as "NA")
System Manufacturer:
Product Approval No.:
Design Wind Pressures, From RAS 128 Or Calculations:
Zone 1':_Zone 1: Zone 2: Zone 3:
Max. Design Pressure, from the specific product approval
system:
Deck:
Type:
Gauge Thickness:
Slope:
Anchor/Base Sheet & No. elf Ply(s):
Anchor/Base Sheet Fastener/Bonding Material:
Insulation Base Layer.
Base Insultation Size and Thickness:
Base Insulation Fastener/Bonding Material:
Top Insulation Layer:
Top Insulation Size and Thickness:
Top Insulation Fastener/Bonding Material:
Base Sheet(s) & No. of Ply(s):
Base Sheet Fastener/Bonding Material:
Ply Sheet(s)' & No. of Ply(s):
Ply Sheet Fastener/Bonding Material:
Top Ply:
Top Ply Fastener/Bonding Material:
Fastener Spacing for Anchor/Base Sheet Attachment:
Zone 1':_"
oc @ Lap, # Rows_ ®_' co
Zone 1—"
oc @ Lap, # Rows _ ®_° oo
Zone 2_"
oc @ Lap, # Rows — _° m
Zone 3:—"
oc @ Lap, If Rows— ® _° co
Number of Fasteners Per Insulation Board:
Zone 1':_Zone 1-Zone 2:_Zone 3:_
Illustrate Components Noted and Details as Applicable:
Woodblocking, Gutter, Edge Termination, Stripping,
Flashing, Continuous Cleat, Cant Strip, Base Flashing,
Counterflashing, Coping, Etc..
Indicate: Mean Roof Height, Parapet Height, Height of Base
Flashing, Component Material, Material' Thickness, Fastener
Type, Fastener Spacing or Submit Manufacturers Details that
Comply with RAS 111 and Chapter 16..
ST. LUCIE WORKS
Section D (Steep Slope Roof System)
Roof System Manufacturer: OWENS CONRING DURATION
Notice of Acceptance Number: FL#10674.1
Minimum Design Wind Pressures, IF Applicable (From RAS 127 or Calculations):
Zone 1: -71 Zone 2e:-91_Zone 2n:one 2r:-ql Zone 3e:-111 Zone 3r:
OOD
nt 2PLY APOC 30#FELT DNDEMAYMENT(NOA#1a-110a 03)
Roof Slope
5 12
rrier:
Ridge Ventilation?tenerType&Spacing: a'FIELD/f' PERIMETER, ID RING SHANK NAILS
Adhesive Type:
Type Cap Sheet-�
Mean Rod :\Deok
Roof Covering SHINGLES
Type & Size Drip FX2
Friw
ST. LUCIE WORKS
Section E (Tile Calculations)
For Moment based tile systems, choose either Method 1 or 2. Compare the values for Mr with the values from Mi. If the Mr values
are greaterthan or equal to the M,values, for each area of the roof, then the tile attachment method is acceptable.
Method 1'Moment Based Tile Calculations Per RAS 12T
(Zone 1: _xl_= _ )-Mg:_=Md_ Product Approval ivt
(Zone 2e: _xi._= _ I- Mg: _=M, _ Product Approval M,
(Zone 2n: -_xx_= _)-Mg:_=Ma,_ Product Approval Mr
(Zone 2r: _XL_= _)-Mg:_=Ma_ Product Approval Mr
(Zone 3e:-_x1._= _)- Mg: _=Mrs, _ Product Approval Mi
(Zone 3r: '-X)L.-=-J-lit: _=Ma- Product Approval Mr
Method 2 "Simplified Tile Calculations Per Table Below"
Required Moment of Resistance (Mr) From Table Below- Product Approval M,
Mr required Moment Resistance"
Mean Roof Height Roof Slope
15'
20'
25'
30'
40'
2:12
34.4
1 36.5
38.2
39.7
42.2
3:12
32.2
34.4
36.0
37.4
39.8
4:12
30.4
32.2
33.8
35.1
37.3
5:12
28.4
30.1
31.6
32.8
34.9
6:12
26.4
28.0
29.4
30.5
32.4
7:12
24.4
25.9
27.1
28.2
30.0
-Must are used In conjunction with a list Ot moment based tile systems
• For Uplift based tile systems use Method 3. Compare the values for F' with the values for F, if the F'values are greater than or
equal to the F, values, for each area of the roof, then the tile attachment method is acceptable.
Method 3 "Uplift Based Tile Calculations Per RAS 12T
(Zone 1: a L= x W:=____j -W:_ cos r =Fa Product Approval F'
(Zone 2e:x L=xW:=)-W cos r=Fa:_ Product Approval F'
(Zone 2n:_x LxW:=)-W:cos r=Fa" Product Approval F'
(Zone 2r: x L =x W:= ) -W: Cos r Far_ Product Approval F'
(Zone 3e:x L=uW:=_J-W:cos r= Fx Prod uct Approva l F'
(Zone 3r: x L=x W:=)-W:Cos r=Far_ Product Approval F'
Where to Obtain Information
Description
Symbol
Where to find
Design Pressure
Zones 1, 2e, Zn, 2r, 3e, 3r
From applicable table in RAS 127 or by an engineering analysis
prepared by PE based on ASCE 7
Mean Root Height
H
Job Site
Roof Slope
B
Job Site
Aerodynamic Multiplier
a
Product Approval
Restoring Moment due to Gravity
Mt
Product Approval
Attachment Resistance
M,
Product Approval
Required Moment Resistance
Mc
Calculated
Minimum Attachment Resistance
F'
Product Approval
Required Uplift Resistance
F,
Calculated
Average Tile Weight
W
Product Approval
rile Dimensions
L=length W=width
Product Approval
All calculations must be submitted to the building official at the time of permit application.