Loading...
HomeMy WebLinkAboutAPPROVED, SCOPE OF WORK FOR 11000 SOUTH OCEAN DRSCOPE OF WORK FOR 11000 SOUTH OCEAN DR, UNIT 5-G The below is the only work we are doing. Any other work- such as any drywall needed will be completed by others. Only replacing kitchen cabinets Plumbing- Replace in existing locations- kitchen sink, faucet, disposal, waterline for fridge, dishwasher and water shut off valve. Elec- Install circuit for microwave, install outlet at penn cabinets, change existing outlets to white GFI’s, change range from existing 3 prong plug to a 4 wired direct wired connection.