Loading...
HomeMy WebLinkAboutAPPROVED Pinedo Mechanical PlanCEILING FL'214239 EYE BOLT DRILLED THROUG11 TOP CHORD ' DCOUBLE LOOP CHAIN EQUIPMENT SCHEDULE CARRIER 4 TON C.U. — CH14NBO48P A. H.U. — FB4CNP060L HEAT — 05 KW COOL CAP. — 46,500 --- HEAT CAP — 46,500 A/C COMP, ON CONC. PAD ELECT - 208-230-1 BRKR CU- 40 AHU-30 REF. LINES -7./8 & 318 S. E. E. R. -14.50 HSPF - 8.20 E � h AIR CONDITIONING MECHANICAL,Inc. CAC1817665 General Notes 1643 DONNA ROAD WPB, FL. 33409 5 6 1 — 6 8 9— 1 0 9 3 831 S. KINGS HWY FT. PIERCE, FL. 34945 7 7 2— 87 8— 75 7 7 No. Revi ion/Issu Date vL ALL IDEAS, DESIGNS, ARRANGEMENTS, AND PLANS INDICATED OR REPRESENTED BY THIS DRAWING ARE OWNED BY AND PROPERTY OF THIS OFFICE, AND WHERE CREATED, EVOLVED, AND DEVELOPED FOR US ON, AND IN CONNECTION WITH THE SPECIFIED PROJECT. NONE OF SUCH IDEAS, DESIGNS, ARRANGEMENTS, AND PLANS SHALL BE USED BY, OR DISCLOSED TO ANY PERSON,FIRKOR CORPORA11ON FOR ANY PURPOSE WITHOUT WRITTEN PERMISSION OF PREFERRED AIR CONDITIONING & MECHANICAL, INC. NEW RESIDENCE FOR: MODEL: WILDFLOWER 5/3 �Ic''or i (doe, 'Fort I �" , CUSTOER: PINEDO FT. PIERCE DRAWING: FLOOR PLAN Project Sheet Date uo Scale m