Loading...
HomeMy WebLinkAboutCreekside Lot 48 Prepower.pdfUTMI'' LE [k �A,, L� ENGINEERING SCIENCES /29'�9_ Inspection Date: —d o - pl / Project: Address: INSPECTION RESULTS Permit No. F a � Check one: Regular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL I I ELECTRICAL Slab Structural Sheet Rock Final Other Inspection Type Floor Wall I Protection Final Electrical PLUMBING Stack Piping & Test Water Piping & Test Gas Piping & Test Storm Piping & Test Fixtures Equipment Final Area Inspected/Code: � %,t� - i Inspection Results:).AP-Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved ❑ Not Ready Conditions/comments: 1. 2. 3. 4. 5. 6. 7. Inspectors Lic.tl: �3 Duct Rough -in Steam Piping & Test HWHW Piping CHWCHW Piping 8�Test Cond. Piping & Test Wall & Final Mechanical ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com