Loading...
HomeMy WebLinkAboutCreekside Lot 70 Roof Final.pdfR 3 U 141\f E R b, L� CRGINEERINC SCIIENCES Mr, INSPECTION RESULTS Inspection Date: — - of I Permit No. Project:CA Address: 3 7 r } Check one: Regular Inspection: O Reinspection Date of Initial Inspection: Inspection Type Requested (check): aDf l - � t 77 7-O0 -,� BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough-tn Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Tesi H W Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping &Test CHW Piping & 7es1 Framing Panel/Feeder Gas Piping &Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & CcIline Protection Final Building Final Electrical Final Plumbing F inn h — IIOI11c01 Other Inspection Type: Area Inspected/Code:1e 7 Inspection Results-,X AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved ❑ Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7, Inspectors Name: I {�9 X�_i Lic,ft: 61U 1 ��� t OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa corn