Loading...
HomeMy WebLinkAboutRoofing Info Sheets ST. LUCIE WORKS Section A(General Information) Master Permit No. Process No. Contractors Name �y �h" � 1" License# Job Address ROOF CATEGORY ❑Low Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles ❑Asphaltic Shingles j2Vetal Panel/Shingles ❑Wood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE. ❑ New roof ❑ Repair ❑ Maintenance "VI'rroofing ❑Recovering ROOF SYSTEM INFORMATION Low Slope Roof Area(SF) Steep Sloped Roof Area (SF) �t Total(SF) "—��'- Section B(Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets. � I ' I. + I , + . l I it ST. LUCIE WORKS Section C(Low Slope Roof) Surfacing: Fill in specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment: manufacturer Zone 1':_."oc @ Lap,#Rows_®'oc (If a component is not used,identify as"NA") Zone 1:_.._."oc @ Lap,#Rows_®=oc System Manufacturer: Zone 2:_"oc @ Lap,#Rows_®_oc Zone 3:—" oc @ Lap,#Rows_®'oc Product Approval No.: Number of Fasteners Per Insulation Board: Design Wind Pressures,From RAS 128 Or Calculations: Zone 1': Zone 1: Zone 2: Zone 3: Zone 1':_Zone 1: Zone 2:_Zone 3: Illustrate Components Noted and Details as Applicable: Max. Design Pressure,from the specific product approval Woodblocking, Gutter, Edge Termination, Stripping, system: Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing,Coping,Etc.. " Deck: Indicate: Mean Roof Height, Parapet Height, Height of Base Type: Flashing,Component Material,Material'Thickness,Fastener Type,Fastener Spacing or Submit Manufacturers Details that Gauge Thickness: Comply with RAS 111 and Chapter 16.. Slope: Anchor/Base Sheet&No.df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: FT. Insulation.Base Layer: Base Insultation Size and Thickness: Parapet Base Insulation Fastener/Bonding Material: Height Top Insulation Layer: Top Insulation Size and Thickness: FT. Top Insulation Fastener/Bonding Material:o , Mean Base Sheet(s)&No.of Ply(s): Roof Base Sheet Fastener/Bonding Material: Height Ply Sheet(s)'&No.of Ply(s): Ply Sheet Fastener/Bonding Material: Top Ply: Top Ply Fastener/Bonding Material: A ST. LUCIE WORKS Section D (Steep Slope Roof System) ,,,/� Roof System Manufacturer: "Il4 Al a� PI'a7 `� ?'- /1/019 419- Notice of Acceptance Number: Minimum Design Wind Pressures,If Applicable(From RAS 127 or Calculations): Zone 1:.--2L�Zone 2e: Zone 2n: Zone 2r:�Zone 3e: Zone 3r: Deck Type: • Type Underiayment �` f!� � _ P �U 17 ✓cU •L4'h Roof jope: —' 12 Insulation: Fire Barrier: Ridge Ventilation? Fastener Type&Spacing: ��p �'�, -( -, j �� `'a"�Y ''r �'�''``� -okw, Lit", Adhesive Type: F 0, C Type Cap Sheet Mean Roof Height: _ Z Roof Covering: Type&Size Drip Edge: