HomeMy WebLinkAboutRoofing Info Sheets ST. LUCIE WORKS
Section A(General Information)
Master Permit No. Process No.
Contractors Name �y �h" � 1" License#
Job Address
ROOF CATEGORY
❑Low Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles
❑Asphaltic Shingles j2Vetal Panel/Shingles ❑Wood Shingles/Shakes
❑ Prescriptive BUR-RAS 150
ROOF ROOF TYPE.
❑ New roof ❑ Repair ❑ Maintenance "VI'rroofing ❑Recovering
ROOF SYSTEM INFORMATION
Low Slope Roof Area(SF) Steep Sloped Roof Area (SF) �t Total(SF) "—��'-
Section B(Roof Plan)
Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains.
Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets.
� I
' I.
+
I ,
+ . l
I
it
ST. LUCIE WORKS
Section C(Low Slope Roof) Surfacing:
Fill in specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment:
manufacturer Zone 1':_."oc @ Lap,#Rows_®'oc
(If a component is not used,identify as"NA") Zone 1:_.._."oc @ Lap,#Rows_®=oc
System Manufacturer: Zone 2:_"oc @ Lap,#Rows_®_oc
Zone 3:—" oc @ Lap,#Rows_®'oc
Product Approval No.:
Number of Fasteners Per Insulation Board:
Design Wind Pressures,From RAS 128 Or Calculations: Zone 1': Zone 1: Zone 2: Zone 3:
Zone 1':_Zone 1: Zone 2:_Zone 3: Illustrate Components Noted and Details as Applicable:
Max. Design Pressure,from the specific product approval Woodblocking, Gutter, Edge Termination, Stripping,
system: Flashing, Continuous Cleat, Cant Strip, Base Flashing,
Counterflashing,Coping,Etc..
" Deck: Indicate: Mean Roof Height, Parapet Height, Height of Base
Type: Flashing,Component Material,Material'Thickness,Fastener
Type,Fastener Spacing or Submit Manufacturers Details that
Gauge Thickness:
Comply with RAS 111 and Chapter 16..
Slope:
Anchor/Base Sheet&No.df Ply(s):
Anchor/Base Sheet Fastener/Bonding Material: FT.
Insulation.Base Layer:
Base Insultation Size and Thickness: Parapet
Base Insulation Fastener/Bonding Material: Height
Top Insulation Layer:
Top Insulation Size and Thickness: FT.
Top Insulation Fastener/Bonding Material:o
,
Mean
Base Sheet(s)&No.of Ply(s): Roof
Base Sheet Fastener/Bonding Material: Height
Ply Sheet(s)'&No.of Ply(s):
Ply Sheet Fastener/Bonding Material:
Top Ply:
Top Ply Fastener/Bonding Material: A
ST. LUCIE WORKS
Section D (Steep Slope Roof System) ,,,/�
Roof System Manufacturer: "Il4 Al a� PI'a7 `� ?'- /1/019 419-
Notice of Acceptance Number:
Minimum Design Wind Pressures,If Applicable(From RAS 127 or Calculations):
Zone 1:.--2L�Zone 2e: Zone 2n: Zone 2r:�Zone 3e: Zone 3r:
Deck Type:
• Type Underiayment �` f!� � _ P �U 17 ✓cU •L4'h
Roof jope:
—' 12 Insulation:
Fire Barrier:
Ridge Ventilation? Fastener Type&Spacing: ��p �'�, -( -, j �� `'a"�Y ''r �'�''``� -okw,
Lit",
Adhesive Type: F 0, C
Type Cap Sheet
Mean Roof Height: _ Z Roof Covering:
Type&Size Drip
Edge: