HomeMy WebLinkAboutAPPROVED HR7710 NOA NOA No. 20-0406.04
Expiration Date: August 23, 2023
Approval Date: August 27, 2020
8/19/20 Page 1
MIAMI–DADE COUNTY, FLORIDA
PRODUCT CONTROL SECTION
11805 SW 26 Street, Room 208
DEPARTMENT OF REGULATORY AND ECONOMIC RESOURCES (RER) Miami, Florida 33175-2474 NOTICE OF ACCEPTANCE (NOA) www.miamidade.gov/building
PGT Industries, Inc.
1070 Technology Drive
North Venice, FL 34275
SCOPE:
This NOA is being issued under the applicable rules and regulations governing the use of construction
materials. The documentation submitted has been reviewed and accepted by Miami-Dade County RER -
Product Control Section to be used in Miami Dade County and other areas where allowed by the Authority
Having Jurisdiction (AHJ).
This NOA shall not be valid after the expiration date stated below. The Miami-Dade County Product Control
Section (In Miami-Dade County) and/or the AHJ (in areas other than Miami-Dade County) reserve the right to
have this product or material tested for quality assurance purposes. If this product or material fails to perform
in the accepted manner, the manufacturer will incur the expense of such testing and the AHJ may immediately
revoke, modify, or suspend the use of such product or material within their jurisdiction. RER reserves the
right to revoke this acceptance if it is determined by Miami–Dade County Product Control Section that this
product or material fails to meet the requirements of the applicable building code.
This product is approved as described herein and has been designed to comply with the Florida Building Code,
including the High Velocity Hurricane Zone.
DESCRIPTION: Series “HR7710A” Aluminum Horizontal Roller Window – L.M.I.
APPROVAL DOCUMENT: Drawing No. 7710NOA-1, titled “Aluminum Horiz. Roller Install (LM)”,
sheets 1 through 19 of 19, dated 06/30/18, with revision A dated 03/11/20, prepared by manufacturer, signed
and sealed by Anthony Lynn Miller, P.E., bearing the Miami-Dade County Product Control Revision stamp
with the Notice of Acceptance number and expiration date by the Miami-Dade County Product Control Section.
MISSILE IMPACT RATING: Large and Small Missile Impact Resistant
LABELING: Each unit shall bear a permanent label with the manufacturer's name or logo, city, state,
model/series, and following statement: "Miami-Dade County Product Control Approved", unless otherwise
noted herein.
RENEWAL of this NOA shall be considered after a renewal application has been filed and there has been no
change in the applicable building code negatively affecting the performance of this product.
TERMINATION of this NOA will occur after the expiration date or if there has been a revision or change in
the materials, use, and/or manufacture of the product or process. Misuse of this NOA as an endorsement of any
product, for sales, advertising or any other purposes shall automatically terminate this NOA. Failure to comply
with any section of this NOA shall be cause for termination and removal of NOA.
ADVERTISEMENT: The NOA number preceded by the words Miami-Dade County, Florida, and followed
by the expiration date may be displayed in advertising literature. If any portion of the NOA is displayed, then
it shall be done in its entirety.
INSPECTION: A copy of this entire NOA shall be provided to the user by the manufacturer or its distributors
and shall be available for inspection at the job site at the request of the Building Official.
This NOA revises NOA No. 18-0627.01 and consists of this page 1 and evidence pages E-1, E-2, E-3 and
E-4, as well as approval document mentioned above.
The submitted documentation was reviewed by Manuel Perez, P.E.
Manuel Perez, P.E.
Product Control Examiner
NOA No. 20-0406.04
Expiration Date: August 23, 2023
Approval Date: August 27, 2020
E - 1
PGT Industries, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
1. EVIDENCE SUBMITTED UNDER PREVIOUS NOA’s
A. DRAWINGS
1. Manufacturer's die drawings and sections.
(Submitted under NOA No. 18-0627.01)
2. Drawing No. 7710NOA-1, titled “Aluminum Horiz. Roller Install (LM), sheets 1
through 19 of 19, dated 06/30/18, prepared by manufacturer, signed and sealed by
Anthony Lynn Miller, P.E.
(Submitted under NOA No. 18-0627.01)
B. TESTS
1. Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
6) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94
along with marked-up drawings and installation diagram of an aluminum horizontal
sliding window, prepared by Fenestration Testing Laboratory, Inc., Test Report No.
FTL-18-7891, dated 06/06/18, signed and sealed by Idalmis Ortega, P.E.
(Submitted under NOA No. 18-0627.01)
2. Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
6) Forced Entry Test, per FBC 2411.3.2.1, and TAS 202-94
along with marked-up drawings and installation diagram of an aluminum horizontal
sliding window, prepared by Fenestration Testing Laboratory, Inc., Test Report No.
FTL-18-7891.01, dated 07/03/18, signed and sealed by Idalmis Ortega, P.E.
(Submitted under NOA No. 18-0627.01)
C. CALCULATIONS
1. Anchor verification calculations and structural analysis, complying with FBC 6th
Edition (2017), dated 06/18/18 and updated on 07/25/18, prepared by manufacturer,
signed and sealed by Anthony Lynn Miller, P.E.
(Submitted under NOA No. 18-0627.01)
2. Glazing complies with ASTM E1300-09
Manuel Perez, P.E.
Product Control Examiner
NOA No. 20-0406.04
Expiration Date: August 23, 2023
Approval Date: August 27, 2020
E - 2
PGT Industries, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
1. EVIDENCE SUBMITTED UNDER PREVIOUS NOA’s (CONTINUED)
D. QUALITY ASSURANCE
1. Miami-Dade Department of Regulatory and Economic Resources (RER).
E. MATERIAL CERTIFICATIONS
1. Notice of Acceptance No. 17-1114.14 issued to Kuraray America, Inc. for their
“Trosifol® Ultraclear, Clear and Color PVB Glass Interlayers” dated 01/18/18,
expiring on 07/08/19.
2. Notice of Acceptance No. 17-0808.02 issued to Kuraray America, Inc. for their
“SentryGlas® (Clear and White) Glass Interlayers” dated 12/28/17, expiring on
07/04/23.
F. STATEMENTS
1. Statement letter of conformance to FBC 6th Edition (2017), dated July 25, 2018, issued
by manufacturer, signed and sealed by Anthony Lynn Miller, P.E.
(Submitted under NOA No. 18-0627.01)
2. Statement letter of no financial interest, dated July 25, 2018, issued by manufacturer,
signed and sealed by Anthony Lynn Miller, P.E.
(Submitted under NOA No. 18-0627.01)
3. Proposal No. 18-0289 issued by the Product Control Section, dated 02/20/18, signed by
Manuel Perez, P.E
(Submitted under NOA No. 18-0627.01)
G. OTHERS
1. None.
Manuel Perez, P.E.
Product Control Examiner
NOA No. 20-0406.04
Expiration Date: August 23, 2023
Approval Date: August 27, 2020
E - 3
PGT Industries, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
2. NEW EVIDENCE SUBMITTED
A. DRAWINGS
1. Drawing No. 7710NOA-1, titled “Aluminum Horiz. Roller Install (LM), sheets 1
through 19 of 19, dated 06/30/18, with revision A dated 03/11/20, prepared by
manufacturer, signed and sealed by Anthony Lynn Miller, P.E.
B. TESTS
1. Test reports on: 1) Air Infiltration Test, per FBC, TAS 202-94
2) Uniform Static Air Pressure Test, Loading per FBC, TAS 202-94
3) Water Resistance Test, per FBC, TAS 202-94
4) Large Missile Impact Test per FBC, TAS 201-94
5) Cyclic Wind Pressure Loading per FBC, TAS 203-94
6) Forced Entry Test, per ASTM F588 and TAS 202-94
along with marked-up drawings and installation diagram of all PGT Industries, Inc.
representative units listed below and tested to qualify Dowsil 791 and Dowsil 983
silicones, prepared by Fenestration Testing Laboratory, Inc., Test Reports No.:
FTL-7897, PGT PW5520 PVC Fixed Window (unit 6 in proposal), dated 09/03/14
FTL-20-2107.1, PGT SGD780 Aluminum Sliding Glass Door (unit 7 in proposal)
FTL-20-2107.2, PGT CA740 Alum. Outswing Casement Window (unit 8 in proposal)
FTL-20-2107.3, PGT PW7620A Aluminum Fixed Window (unit 9 in proposal) and
FTL-20-2107.4, PGT PW7620A Aluminum Fixed Window (unit 10 in proposal)
dated 07/13/20, all signed and sealed by Idalmis Ortega, P.E
C. CALCULATIONS
1. Anchor verification calculations and structural analysis, complying with FBC 6th
Edition (2017), prepared by manufacturer, dated 06/18/18, revised on 07/25/18 and
updated to the FBC 7th Edition (2020) on 04/02/20, signed and sealed by Anthony
Lynn Miller, P.E.
D. QUALITY ASSURANCE
1. Miami-Dade Department of Regulatory and Economic Resources (RER)
E. MATERIAL CERTIFICATIONS
1. Notice of Acceptance No. 19-0305.02 issued to Kuraray America, Inc. for their
“Trosifol® Ultraclear, Clear and Color PVB Glass Interlayers” dated 05/09/19,
expiring on 07/08/24.
2. Notice of Acceptance No. 18-0725.11 issued to Kuraray America, Inc. for their
“Kuraray SentryGlas® XtraTM (SGXTM) Clear Glass Interlayer” dated 05/23/19,
expiring on 05/23/24.
Manuel Perez, P.E.
Product Control Examiner
NOA No. 20-0406.04
Expiration Date: August 23, 2023
Approval Date: August 27, 2020
E - 4
PGT Industries, Inc.
NOTICE OF ACCEPTANCE: EVIDENCE SUBMITTED
2. NEW EVIDENCE SUBMITTED (CONTINUED)
F. STATEMENTS
1. Statement letter of conformance, complying with FBC 6th Edition (2017) and the
FBC 7th Edition (2020), dated March 10, 2020, issued by manufacturer, signed and
sealed by Anthony Lynn Miller, P.E.
2. Statement letter of no financial interest, dated March 10, 2020, issued by
manufacturer, signed and sealed by Anthony Lynn Miller, P.E.
3. Proposal No. 19-1155 TP issued by the Product Control Section, dated January 10,
2020, signed by Ishaq Chanda, P.E.
G. OTHERS
1. Notice of Acceptance No. 18-0627.01, issued to PGT Industries, Inc. for their Series
“HR7710A” Aluminum Horizontal Roller Window - L.M.I. approved on 08/23/18 and
expiring on 08/23/23.