Loading...
HomeMy WebLinkAboutEngineering Letter BREITENBACH ENGINEERING, INC johnbach442@gmail.com 4853 SE Pilot Way, Stuart, Florida 34997 Cell: (772)834-4743 April 10, 2019 To: Building Official, St. Lucie County, Building Division 2300 Virginia Avenue, Fort Pierce, Florida 34982 Re: Specialty Building Inspections for Threshold Building Permit #SLC-2007-0746 Project: Exterior Concrete Restoration Condo B Ocean Towers Condo Association Attn:Ted Grassi 772-485-5517 9400 S. Ocean Drive, Jensen Beach, FL 34957 General Contractor: Daniello &Associates Building Official: This letter is to inform you as threshold building special inspector, John Breitenbach PE 59770, SI #2072 that the Contractor, to the best of my knowledge, has successfully completed the Concrete Restoration Project as outlined in the Plans and Specifications of CSM Engineers, dated 6/17/20. The final inspection report is attached. Should you have any questions, please contract me. Respectfully, RECE11EID `\\���•�' gREI T ENBq•,,�%, Lucie County9 o ti �. S,SS 10 N NV C '; '�9264/OJiaf • John D. Breitenbach, PE FL PE #59770, FL SI #2072, Firm Reg. #26001 (2)-copies to Contractor, (1)-copy to CSM, (1)-copy to Condo Assoc, file= 20033-2-Ocea Twrs 6-2-21 Letter of Completion(B).doc -S 20033-2-Ocean Twrs Breitenbach Engineering, Inc Tel: 772-834-4743 johnbach442 a().gmail.com 4853 SE Pilot Way, Stuart, FL 34997 Permit Number: SLC-2007-0741 Attention: Doug Pendelton 772-485-5517 Job Number: 20033-2 e-mail: oceantowersoffice(cDg mail.Corn Condo Assoc: Ocean T" rondo B Contact: Chris Arias 9400 S. Ocean contractor: Daniello &Associates Jensen Beach, FL 34957 Address: 2708 N Australian, #9, WPB, FL 33407 By: John D. Breitenbach, PE Tel: 772-834-4743 Gate Code: 9490 PE#59770 SI #2072 iohnbach442(a�gmail.com Billing Method: 2.50% HOUrs _scriptie Pass/Fail 1 8/14/20 Administrative Letter of Intent, review specifications,forms n.a. 2 9/29120 1st inspection Tues 9:301 Units 301,302,303,401,402. & 501-demo progress 3 10/12/20 (rained out) Mon 11:00 n.a. 4 10/13120 Stack 1 10:00 1001 stucco OK; 901 OK,: 801 remove floor cover progress same 701 OK; 601 nothing; 501 1/4 column: progress same 401 minor, 101 1/2 column progress 10/14/20 Stack 2 Wed 9:30 1002 NE corner stucco; 902 2'x4' ready; 702#3-U; 602 SE corner OK; remove Floor coating; 502 NE& SE slab corners, add#3-U; 402 more excavation 202 need more excavation 10/16/20 Stacks 1 & 2 Fri 9:30 Stack 1-90% passed; stack 2-60% passed progress 10/19/20 Stacks 1 &2 memo, top floor facia crack noticed progress 8 r:r, r)-t h - Administrative, reports & mailing n.a. 9 11/2/20 (too windy) Mon 11:00 entry canopy demo,(11/6/20 passed) passed 10 11/6/20 all floors progress 11 11113/20 (stop by) progress 12 11/16/20 Stacks 2 &3 (304, 204), (306,206), (309,209) passed 13 all other floors progress 14 11/20/20 Stacks 4&5 1005, 1004, 1007, 607, 507,701 progress 15 e-mail 805, 704 passed end November Administrative, reports & mailing n.a. 16 12/1/20 Stacks 2-3,4-5,6-7 Tues 9:30 all floors, 80-90%ready progress 17 12/9120 Stacks 6-7, #205 Wed 9:30 98% ready passed 18 12/18/20 Fri 9:30 demo unit 205, 1/2 poured progress 19 1/4/21 Stack 8 Mon 1:00 (stop-by) progress 20 1/6/21 Stack 8 all floors, demo, &mark-up progress 21 1/13/21 Stack 8 all floors, progress, and pre-pour some, hdr @308 approved 22 3/17/21 Roof Wed 11:00 Stucco repair at sill, west sid N:�`` ''�r., passed Units 109, 209 misc repai `° '� passed end Dec, Jan-March G L 2 z Cosa`—O0T ;> � = Inspections are performed by the special inspector per the permitted plans and specifiG3tio s acco o e I ,bnal Concrete Repair Institute(ICRI).The FBG and ACI-318 do not address concrete restoration.City aPl� rtty fgtlr law. Total Hrs: 0.00 See Letter of Intent and the Engineer's Plans& z t6�4itf Wditional information. 20033-2-Ocean Twrs �rr,.,r�uut►►