Loading...
HomeMy WebLinkAbout200959-2d Compaction - signedHeadquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net July 21, 2021 KSM JOB # :200959-2d/MR/jam CONTRACTOR:John Sweeney 14488 Dalia Ave Fort Pierce, FL 34952 JOB LOCATION:5281 Tree Top Trail Fort Pierce, Florida PERMIT #:SLC 2103-0171 Respectfully, PE # 81439 07/21/21 To Whom it may concern, Enclosed, please find the nuclear density test results performed on the Compacted Foundation Fill for the Carport at the above referenced project. Should you have any questions, please feel free to contact our office. Bryan E. Dahlke, P.E. V.P. of Engineering Proudly Serving Florida since 1990 Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Email: sweens1958@gmail.com Certified Women Owned Business - WBE Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting Headquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net KSM JOB #:200959-2d/MR/jam NUC #276 Nuc Model:MC-DR Nuc Serial #:MD40107276 5281 Tree Top Trail Fort Pierce, Florida Compacted Foundation Fill for the Carport DEPTH PEN READ DRY DENSITY MAX. DRY PROCTOR VALUE (P.C.F) PERCENT COMPACTION 1 S.W.0" - 12"50 109.0 110.4 98.7% 2 Center "49 108.4 "98.2% 3 N.E."48 107.6 "97.5% Proctor Optimum Moisture: Proctor Max. Dry Density: P.C.F. @ Test Locations the Density & Penetrometer readings indicate the Degree of Compaction Meets Minimum Requirement 7/21/2021 Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting ITEM TESTED: Disclaimer:Contractor is responsible to maintain the tested area in the condition that KSM completed the indicated passed compaction test. KSM is not responsible if the tested area has been altered from the approved inspected condition. Soil Description: Proudly Serving Florida since 1990 Certified Women Owned Business - WBE 9.7% PE # 81439 for Staked Foundation 110.4 TEST LOCATION OF SAMPLE JOB LOCATION: Brown Sand CONTRACTOR:John Sweeney SOIL COMPACTION REPORT ASTM D 1557 and ASTM D 6938 DATE TESTED:July 20, 2021 In Place Moisture: PERMIT #:SLC 2103-0171 Email: sweens1958@gmail.com 12.0% Bryan E. Dahlke, P.E. V.P. of Engineering Headquarters 11345 U.S. Highway 1 Sebastian, FL. 32958 Orlando 723 Progress Way Sanford, FL. 32771 Mailing PO Box 78-1377 Sebastian, FL. 32978 Phone: 772-589-0712 C.A.# 5693 KSMengineering.net DATE TESTED:July 20, 2021 KSM JOB # :200959-2d/MR/jam PERMIT #:SLC 2103-0171 CONTRACTOR:John Sweeney JOB LOCATION:5281 Tree Top Trail Fort Pierce, Florida Soil Description: Brown Sand Proctor Optimum Moisture: 12.0% Proctor Max. Dry Density: P.C.F. 110.4 Bryan E. Dahlke, P.E. V.P. of Engineering PE # 81439 7/21/2021 SOIL COMPACTION REPORT ASTM D 1557 Test report shall not be reproduced, except in full, without the written approval of KSM Engineering & Testing Certified Women Owned Business - WBE Proudly Serving Florida since 1990 Geotechnical Engineering - Construction Materials Testing - Special Inspections - Civil and Structural Consulting 105.0 106.0 107.0 108.0 109.0 110.0 111.0 112.0 7 8 9 10 11 12 13 14 15 W E I G H T P . C . F . D R Y Moisture -% of Dry Weight