HomeMy WebLinkAbout21-139 Bryn Mawr Bldg C - Report 1 07.20.21 DSignedM L Engineering Inc.
Consulting Engineers
Threshold Inspector
2030 37th Avenue
Vero Beach, Florida 32960
Phone: (772) 569-1257
Fax: (772) 569-4041
www.mlengineeringinc.com
Project No. 21-139 Report No. 1
Project Manager:
Building Official:
Contractor:
File
Mr. Gene Ross – Elliott Merrill Community Mgmt.
SLC Building Department
Mr. Chris Arias – Daniello & Associates, Inc.
Page 1 of 1
THRESHOLD INSPECTION REPORT
BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. C
5055 N. HWY A1A, FORT PIERCE, FL 34949
SLC BLDG. DEPT. PERMIT NUMBER: 2106-0415
PROJECT NAME: Bryn Mawr Condominiums DATE: July 20, 2021
CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL
CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Initial building walk through.
OBSERVATIONS:
• We walked the building with the contractor and used spray paint to indicate the areas for repair according to
the permitted documents.
• A crew will mobilize on site tomorrow to start the repairs.
RECOMMENDATIONS:
• All areas of repair shall be verified by the Engineer of Record prior to new concrete placement.
______________________________ _________________________________
Michael Lue, P.E. Todd Rhoten