Loading...
HomeMy WebLinkAbout21-139 Bryn Mawr Bldg C - Report 1 07.20.21 DSignedM L Engineering Inc. Consulting Engineers Threshold Inspector 2030 37th Avenue Vero Beach, Florida 32960 Phone: (772) 569-1257 Fax: (772) 569-4041 www.mlengineeringinc.com Project No. 21-139 Report No. 1 Project Manager: Building Official: Contractor: File Mr. Gene Ross – Elliott Merrill Community Mgmt. SLC Building Department Mr. Chris Arias – Daniello & Associates, Inc. Page 1 of 1 THRESHOLD INSPECTION REPORT BRYN MAWR CONDOMINIUMS CONCRETE REPAIRS 2021 – BLDG. C 5055 N. HWY A1A, FORT PIERCE, FL 34949 SLC BLDG. DEPT. PERMIT NUMBER: 2106-0415 PROJECT NAME: Bryn Mawr Condominiums DATE: July 20, 2021 CLIENT: Elliott Merrill Community Management LOCATION: Fort Pierce, FL CONTRACTOR: Daniello & Associates, Inc. PROJECT MGR: Mr. Chris Arias INSPECTED BY: Todd Rhoten WEATHER: Sunny WORK INSPECTED: Initial building walk through. OBSERVATIONS: • We walked the building with the contractor and used spray paint to indicate the areas for repair according to the permitted documents. • A crew will mobilize on site tomorrow to start the repairs. RECOMMENDATIONS: • All areas of repair shall be verified by the Engineer of Record prior to new concrete placement. ______________________________ _________________________________ Michael Lue, P.E. Todd Rhoten