HomeMy WebLinkAboutLove's No. 467 - Speedco Addition.Structural Steel Report - Stamped By E.O.R.STRUCTURAL STEEL OBSERVATIONS REPORT
Report Number:HB201040.0026
Service Date:04/08/21 645 NW Enterprise Dr Ste 107
Report Date:04/11/21 Port St Lucie, FL 34986-2261
Task:Special Inspections (772) 343-9787 Reg No: 6870
Client Project
Love's Travel Stops & Country Stores Inc Love's Travel Stop No. 467 - Speedco Addition
Attn: Owen Searcy 200 S Kings Hwy
10601 N Pennsylvania Ave Fort Pierce, FL 34945
Oklahoma City, OK 73120-4108
Project Number: HB201040
Services:
Terracon Rep.: Louis Perini, BN 3688
Reported To:Client
Contractor:JC Curtis
Report Distribution:
(1) Love's Travel Stops & Country Stores
Inc, owen.searcy@loves.com
(1) Harrison French & Associates, Ltd,
HFA-Terracon@hfa-ae.com(1) JC Curtis Construction Co., LLC,
jmartin@jccurtisconstruction.com
(1) JC Curtis Construction Co., LLC,
mallison@jccurtisconstruction.com Reviewed By:____________________________________
(1) Love's Travel Stops & Country Stores
Inc, becca.wheeler@loves.com
(1) Love's Travel Stops & Country Stores
Inc,
construction_utilities_permits@loves.com
Michael, O'Connor, P.E.
(1) Love's Travel Stops & Country Stores
Inc, jaice.miller@loves.com
(1) Love's Travel Stops & Country Stores
Inc, tom.squires@loves.com Principal, FL Reg. No. 44082
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client
indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to
the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials.
CT0001, 10-16-13, Rev.10 Page 1 of 1
GENERAL INFORMATION
Mark Allison, JC Curtis Construction Company requested Terracon be on site for the following services: High-Strength Bolting Observation, Steel
Erection Observation. Structural steel is being constructed by VP Buildings, Varco Pruden. The results of observation(s) for today were reported to Mark
Allison, JC Curtis Construction Company. The Terracon representative arrived on site at 8000 and departed at 1200.
The construction documents referenced for this observation include: Page one: title plan, page 4 Anchor Rod plan, page 5 Anchor Rods Detail plan, page
6 Primary & Roof bracing plan, page 7 Framing cross section plan, page 9 Primary braving plan. Permit No. 2008-0354
HIGH-STRENGTH BOLTING OBSERVATION
Installation Observation
Connection
Type
Elevation/
Location
Method of
Tensioning
Referenced
Documents
Bolt
Grade
Faying
Surfaces Compliance Status*
Bearing (1) Level one Finish floor
elevation, level two roof
to roof elevation, A line to
B line, from #1 line to #5
line
Snug-Tight VP Buildings by
Varco Pruden, Page
one structural bolt
tightening notes.
A325 A - Painted Complies
* See below for details
Bolt Storage: Sealed Container (Complies) Mill Certification: Not Required
STRUCTURAL-STEEL-FIELD-OBSERVATION____________________________
The following steel was erected on site and was fabricated by VP Buildings by Varco Pruden (Approved Fabricator). Shop Fabrication observation was
not performed.
Material
Grade Member Type
Elevation/
Location
Referenced
Documents Comments Compliance Status*
* See below for details
ADDITIONAL COMMENTS
New metal building addition to existing metal building, A line to B line, from #1 line to #5 line
COMPLIANCE STATEMENT
Based on our observations, structural steel construction activities at the above-referenced locations appeared to be completed in general accordance with
the project plans and specifications.