Loading...
HomeMy WebLinkAboutLove's No. 467 - Speedco Addition.Structural Steel Report - Stamped By E.O.R.STRUCTURAL STEEL OBSERVATIONS REPORT Report Number:HB201040.0026 Service Date:04/08/21 645 NW Enterprise Dr Ste 107 Report Date:04/11/21 Port St Lucie, FL 34986-2261 Task:Special Inspections (772) 343-9787 Reg No: 6870 Client Project Love's Travel Stops & Country Stores Inc Love's Travel Stop No. 467 - Speedco Addition Attn: Owen Searcy 200 S Kings Hwy 10601 N Pennsylvania Ave Fort Pierce, FL 34945 Oklahoma City, OK 73120-4108 Project Number: HB201040 Services: Terracon Rep.: Louis Perini, BN 3688 Reported To:Client Contractor:JC Curtis Report Distribution: (1) Love's Travel Stops & Country Stores Inc, owen.searcy@loves.com (1) Harrison French & Associates, Ltd, HFA-Terracon@hfa-ae.com(1) JC Curtis Construction Co., LLC, jmartin@jccurtisconstruction.com (1) JC Curtis Construction Co., LLC, mallison@jccurtisconstruction.com Reviewed By:____________________________________ (1) Love's Travel Stops & Country Stores Inc, becca.wheeler@loves.com (1) Love's Travel Stops & Country Stores Inc, construction_utilities_permits@loves.com Michael, O'Connor, P.E. (1) Love's Travel Stops & Country Stores Inc, jaice.miller@loves.com (1) Love's Travel Stops & Country Stores Inc, tom.squires@loves.com Principal, FL Reg. No. 44082 The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not necessarily indicative of the properties of other apparently similar or identical materials. CT0001, 10-16-13, Rev.10 Page 1 of 1 GENERAL INFORMATION Mark Allison, JC Curtis Construction Company requested Terracon be on site for the following services: High-Strength Bolting Observation, Steel Erection Observation. Structural steel is being constructed by VP Buildings, Varco Pruden. The results of observation(s) for today were reported to Mark Allison, JC Curtis Construction Company. The Terracon representative arrived on site at 8000 and departed at 1200. The construction documents referenced for this observation include: Page one: title plan, page 4 Anchor Rod plan, page 5 Anchor Rods Detail plan, page 6 Primary & Roof bracing plan, page 7 Framing cross section plan, page 9 Primary braving plan. Permit No. 2008-0354 HIGH-STRENGTH BOLTING OBSERVATION Installation Observation Connection Type Elevation/ Location Method of Tensioning Referenced Documents Bolt Grade Faying Surfaces Compliance Status* Bearing (1) Level one Finish floor elevation, level two roof to roof elevation, A line to B line, from #1 line to #5 line Snug-Tight VP Buildings by Varco Pruden, Page one structural bolt tightening notes. A325 A - Painted Complies * See below for details Bolt Storage: Sealed Container (Complies) Mill Certification: Not Required STRUCTURAL-STEEL-FIELD-OBSERVATION____________________________ The following steel was erected on site and was fabricated by VP Buildings by Varco Pruden (Approved Fabricator). Shop Fabrication observation was not performed. Material Grade Member Type Elevation/ Location Referenced Documents Comments Compliance Status* * See below for details ADDITIONAL COMMENTS New metal building addition to existing metal building, A line to B line, from #1 line to #5 line COMPLIANCE STATEMENT Based on our observations, structural steel construction activities at the above-referenced locations appeared to be completed in general accordance with the project plans and specifications.