Loading...
HomeMy WebLinkAboutcompaction test (2)Headquarters Tl C 1 t ENGINEERING Mailing U.S- Highway 1 PO Sebastian, FL. 32958 Sebastian, FL. 32978 .32978 17i�/i AND TESTING Orlando Phone:772-589-0712 723 Progress Way SOIL COMPACTION REPORT C.A.# 5693 Sanford, FL. 32771 ASTM D 1557 and ASTM D 6938 KSMengineering.net DATE TESTED: March 11, 2020 KSM JOB #: 201202-1d/MH/jo PERMIT#: 20010635 NUC# 630 CONTRACTOR: Wynne Builders Nuc Model: MC-10R-P JOB LOCATION: 9 Tosca Nuc Serial #: 30630 Country Club Village Fort Pierce, Florida ITEM TESTED: Compacted Foundation Fill TEST LOCATION PEN DRY MAX. DRY PERCENT DEPTH OF SAMPLE READ DENSITY PROCTOR VALUE (P.C.F) COMPACTION 1. S.E. 0" - 12" 50 _ 105.9 110.9 95.5% 2. S.W. 106.3 95.9% 3. Center 107.5 96.9% 4. N.E. 108.1 97.5% 5. N.W. 107.1 96.6% Soil Description: 112.0 Brown Sand with traces of E I I I I I Shell Fragments I In Place Moisture: C 111.0 a— --- I- I I I — - - • — I 3.1% H I T I I I I I Proctor Optimum Moisture: 1100 I_,.— ,—„—I„—.. I,.—.. I „—, .. 12.0% P I Proctor Max. Dry Density: P.C.F. C I I I I I I 110.9 109.0 �..—.l ..—.I.—..—G.—..�.. ..�..—... F I I I I @ Test Locations the Density & I I I I I Penetrometer readings indicate the 108-0 Degree of Compaction Meets D I Minimum Required R I I I I I I I I I I for Staked Foundation 107.0 9 10 11 12 13 14 15 Respectfully Submitted: Moisture - % of Dry Weight ••``��\E E' K���''•, Disclaimer: Contractor is responsible to maintain �•� )J;'�10ENS..iC,p the tested area in the condition that KSM completed the indicated passed compaction test. 66 KSM is not responsible if the tested area has been altered from the approved inspected condition. Q_ P est� ��� .•` PE # 6&60". 3/12/2020 Email to: St Lucie Building Department Proudly Serving Florida since 1990