Loading...
HomeMy WebLinkAboutEngineering Pederal Phone: 954-784-2941 E-Fax: 954-784-7877875 engineering admin@fed-eng.com •, www.fed-eng.com goesting, Inc. Dated: November 28,2018 Job Order# R18941 ACR1.Com Commercial Roofing RECEIVED 1924 N. Elm Street Muncie,IN 47303 Attn: Elaine Newnum DEC - 3 2018 RE: Field Withdrawal Resistance Test Permitting Department Grose's Interstate Moving St. Lucie Count FL 1270 Grose Road y� Ft. Pierce,FL 34982 Dear: Sirs: Pursuant to your request, Federal Engineering & Testing, Inc. (FE&T) has performed a field withdrawal resistance test in compliance with Testing Application Standard TAS-105 and the Florida Building Code High Velocity Hurricane Zone at the above referenced site. The purpose of our test was to determine the uplift capacity of the mechanical fasteners at the above referenced project. FE&T is a Miami Dade Certified Testing Laboratory (Certification#16-0203.07). On 11/28/2018 our field representative visited the referenced site and conducted ten (10) field withdrawal resistance tests on the HDP #14 screw fasteners into the metal roof deck. All tests were found in compliance with the Florida Building Code and TAS-105. See attached copies of TAS-105 forms with test results. The test results presented reflect the condition of the roof system at the time of the test. These results are time and sample dependent since roof conditions are continuously changing due to exposure to the elements. All tests were conducted according to the Florida Building Code Test Protocol TAS-105 using a calibrated Comten Industries Fastener Tester Model No.DFG 2W2000 (see attached calibration). FE&T is an independent third party providing un-biased testing information and results. FE&T is not affiliated ated with our client nor do we have any financial interest in the project or determination of the test results. Federal Engineering& Testing, Inc., appreciates the opportunity to be of service to you at this phase of your project. If you have any questions or comments, please give us a call. It has been a pleasure working with you and look forward to doing so in the near future. Sincerely, Keith LeBlanc, P.E. �� Z d/i�` Attachments include the following: 0 1Testing,F_dera �n ir,,;erin and Inc. Field Withdrawal Resistance Test Results g S Florida Reg.Number 59394 Field Sketch Certificate of Authorization#5471 Comten Calibration Miami-Lade County Certification# 16-0203.07 ederaI . ngineering Florida Building Code Test Protocol TAS-105 ®Oesting, Inc. Building Code Compliance Office Testing Application Standard TAS 105-11 Field Withdrawal Resistance Test Results General Information: Job Name: Grose's Interstate Moving Job Address: 1270 Grose Road Ft.Pierce,FL 34982 Contact Individual at jobsite(if any) Elaine Newnum Testing Agency/Equipment Information: Note: The undersigned acknowledges that all testing has been conducted and results have been reported in compliance with Florida Building Code Test Protocol TAS-105 Testing Agency Name: Federal Engineering&Testing Inc. Company Address: 250 SW 13th Ave Pompano Beach,FL 33069 Company Telephone: (954)784-2941 Company Fax: (954) 784-7875 Representative Name: Mr.Keith LeBlanc P.E. Representative Title: Professional Engineer Signature: �J Testing Apparatus: Comten Industries Fastener Tester Modef DFG2 W2000 i • Q ederal Q ngineering Building/Roof System Information: Area Number: 1 & Q esting, Inc. Roof Area Height 21 ft. Roof Area Length 59 ft. Second Largest Dimension 50 ft. Total Roof Area 2950 ft2 30 sq. Perimeter Area 945 ft2 (See RAS 117) Building/Roof System Information: Area Number: Roof Area Height ft. Roof Area Length ft. Second Largest Dimension ft. Total Roof Area ft2 sq. Perimeter Area ft2 (See RAS 117) Building/Roof System Information: Area Number: Roof Area Height ft. Roof Area Length ft. Second Largest Dimension ft. Total Roof Area ft2 sq. Perimeter Area ft2 (See RAS 117) • • oQ ederal OQ ngineering ®OQ esting, Inc. Field Withdrawal Resistance Recording Sheet Component to be secured: Area Number 1 ❑ Insulation (Refer to deck dimensions on Page No.2) ❑ Membrane Fastener Type: #14 ❑ Anchor or Basesheet Fastener Manufacturer: HDP ❑ Woodblocking Predrilled: Yes ❑ No 21 ❑ Metal Profiles If Yes,Drill Bit Size: N/A "diameter 0 Resistance Verification Only Hole Depth: N/A See Section 8 to determine number of tests(if drill is high tolerance include range in 1/1000"tolerance) Sample& Plan Initial Failure Sample& Plan Initial Failure Identifier Load (Ibf) Roof Area Identifier Load (lbf) Roof Area 1 310 C 26 2 263 C 27 3 305 C 28 4 283 C 29 5 311 P 30 6 297 P 31 7 283 P 32 8 296 P 33 9 228 F 34 10 295 F 35 11 36 12 37 13 38 14 39 15 40 16 41 17 42 18 43 19 44 20 45 21 46 22 47 23 48 24 49 25 50 Fastener Installation Information: Is the fastener a self driller? Yes ❑ No If yes, list the type of tool used for fastener installation: Cordless Drill Speed of tool: Variable rpm's Number of tests conducted: n= 10 * See Section 8 of Test Protocol TAS 105 * Note the locations of all tests on'Building Information"Detail#1,attached) • • Oederal Q ngineering & OQ esting, Inc. Mean Failure Load F= 287.10 lbf Sample Standard Deviation Sf= 25.30 lbf Minimum Characteristic Resistance Force F'= 275.73 lbf Notes: 1)Use of the results herein to determine the required number of fasteners for insulation attachment or an acceptable anchor or base sheet fastener spacing,as outlined in RAS 117,shall utilize the minimum characteristic resistance force(F'),determined in compliance with Section 9 of TAS 105.No margin of safety shall be applied to field withdrawal resistance test results determined in compliance with TAS 105. 2) A safety factor of 2 to 1 shall be applied to all results of laboratory testing. 3) The following pages shall be completed for each roof area and included with all Field Withdrawal Resistance Test Recording Sheets. Roof Area 1 (If no parapet wall exists insert"N/A") N/A 21 Feet Ground Level Building Information- Detail# 1