Loading...
HomeMy WebLinkAboutCertificate of Termite TreatmentSt. Lucie County I_'_::�)ections 2300 Virginia Avenue Ft. Pierce, FL 34982.°�C (772) 462-2172 CERTIFICATE OF TERMITE CONSTRUCTION SOIL TREATMENT PERMIT # 2' 105'0 q � 2"� JOB ADDRESS ]9I6 P BUILDER I CCO 6_)� PEST CONTROL CONTRACTOR HANNAN PEST MANAGEMENT PEST CONTROL LICENSE# JB99418 NOTE JUL d 8 04 INX ' Works We, the undersigned, hereby certify that we have pretreated the above -described construction for subterranean termites in accordance with the standards of the National Pest Control Association. Square feet of area treated: 14 Cc�, o Chemicals used: fn4s`0-�1 Percentage of solution: oL� ��� Total gallons used: Date of treatment: Time of treatment: ❑ Footing ❑ 1 st Treatment ❑ Re -treat �J Slab 1 st Treatment ❑ Re -treat ❑ Driveway ❑ 1 st Treatment ❑ Re -treat ❑ Pools ❑ 1 st Treatment ❑ Re -treat ❑ Other ❑ 1 st Treatment ❑ Re -treat '56 1- ) co FBC104.2.6 Certificate of Protective Treatment for prevention of termites. A weather resistant jobsite posting board shall be provided to receive duplicate Treatment Certificates as each required protective treatment is completed, providing a copy for the person the permit is issued to and another copy for the building permit files. The Treatment Certificate shall provide the product used, identity of the applicator, time and date of the treatment, site location, area treated, chemical used, percent concentration and number of gallons used, to establish a verifiable record of protective treatment. If the soil chemical barrier method for termite protection is used, final exterior treatment shall be completed prior to final building approval. St. Lucie County requires for the final inspection for CO, a Permanent Sticker to be placed on the electrical panel box cover, listing all the treatments and dates of applications. ❑ Perimeter for Final Inspection Signature of exterminator There must be a completed form for each required treatment or re -treatment and this form must be on the job site to be picked up by the inspector at time of each inspection or the scheduled inspection will fail and a re -inspection fee charged.