Loading...
HomeMy WebLinkAboutAPPROVED Scope of Work, 810 Bradley St, Fort Pierce1 Scope of Work OVERVIEW: Renovation and repair of the house at 810 Bradley St, Fort Pierce, FL, 34982, legal description: INDIAN RIVER ESTATES – UNIT 05 – BLK 26 W 100 FT OF LOTS 64 & 65. All improvements and renovations will be per the Florida Building Code Residential Existing Buildings 7th Edition 2020. Proposed Exterior renovations: • Demolition of Shed and Screen Porch located on the North side of the house. • Vinyl siding will be removed, repair rotten wood as needed, install new house wrap and Hardie board siding. • Complete replacement of the roof to 26-gauge 5v metal roof with peel and stick underlayment. A separate permit was acquired. Permit number: SLC 2014-0181. • Replace existing windows and doors. • Frame 3 new opening for 2 windows in Master Bedroom and glass slider in Family room. • Front Entry screen wall to be removed, keep existing front entry door and sidelights with direct mount shutters. Proposed Interior renovations: • Redo bath tile and fixtures • Relocation of a new Master Bedroom door. • Adjust egress switch locations and replace existing light fixtures. • Correct GFI issues and missing fan boxes not originally installed in home. • Electrical load to remain the same for the panel/service. • New ceramic tile flooring will be installed throughout the house. Interior Room by Room: Garage & Laundry: • Reinstall new washer & dryer in house where existing power and water still existing in Laundry. Cap off electric in Garage. • Access door/ladder to attic needs to be replaced. • Garage door to be replaced. Master Bedroom: • Add 40” by 80” bedroom barn door. • Fill in old door to Laundry. • Replace Master Bath door with a pocket door measuring 32” x 80”. Master Bathroom: • New wet & dry porcelain tile floor to be installed. 2 • Ceramic subway tile to be installed on shower walls. • New vanity to be installed. • Reduce wall between vanity and toilet to partial height wall. • New toilet, and bathroom trims added, keeping existing valves and shutoffs in place. Office: • Replace existing A/C unit with new system of the same tonnage. • Old A/C system: model # - N/A, tonnage – 1.5 tons • New A/C system: model # - Condenser: CA14NB018, Air Handler: FB4CNP018 tonnage – 1.5 ton Carrier • Existing A/C area – 2,129 SF, Existing non-A/C area – 3,402SF • Proposed A/C area – 2,129 SF, Proposed non-A/C area – 2,674 SF Shared Bathroom: • New ceramic tile being placed on dry floor only. • New vanity to be installed. • New toilet, and bathroom trims added, keeping existing valves and shutoffs in place. Kitchen & Dining: • Replace kitchen appliances, locations not changed. • Refinish cabinets doors and drawer fronts.