HomeMy WebLinkAbout5380-Revision Narrative_v2020.00 - v2020.1Disc Description Dwgs A Add customization level in the title, below the Prototype line CS A Add to note "Filler Panel to match adjacent panel surface" A1 A Wall behind Freestyle to be changed to be 6". A1, EQ1 A Wall behind follett to be 16 GA studs.A1 A Eliminate Building Centerlines on Architectural Drawings. A1, EQ1, CHECK PLANS A Door Schedule - Add Roof Access Panel.A1 A Create an A1.1 sheet for a Dimension Plan.A1.1 A Hard ceiling over Reach-Ins to match fl in height - 8' - 0" A2 A Detail 8/A3 - Replace Metal Cap and note with walk pad. A3.1 A Roof Plan - Make 1/4" Scale.A3 A Window section details - Added General Note clearly stating/showing insulation type and r-value for built up headers. A7 A Checkout Flooring Detail - Change "Refer to Specifications" to "Refer to Schedule" A11 A Vestibule Mat - Rear - Coordinate with remodels to show graphics for 3' - 0" mats A11 A Equipment & Counters Elevations - Added 3' Min Dim string @ pick up counter elevation. AC1 A Equipment Schedule - Removed "Sizzli" from labels. Replace with "Convection Oven" EQ1 A Update prototype version to 2020.01 CS A Update sheet numbering format.CS A Removed note 4 under separate permits CS A In Managers Office- Change wall sheathing on the left side of the door to be 1/2" plywood sheathing in place of 1/2" GWB.A1 A In Managers Office - FRP wall finish to extend to ceiling A1 A In Associates area - FRP wall finish to extend to ceiling A1 5380 F85FB Revision Narrative - v2020.0 To v2020.1 A Beer Cave - Add hold dimension between two framed walls A1.1 A Beer Cave - Add clear to 2" dimensions to space surrounding WIB A1.1 A,P Change Hi-Lo Water Fountain to Hi-Lo Drinking Fountain A1 A Delivery Vestibule - Remove note: Provide 5/8" plywood floor to ceiling on this wall. finish to be FRP A1 A Delivery Vestibule - WIB Finish to be black in vestibule and SS in areas visible from Retail Area A1, A8 A Delivery Vestibule - Correct door jamb detail for wall juncture at WIB A1 A Water Service Room - Show access panel location for temporary water hookup.A1 A Water Service Room - Relocate CO2 Fill Box to above temporary water hookup location. A1 A Water Service Room - Relocate CO2 Fill Box to above temporary water hookup location. A1 A Water Service Room - coordinate water Softening System w/ Plumbing drawings A1 A Water Service Room - coordinate and redraw detail 13/A9. A1,A9 A Retail WIB - Add Hold Dimension between framed walls A1.1 A,M,E,P Women's Restroom - Modify accessible stall and relocate framed walls. A1,A8 A Women's Restroom - only show overall dimensions and add additional dimensions to plan detail A1.1,A8 A Men's Restroom - Change south wall adjacent to backroom to 6" metal studs. A1, A8 A Men's Restroom - Change east wall adjacent to backroom to 3 5/8"" metal studs.A1, A8 A Ice Merchandiser Alcove - Add hold dimension A1 A Food Service - Door W6 Double acting door need correct jamb and frame detail. A1, A9 A Food Service - Add 12x18 AP for access to hub drain at Reach in freezer. A1, A8 A Staging - Add hold dimension at the mop sink. A1.1 A Staging - Revise Water heater note to include Pre-Cast Concrete Pad. A1 A Staging - Add detail of Threshold at door T6 to include threshold to the edge of slab.A1, A7 A Wash Room - Show bulkhead at Food Service WIB and create section. A1 A Wash Room - Door W1 to get detail similar to door W6 in Food Service A1, A9 A Food Service WIB - Add hold dimensions between framed walls. A1.1 A Food Service - Add Blocking for Cat Lock A1 A Vestibule (front) -Remove Ultra Entry Mat note. A1 A General - all Dimensions are to stud and not Sheathing A1.1 A General - Call out height of Durock around WIB's A1 A General Notes- Add note: Refer to civil drawings for location landscape area adjacent to building. A1 A Equipment Blocking Notes - add height of blocking for air curtain A1 A Equipment Blocking Notes -add blocking for Catlock A General - Remove all room numbers from room name tags A1,A2 A Door Schedule - Door T2 add detail 27/A7 to comment section A1 A Beer Cave - Ceiling height to be 10'-0"A2 A Delivery Vestibule - Call out air curtain, see mech. dwg's A2 A Delivery vestibule - show soda chase and call out detail A2 A Retail WIB - Add access panel in ceiling of retail WIB. Coordinate w/ mech. and elec.A2 A Retail WIB - Add 30x30 framed opening in wall adjacent to Womens Restroom above WIB A2 A Rear Vestibule - remove transfer grill, coordinate w/ mechanical A2 A Men's Restroom - remove note: mr gwb on 8" 16ga metal studs at 24" o.c. typ at men's and women's restrooms and rear vestibule A2 A Electrical Room - Change ceiling type from ACT1 to ACT2 A2 A Washroom - Change ceiling height from 10'- 6" to 10'-0" A2 A Washroom - show bulkhead at opening to Food Service WIB. A2 A Washroom - Add section callout for bulkhead at entry to Food Service WIB. A2 A Backroom - Change ceiling height from 10'- 6" to 10'-0" A2 A Food Service - Change ceiling height from 10'-6" to 10'-0" A2 A Ice Merchandiser Alcove - Change ceiling type from ACT1 to ACT2 A2 A Express Case Alcove - Change ceiling type from ACT1 to ACT2 A2 A Express Case Alcove -Add (2)24x24 egg crate diffusers. coordinate w/ Mech A2 A General - Revise soffit layout per revised design A2 A Exterior Canopy - Call out soffit material A2 A Detail 2/A2 - Call out soffit material.A2 A Detail 6/A2 - Update detail to show blocking for signage. Delete similar detail on sheet A9 A2, A9 A Detail 9/A2 - Change plywood and finish to Azek A2 A Detail 10/A2 - Add 3/4" quarter round painted P1 to underside of bulkhead adjacent to WIB. Note to include information about not mechanically fastening to the WIB. A2 A General Note 2 - Add paint color to match underside of bulkhead. note to include information about not mechanically fastening to WIB A2 A Lotto Satellite Dish - Remove walk pad note. A3 A Add WIFI devices to the front corners of the building. A3 A Detail 9/A3 - Add note to refer to NOA for fastening. A3.1 A Detail 6/A3 - Remove Metal cap and change to walk pad. A3.1 A Compressor Platform - update information callouts. A3.1 A Detail 1/A3.1 - Modify fascia detail to match detail 13/A3.1 A3.2 A Detail 5/A3.1 - Modify fascia detail to match detail 13/A3.1 A3.2 A Detail 5/A3.1 - Rename detail to Fascia Detail A3.2 A Detail 12/A3.1 - Coordinate parapet cap detail callout A3.2 A Detail 16/A3.1 - Add Lath to detail A3.2 A Detail 16/A3.1 - Change detail scale from 1'- 0" to NTS. A3.2 A Detail 25/A3.1 - Add detail callout referencing 18/A3.1 A3.2 A Detail 13/A3.1 - Revise note to Correct size of continuous fascia blocking. A3.2 A Detail 26/A3.1 - Add material callout of Escutcheon Ring. A3.2 A Detail 26/A3.1 - change downspout note to remove S.S. A3.2 A Detail 28/A3.1 - Add material callout of Escutcheon Ring. A3.2 A Detail 28/A3.1 - change downspout note to remove S.S. A3.2 A General - Coordinate material callout for exterior trim. A3.2 A Front Elevation - Change spandrel glazing to tinted tempered glazing. A4 A Front Elevation - Add dimension to light fixture height. A4 A Front Elevation - Add detail callout to light gauge truss note. A4 A Front Elevation - Add film to windows in coffee are to conceal equipment. A4 A Right Elevation - remove horizontal mullion at walk-up window location. A4 A Right Elevation - Add arrow to callout for the scupper box A4 A Exterior Finish Schedule - DS, DS1, DS2 delete gauge from schedule and update Specifications book to include. A4, Spec. Book A Exterior Finish Schedule - CO2 coordinate detail callout in notes section. A4 A Exterior Finish Schedule - LADD refence details in notes sections. A4 A Exterior Finish Schedule - MTPN,MNTP2 change manufacturer to match PBS Bahama Shutter.A4 A Exterior Finish Schedule - TH remove from schedule A4 A Detail 5/A4 - Add (MTPN) to title A4 A Detail 6/A4 - Add (MTPN2) to title A4 A General Notes - Remove note 3 A4 A General - Tag emergency lights.A4.1 A Rear Elevation - Move rear tower downspout to the exterior of the tower to avoid the pier and footing. A4.1 A Rear Elevation - Add Dimension for Tower Lights. A4.1 A Rear Elevation - At rear tower clarify arrow location of STU2 tag. A4.1 A Rear Elevation - Relocate CO2 Fill port to Left Side Elevation above 6x6 access panel for thru wall pipe. A4.1 A Rear Elevation - Change note Paint Louver EP6 to match stucco to Louver, Re Mech. Drawings. A4.1 A Left Side Elevation - Add duplex outlet for Ice Merchandiser. A4.1 A, E Left Side Elevation - relocate Special Purpose out closer to wall hydrant. Align height of outlet and hydrant. A4.1 A 1/A5 - Correct haunched exterior footing to show removed cast stone base. A5 A 2/A5 - Correct WIB wall Height A5 A 1/A6 - Correct Height of light fixture in Tower. A6 A 1/A6.1 - Remove wall finish hatch.A6.1 A 3/A6.1 - Show HSS tube steel in knee wall.A6.1 A 4/A6.1 - coordinate height of Durock at WIB A6.1 A 4/A6.1 - Remove WIB filler panel at ceiling height A6.1 A 4/A6.1 - correct footing due to removal of stone base A6.1 A 5/A6.1 - correct exterior wall flashing to mat old detail. A6.1 A 11/A6.1 -correct wall flashing at column.A6.1 A 1/A6.2 - Terrazzo to stop at face of wall.A6.2 A 1/A6.2 - Show HSS tube steel in knee wall.A6.2 A 3/A6.2 - Coordinate note: Accent trim beyond per finish schedule re:sheet A4 A6.2 A 3/A6.2 - Coordinate size of 2x6 Hardie Trim above storefront at tower. A6.2 A 8/A6.2 - Update detail to show correct stucco layers. A6.2 A Detail 3/A7 , 6/A7and 12/A7 are all similar and do not require multiple versions.A7 A Detail 9/A7 - Remove detail A7 A Detail 13/A7 - Call out trim (including size).A7 A Detail 18/A7 - removed dashed line of light fixture A7 A Detail 18/A7 - change callout for 1 1/2" trim board to trim board, size varies. A7 A Detail 18/A7 - Change detail title from Exterior Light Mounting detail to Exterior Device Mounting Detail. A7 A 1/A8 - Remove Glazing Type from Elevation A8 A 2/A8 - Show Blocking for Water Fountain A8 A 3/A8 - Change Kick-Plate size A8 A 4A/A8 - Coordinate WIB door swings A8 A 4A/A8 - Show trim kits and opening for Freestyle in self-Serv. Beverage A8 A 4A/A8 - Show blocking for Follett shelf A8 A 5/A8 - Show Access Panel A8 A 7/A8 - Coordinate WIB door swings.A8 A 8/A8 - Revise note: Soap and Paper Towel dispenser to be finished black to Soap and Paper Towel Dispenser A8 A 9/A8 - Remove Glazing Type from Elevation A8 A Interior Finish Schedule - EF-1 Supplied By changed to Wawa A8 A Interior Finish Schedule -FRPC Remarks, Remove sheet size. A8 A Interior Finish Schedule - GWB, Remove from schedule A8 A Interior Finish Schedule - IMG1 - Change Impact Specialties to Construction Specialties as per bulletin. A8 A Interior Finish Schedule - M2Change color from jailhouse rock to match bulletin #466 A8 A Interior Finish Schedule - Add ISL2 for black finish A8 A 1/A8.1 - Note I: Reference sheet AC1 for accessibility requirements. A8.1 A 10/A8.1 - Coordinate Fire Extinguisher location at conflict w/ shelving A8.1 A 13/A8.1 - Remove selected metro racks A8.1 A 13/A8.1 - Show missing FRPC wall hatch A8.1 A 18/A8.1 - coordinate kick-plate height A8.1 A 20/A8.1 - Remove Lover from door and add kick-plate A8.1 A 21/A8.1 - Add finish tag for ISL2 A8.1 A 21/A8.1 - remove white finish note from walk-in refrigerator. A8.1 A 22/A8.1 - coordinate kick-plate height A8.1 A 23/A8.1 - Add soda Chase A8.1 A 23/A8.1 - Add Dimension to top of surge tank shelf. A8.1 A 24/A8.1 - coordinate kick-plate height A8.1 A 24/A8.1 - Add soda Chase A8.1 A 31/A8.1 - Update detail to remove tile above Corian A8.1 A 3/A8.2 - Tag and hatch break metal finish at storefront. A8.2 A 14/A8.2 - FRP Finish to 10'-0"A8.2 A 15/A8.2 - FRP Finish to 10'-0"A8.2 A 15/A8.2 - 1/2" plywood sheathing in place of 1/2" GWB sheathing full height to left of door. A8.2 A 16/A8.2 - FRP Finish to 10'-0"A8.2 A 17/A8.2 - FRP Finish to 10'-0"A8.2 A 8/A9 - remove height and add note to see elevations for height. A9 A 9/A9 - Revise as per finish revisions.A9 A 12/A9 - Move soap dispenser over sink A9 A 13/A9 - Review Graphics and intent of detail. A9 A 17/A9 - Add detail for double acting door frame and jamb. A9 A 18/A9 - Remove tile behind endcap at face of wall. A9 A 18/A9 - Revise endcap note to include floor to ceiling. A9 A 30/A9 - confirm value of detail as information is shown in alternate locations.A9 A 3/A9.1 - Remove detail as information is shown on A2 A9.1 A 4/A9.1 - Revise detail to larger scale and to include an elevation. A9.1 A 29/A9.1 - Add Rear Vestibule plan detail.A9.1 A Revise Plan to show knee wall at front elevation A11 A Confirm dimension coordination w/ Civil.A11 A 18/AC1 - Add Note: If Signe does not fit in this location, place on door. AC1 A Office - remove text from Veeder Root EQ1 A Exterior (Left Side) - Ice Merchandizer to be tagged Z12 EQ1 A Exterior (Left Side) -Remove detail callout from ladder EQ1 A Water Service Room - CO2 Tank to be tagged Z10 EQ1 A Water Service Room - CO2 Fill location to be updated as per A1 EQ1 A Exterior (Rear) - Callout Trash / Recycle Receptacle. EQ1 A Women's Restroom - Update layout EQ1 A Rear Vestibule - Add door thresholds.EQ1 A Men's Restroom - Update layout EQ1 A Wash Room - Call out Metro shelves above 3-comp sink. EQ1 A Wash Room - Change dimensions to 1/8" tolerance. EQ1 A Wash Room - Tag Metro Shelves and Bakery Rack. EQ1 A Self-Serv. Beverage - Add Access Panel in Cup Cabinet. EQ1 A Self-Serv. Beverage -Tag Ice Merchandiser C5.3 EQ1 A Self-Serv. Beverage - Remove splash guard from hand sink EQ1 A Food Service -Add Speed rack EQ1 A Food Service - Add Deli phone next to catlock. EQ1 A Food Service - Remove note: Crunchy Salad Toppings EQ1 A Food Service - Relocate KPS monitor note for clarity. EQ1 A Full-Serv Beverage - Add KPS at backline.EQ1 A Exterior (Right Side) - Add tags for exterior seating. EQ1 A Exterior (Right Side) -Dimension exterior seating off of finished wall. EQ1 A Exterior (Right Side) - Add clear dimension at exterior seating. EQ1 A Vestibule - Remove Floor note.EQ1 A Vestibule - Show door thresholds.EQ1 A General - Remove Floor finishes from plan.EQ1 A General - Update room tags to remove room numbers. EQ1 A General - update per the latest Merchandise plan EQ1 A Equipment Schedule - B26.3 add information. EQ1 A Equipment Schedule - CO2 tank add tag Z10 EQ1 A Equipment Schedule - Outdoor Ice Merchandiser add tag Z12 and installed by vendor. EQ1 A General - Revise Equipment tag Size to smaller. EQ1 A Island Express Case - remove EQ2 A Wall Express Case - Add EQ2 A CAT -Show outlets as quads and not duplex size EQ2 A CAT -Add data outlets.EQ2 A CAT -Correct EQ number EQ2 A Hot Food Table - Fix title on elevation to Hot Food Table. EQ2 A Hot Food Table - Show Hot Holding on elevation. EQ2 A Coffee Brewer - Remove Prentices from plumbing information EQ2 A Super Cappuccino - Update electrical information. EQ2 A Super Cappuccino - remove prentices from plumbing information. EQ2 A Refrigerated Food Prep - Correct elevation title EQ2 A ELO Time Clock - Relocate outlets below.EQ2 A Cat Lock - Relocate outlets below.EQ2 A Cat Lock - Remove Future from plan title.EQ2 A Milkshake Blender - Remove extra lines.EQ2 A Iced Coffee Brewer - Add Plan and Elevation. EQ2 A General - Fix Liveweights of dimensions.EQ2 S General - Show slab control joints.S2 S General - Add Dimension between Beer Cave and Retail WIB. S2 S General - Add Dimension between edge of slab and Food Service WIB. S2 S 1/S7.1 - Add note to coordinate color w/ Architecture. S7.1 S 13/S7.1 - Update connection detail.S7.1 M 1/M1 - Implement Bulletin #463 - VAV Diffuser replacement in Associates and Office with non-VAV and adjust airflows. M1 M 1/M1 -Change routing of transfer air duct between Water Service Room and Retail area to thru-wall transfer from Water Service Room to above ceiling area above Retail WIB. M1 M 1/M1 - Add (2)24x24 egg crate diffusers in ceiling of express case alcove. M1 M 1/M1 - Relocate return grilles for RTU-3 to open area and parallel to existing Food Service soffit. M1 M 1/M1 - Relocate RTU-3 Thermostat to location near the front vestibule. M1 M 1/M1 - Relocate upper 365 CFM linear diffusers in coffee to RTU-3 and redistribute air.M1 M Key Notes - Add note for direction of airflow of linear diffusers. M1 M 10/M3 - Add alignment note and dimension to detail. M3 M 11/M3 - Coordinate cap w/ Arch M3 M RTU Sequence of Operation - Update per Bulletin #464 M3 M RTU Test And Balance Notes - Update per Bulletin #464 M3 M Rooftop Unit Schedule Notes. - Update.M3 M HVAC Air Device Schedule - Remove Device CD-4 from Schedule. M3 P Relocate Roof Leader to the exterior of the rear tower. P1 P Women's Restroom - Relocate floor drain to near hand dryer. P1 P Men's Restroom - Relocate floor drain to near hand dryer. P1 P Men's Restroom - Relocate vent to wall behind lav. cabinet. P1 P Rear Vestibule - Relocate ECO to the right and out of the centerline of the door. P1 P Self-Serv. Beverage - Relocate Hub drain between freestyle units. P1 P Self-Serv. Beverage - Coordinate FCB hub drain w/ Cup holder access panel. P1 P Staging - Show housekeeping pad and relocate FD-1 P1 P Washroom - Relocate floor drain to other side of Food Service WIB.door. P1 P Women's Restroom - Add Loop.P2 P Water Meter Room - Coordinate thru wall Water hookup with Arch detail. P4 P Remove Evap Coil Condensate from Sanitary Riser. P4 P 12/P5 - Add note to locate next to wall.P5 P 13/P5 - Coordinate height of CSR mounting w/ Arch P5 P 13/P5 - Add Iced Coffee (B51)P5 P Piping Material Schedule - Cold Water, Change thickness to 1/2" P5 P Piping Material Schedule - Hot Water, add return and change thickness to 1/2" P5 P Piping Material Schedule - Remove note 2 P5 P Fixture Specifications - WCH-1, Change wall hydrant gas canopy to Trash compound. P5 E Office - Update Data near door to 60"E1 E Beer Cave - Remove outlet for condensate pump RPB-7 E1 E Beer Cave - Remove duplicate A2 tag, JB and keynote 30 E1 E Beer Cave - Change Door Heat symbol to C E1 E Beer Cave - Get new signage information E1 E Retail WIB. - Change door heat symbol to C E1 E Retail WIB. - Add additional door heat circuit. E1 E Retail WIB. - Add height (84") to RPB-7 E1 E Retail WIB - Remove keynote 31 E1 E Exterior (Left Side) - Coordinate location Special purpose outlet for Power Washer E1 E Exterior (Left Side) - Ice Merchandiser, add tag Z12 E1 E Exterior (Left Side) - Remove note intended for 2nd Ice Merchandiser E1 E Exterior (Left Side) -RPC-27 change to GFI breaker. and change to in-use cover. E1 E Food Service Freezer - Remove duplicate A4 tag, JB and keynote 31 E1 E Food Service Freezer - Change door heat symbol to C E1 E Food Service Refrigerator - Remove duplicate A3 tag, JB and keynote 31 E1 E Food Service Refrigerator - Change door heat symbol to C E1 E Food Service - Add Circuit to catlock outlet E1 E Food Service - Change data from 54" to 55" at catlock E1 E Lottery - use as template for tags and circuiting. E1 E 3/E1 - Tag Lights E1 E 3/E1 - remove EC shall provide from light fixture note. E1 E 3/E1 - Include Background E1 E Keynote 5 - Provide spec.E1 E Keynote 18 - Remove an isolated ground (ig) from note. E1 E For all protos, fl, identify all equipment that needs to be gfi protected, create a square d panel (move all food service equipment into this panel) - can't change all to square d due to cost - E1 E Keynote 31 - Remove note.E1 E Beer Cave - Remove Occupancy Sensor and keynote 6 E2 E Retail WIB - Add Two door light JB's (C)E2 E Rear Tower - Change DL2 to DL2E E2 E Men's Restroom - Occupancy Sensor is overwriting keynote. E2 E Ice Merchandiser Alcove - Confirm location of battery pack w/ voltage drop. E2 E Light fixture Schedule - RF, Add Trash Enclosure to location. E2 E Symbol Legend - "C" Symbol note to match E1. E2 E Add tags to light fixtures. On west Parapet wall. E3 E Add Keynote 6 to RTU's E3 E Remove Cap from Tower E3 E 2/E3 - Update detail for exterior of building E3 E Keynotes - Combine notes 2 and 6 E3 E Keynotes 6 - new note, GFI receptacle furnished w/ HVAC unit wired by E.C. E3 E Office - Move conduit for monumnet sign to electrical room E4 E Retail - Add 1" data and 1" power conduit capped 1" above the f.f. with pull strings E4 E Electrical Room - Remove note BAS Panel E4 E Electrical Room - Conduit See note 5 and 6 E4 E Full-Serv Beverage - Confirm if 1"C Data is required. E4 E Coffee - Relocate conduit in corner of angled storefront. E4 E Coffee Bar - Confirm if 1"C Data and 3/4"c power is required. E4 E General Note 6 - Revise to 10' GRC - PVC - 10' GRC, Coordinate with note on sheet E6 E4 E Electrical Plan Note 6 - Remove portion of note, The electrical contractor shall furnish and install a dedicated simplex outlet to price change controller.E4 E Electrical Plan Note 8 - Relocate, (1) 1" PVC to Each Air Machine to note 1 and modify description. E4 E Panel RPC - Change Circuit 20 to Air dispenser #2 E5 E Panel RPC - Change Circuit 36 to Air dispenser #1 E5 E Panel RPD - Remove LTG Track - Track Length Sign/Display Signage and Display Case. E5 E Panel LPA - Remove, Refer to one-line diagram E5 E Panel RPU - Remove LTG Track - Track Length Sign/Display Signage and Display Case. E5 E 4/E6 - Remove Diesel Fuel Note E6 E 4/E6 - Update Gas Canopy GRC Note.E6 E 4/E6 - Left side conduit notes, Align text.E6 E 4/E6 - Air Machine, Change to 1 conduit and change to Air Dispenser E6 E 4/E6 - Change 1" GRC spare run to PVC, see redlines E6 E 4/E6 - Air Machine, Change 2 conduits to checkout to 4 E6 E 4/E6 - Remove (1) 1" grc to simplex receptacle to price change controller in office area. E6 E 4/E6 - Revise Graphics for conduits to stop at the floor line. E6 E 4/E6 - Revise Graphics for conduits to stop at top of panels E6 E 4/E6 - Confirm if 3" extension below panels are needed and if they are included with the shop drawings. E6 E 5/E6 - Add, (1) 2" PVC to spares through, see note 2 and detail redlines E6 E 5/E6 - Add, (1) 1" PVC to Irrigation meter, see detail redlines. E6 E 5/E6 - change conduit note to tank compartments to include (10 or 12 as required).E6 E 5/E6 - Add Price changer and receptacle to elevation, see detail redlines. E6 E 5/E6 -Show conduit symbols for all conduits E6 E 5/E6 - change (2) 2" PVC, Data to food service to (3) 1", See detail Redlines E6 E 5/E6 - Add (2) 1" PVC data to each price sign monument / pylon, See detail Redlines E6 E 5/E6 - Add (1) 2" PVC to intercom trough, see note 2, See detail Redlines E6 E 5/E6 - Add entire length to GRC note to each submersible pump, See detail Redlines E6 E electrical Room elevation Notes - remove note 6 E6 E electrical Room elevation Notes - remove note 8 E6 E Single Line Diagram - Change TVSS to SPD E7 E Single Line Diagram - SPD tag to Equipment E7 E Single Line Diagram - Remove "PowerPlus" from Distribution title. E7 E Single Line Diagram - SPD tag to Equipment E7 E Change electrical contractor shall obtain integrated power to electrical E7