Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
215 River Walky eSEAL
HIP ROOF SCHEDULE Zone ROOF SYSTEM BUILDING PRESSURE PRODUCT PRESSURE Deck, Underlayment, & Attachment Manufacturer Model Florida Product Approval (PSF) (PSF) 1 SEE NOTE 2 OWENS CORNING DURATION SHINGLE FL10674.1 -54.4 VULT = 194MPH 2e, 2r, 3 SEE NOTE 2 OWENS CORNING DURATION SHINGLE FL10674.1 -75 VULT = 194MPH 2ea (TYP) a (TYP) 1 2r 3 3 2e 1 2r 3 3 12e 1 2e a (TYP) a (TYP) 3e 2e 2n 1 3r 3e 2n 3r2r 3e 2e 2n 1 3r 3e 2n 3r2r GABLE ROOF SCHEDULE Zone ROOF SYSTEM BUILDING PRESSURE PRODUCT PRESSURE Deck, Underlayment, & Attachment Manufacturer Model Florida Product Approval (PSF) (PSF) 1, 2e SEE NOTE 2 OWENS CORNING DURATION SHINGLE FL10674.1 -57.8 VULT = 194MPH 2n, 2r, 3e SEE NOTE 2 OWENS CORNING DURATION SHINGLE FL10674.1 -92.4 VULT = 194MPH 3r SEE NOTE 2 OWENS CORNING DURATION SHINGLE FL10674.1 -99.3 VULT = 194MPH Edward Roske, PE PE # 72228 Date: SHEET REVISIONS SCALESEASIDE ENGINEERSCertificate of Authorization 320484265 60th CourtVero Beach, Florida 32967 www.seasideengineers.com - (772) 202-8008 - info@seasideengineers.comS-1ORCHID ISLAND ROOFINGMulti-family Residential Building 215 River WalkFort Pierce, Florida 34949N.T.S. 06/07/21