HomeMy WebLinkAboutCreekside Lot 94 Sewer Connect.pdfENGINEERING SCIENCES
ka_� q
INSPECTION RESULTS
Inspection Date: `OS —oO Permit Igo. AID 0 9 3 Y
Project:
Address: 3 3 I JJ�I tNQ
Check one:
XRegular Inspection:
❑ Reinspection
Date of Initial Inspection:
'7
Inspection Type Requested
(check):
-B,tifLDtNG/S ucrURA-L
ELECTRfCAL
PLUMBING —
MECHANICAL
Footing
Slab
Underground
Underground
Duct Rou h In
Masonry
Floor Rough -In
Wall Rough -in
8
Rough -In
Stack Piping &Test
Steam Pi i & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
HW piping &Test
g
CHW Piping &Test
Framing
Structural
Panel/Feeder
Service/Ground
Gas Piping & Test
Cond. Piping & Test
Sheet Rock
Appliance/Equipment
Storm Piping & Test
Fixtures
Insulation
Roofing
Lighting Protection
Equipment
Wall &Ceiling
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: ,ql r —
Inspection Results: *AP -Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
0 DP -Disapproved ❑ Not Ready
conditions/Comments:
1.
2.
3.
4.
S.
6.
7.
InspE
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com