Loading...
HomeMy WebLinkAboutCreekside Lot 92 Temp Toilet.pdf`ENGINEERING SCIENCES INSPECTION RESULTS Inspection Date: 7- q' 3 - Q / Permit No. of T cD Q 9 9 Project: Address: 3 Check one: 3C Regular Inspection: ❑ Reinspection Date of Initial Inspection: / - d 3 - Q Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wail Rough -In Stack Piping & Test HW piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Final Building Final Electrical Final Plumbing Final Mechaniral Other Inspection Type: Area Inspected/Code: 5/a % - / ,Q/y �y{ Inspection Results:)KAP-Approved ❑ AE-A proved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved D Not Ready Conditions/Comments: 1. 3. 4. 5. 6. 7. Inspector's Name: Lic.#:� 1 / ��j✓ u OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com