HomeMy WebLinkAboutCreekside Lot 91 Eufer.pdfkDrEK,GINEERING SCIEKCEE
INSPECTION RESULTS
Inspection Date: [ `o?. 3 - o !l Permit No. a/ Y — g) Y
Project: Liza—
Address: 3 3 a I
Check one:
Regular Inspection:
❑ Reinspection
Date of Initial Inspection:
7 - J 3 -a(
Inspection Type Requested
(check):
BUILDING/STRUCTURAL
ELECTRICAL
PLUMBING
MECHANICAL
footing
Underground
Underground
Duct Rough -In
Slab
Floor Rough -in
Rough -In
Steam Piping & Test
Masonry
Wall Rough -In
Stack Piping V. Test
HW Piping & Test
Wall/Ceiling
Ceiling Rough -In
Water Piping V. Test
CHW Piping & Test
Framing
Panel/Feeder
Gas Piping & Test
Cond. Piping & Test
Structural
Service/Ground
Storm Piping &Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall & Ceiling
Roofing
Lighting Protection
Equipment
I
Equipment
Re -inspection
Re -inspection
Re -inspection I
I Re -inspection
Final Building
Final Electrical
Final Plumbing
Final Mechanical
Other Inspection Type:
Area Inspected/Code: /,o
n /J
E LU! KQ�L
Inspection Results:XAP-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed
❑ DP -Disapproved D Not Ready
Conditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspector's Name: 4 Lic.#: &/U y 9 S3
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teamgfa.com