Loading...
HomeMy WebLinkAboutAPPROVED hines pw Section A (General Information) Master Permit No. Process No. Contractors Name: �Vl V �.� License#k_yk,, Job Address z o I " C ROOF CATEGORY 4Low Slope ❑Mechanically Fastened Tile ❑Mortar/Adhesive Set Tiles ❑Asphaltic Shingles OMetal Panel/Shingles ❑Wood Shingles/Shakes ❑ Prescriptive BUR-RAS 150 ROOF ROOF TYPE. ❑ New roof ❑ Repair ❑ Maintenance Reroofing ❑Recovering ;r� ROOF SYSTEM INFORMATION Low Slope Roof Area (SF)_3 Steep Sloped Roof Area(SF) � Total(SF) Section B(Roof Plan) Sketch Roof Plan: Illustrate all levels and sections, roof drains, scuppers, overflow scuppers and overflow drains. Include dimensions of sections and levels,clearly identify dimensions of elevated pressure zones and location of parapets. f a t Section C (Low Slope Roof) Surfacing: Fill in specific roof assembly components and identify Fastener Spacing for Anchor/Base Sheet Attachment: manufacturer Zone V:—" oc @ Lap,#Rows @ "oo (If a component is not used,identify as"NA")c Zone 1:—"oc @Lap,#Rows "cso System Manufacturer: ` J� Zone 2:—"oc @ Lap,#Rows @ "oo Product Approval No.: UC5 L" Zone 3:_.._"oc @ Lap,#Rows @ "flo Number of Fasteners Per Insulation Board: Design Wind Pressures,From RAS 128 Or Calculations: Zone 1': Zone 1: Zone 2: Zone 3: Zone 1':dZone 1: Zone 2:Lzone 3: Illustrate Components Noted and Details as Applicable: Max. Design Pressure, from the specific product approval Woodblocking, Gutter, Edge Termination, Stripping, system: U Flashing, Continuous Cleat, Cant Strip, Base Flashing, Counterflashing,Coping,Etc.. Deck: Indicate: Mean Roof Height,Parapet Height, Height of Base Type: Flashing,Component Material,Material'Thickness,Fastener Gauge Thickness: n X Type,Fastener Spacing or Submit Manufacturers Details that Comply with RAS 111 and Chapter 16.. Slope: � � l�—... Anchor/Base Sheet&No.df Ply(s): Anchor/Base Sheet Fastener/Bonding Material: FT' Insulation Base Layer: Base Insultation Size and Thickness: Parapet Base Insulation Fastener/Bonding Material: Height Top Insulation Layer: Top Insulation Size and Thickness: FT. Top Insulation Fastener/Bonding Material: Mean Base Sheet(s)& No.of Ply(s): Roof Base ee Mau aterial: Height Ply Sheet(s)'&No.of Ply(sc): Ply She st n Bond' aterial; ? Top Ply: Top Ply Fastener/Bonding Material: '. WORKS Section D (Steep Slope Roof System) Roof System Manufacturer: Notice of Acceptance Number: Minimum Design Wind P u; es,If Ap h� ble(From 27 or Calc tions): Zone 1: Z ne 2 Zone 2n: one 2r: one 3e-.A Zone 3r: Deck Type: ri Type Underiayment: Roof Slope: — --' 12 Insulation: Fire Barrier: Ridge Ventilation? Fastener Type&Spacing: i 1 (�j Pa( S t J Adhesive Type: Type Cap Sheet: i Mean Roof`Height: " � _ J Roof Covering: ` C Type&Size Drip a. 1 Edge: . --- 31 r z m O it � � O T 16 18 N N N N 14 14 21 LO Z� 16 91 Q OU cu cu Q Y cu N LLz oC � 2 1 > N � � w � I I 0Ix C\j 0 0 �Z;