Loading...
HomeMy WebLinkAboutAPPROVED 6724 Tulipan - Solar PV Plans • Ground Access Point Ground Access Point F R � O 3' Access Pathway N T Inverter Type: Enphase IQ7PLUS-72-2-US PV Panel: (16) Silfab-SIL 360 NX Racking: Iron Ridge Total Wattage: 5,76OW O Ground Access Point Roof Type: Composition Shingle Wind Load: 7 to 20 Deg F Fastener Type: Use Sunmodo NanoMounts Sheet Index 77 S-1 Cover Sheet/ Site Plan S-2 Detail O E-1 One - Line � O , gutter S-IA Mounting Plan O 2 fire clearance General Notes: T T -Enphase IQ7PLUS-72-2-US Micro Inverters lJ O are located on roof behind each module. R-1 -First responder access maintained and from adjacent roof. Utility Meter # Modules (16) 3'-3 11 -Wire run from array to connection is 40 feet. o Pitch: 14 -COGEN Disconnect Azimuth: 180' 6'-011 Located adjacent to Utility meter Layout Subject to Change Based on Site Conditions SOLAR BEAR A��<<,•��,E.��E• Donnie C 6101 Johns Rd, Ste 8 Godwin Engineering and Godwin GN GD Tam a FL 33634 Design, LLC No 81360 p ' 8378 Foxtail Loop 202 •06•%O; STATE OF 727-471-7442 System meets the requirements of NFPA 70th Edition, Chapter 11.12 Install will be done to Manufacturer Spec Pensacola, FL 32526 25 NA1 --- Meets All Editions of Florida Fire Prevention Code 2017 7th Edition Customer Info: D. Chad Godwin, PE 1 3:40:49 Legend Chimney 100105_ 1 st Responder Access Chad@godwineng.com o EErgo• �ES o0 � � First responder access � Satellite ❑O Utility Meter O Vent Pipe Represents all Fire Clearance p Kenneth Bogan Date: 6/19/2021 N❑� PV Disconnect including Alternative methods m an Drawn minimum of 36" unobstructed as per 6724 Tuli b GKS Section R324 of the 2018 IRC h Y� Meets the requirements of the following- (2020 FL Residential Code & FBC, 7th Edition (2018 Fort Pierce, FL Revised b International Residential Code) - 2nd Printing modified by the FL Building Standards , 2018 34951 Rev D International Energy Conservation Code, County of Saint Lucie Code, 2017 National Electric Code.) Rev Date: Page: S-1 Coin ass for Aerial Solar Module x HEX HEAD BOLT 3f8-76 FLANGE NU T 3-5/8 �! Ironridge XR-100 General Notes: General Notes: (Optional) Install will be done to Manufacturer Spec - Sunmodo Nano Mount are secured to rafters - Sunmodo Nano Mount are secured to plywood decking No 01960 '; @ 24" O.C. in Zone 1, @ 24" O.C in Zone 2 e, @ Godwin Engineering and =9`_ STATE. 24 O.C. in Zone 1 =°FF<oa o�= @ 24" O.C. in Zone 2r, & @ 24" O.0 in Zone 3 Design, LLc -No Mounts To Be Installed Zone 2r, 2e & 3 8378 Foxtail Loop .No using 5/16" x 4.75" stainless steel Lag bolts. using (4) #6.3mm x 76.2mm stainless steel Lag bolts. Pensacola, FL 32526 Donnie�EC�Godwin - Subject roof has One layer. - Sub•ect roof has One layer. D. Chad Godwin, PE 2021 .06.25 - All penetrations are sealed. - � y Chad@godwineng.com All penetrations are sealed. '00'05- 13:41 :39 Roof Section Pitch Roof Rafter and Spacing Overhang Notes: RI 4/12 2"x4" g 24 O.C. 1211 Truss SOLAR BEAR -Designed as per ASCE7-16 Customer Info: 6101 Johns Rd, Ste 8 -Roof Height 15' Inverter Type: Enphase IQ7PLUS-72-2-US Tampa, FL 33634 g PV Panel: (16) Silfab-SIL 360 NX 727-471-7442 -Per 2020 FBC, the Roof Mounted PV System Racking: Iron Ridge Kenneth Bogan Date: 6/19/2021 will be subject to the following design criteria: Total Wattage: 5,760W 6724 Tulipan Drawn by: GKS Design Wind Speed(Vult) - 160mph 3 sec gust, Roof Type: Composition Shingle Fort Pierce, FL Revised b : Wind Load: 7 to 20 Deg Rev #• 00 Exposure Category - C Fastener Type: Use Sunmodo NanoMounts 34951 Rev Date: Page: S-2 SOLAR PV SYSTEM EQUIPPED 3/5IN MIN.TEXT WITH RAPID SHUTDOWN DUAL POWER SUPPLY INVERTER OUTPUT CONNECTION: SOURCES:UTILITY GRID AND DO NOT RELOCATE THIS TURN RAPID PV SOLAR ELECTRIC SYSTEM OVERCURRENT DEVICE Enphase Output Ckt Per String SHUTDOWN SWITCH T 3/161N MIN.TEXI THE'OFF"POSITION T SHUT DOWN PV To Overcurrent Protection Device SYSTEM AND REDUCE SHOCK HAZARD IN THE W N I AC Max Output Current g•�$ ARRAY. 1 POWER SOURCE OUTPUT CONNECTION: Enphase IQ Trunk Cable Photovoltaics: AC Max Output Current * 1.25% 12.1 DO NOT RELOCATE THIS OVERCURRENT WARNING: DEVICE Q-12-240 (16) Silfab-SIL 360 NX Overcurrent Protection A 20 PHOTOVOLTAIC SYSTEM DEDICATED SOLAR PANEL DO #12AWG THHN-THWN-2 No. of Current Carrying Cond �' TH RAPID SHUTDOWN EQUIPPED WITH NOT CONNECT ANY OTHER LOADS UL 9703 Inverters: Conductor Gauge AWG 10 (16) Enphase IQ7PLUS-72-2-US Micro Inverters Enphase Total Output Ckt Grounding Conductor AC Max Output Current 19.36 to be bare#8 Awg Circuits: AC Max Output Current * 1.25% 24.2 (2) circuits of(8) Modules Overcurrent Protection(A) 30 NEMA 3R Maximum Inverters Per 20A Circuit (13) No. of Current Carrying Cond <4 #12 OF Cable for Home runs under 100' lu latlori Box Black-Ll Roof Conductor Gauge (AWG) 14 #10 OF Cable for Home runs over 100' (1)Line 1 Red-L2 NEC LABEL NOTES: (1)Line 2 Green-Ground 1. THE WARNING SIGN(S)OR LABEL(S)SHALL COMPLY Per Circuit WITH NEC 110.21(B) (1)EGC 2. LABELS SHALL BE SUITABLE FOR THE ENVIRONMENT WHERE THEY ARE INSTALLED. Load Side Connection 3. LABELS TO BE A MIN LETTER HEIGHT OF 3/8"AND PERMANENTLY AFFIXED. 4. LABELS SHALL ALSO COMPLY WITH THE SPECIFIC %WARNING Busbar Rating 150 REQUIREMENTS OF THE AUTHORITY HAVING OCK HAZARD Main Breaker Size G JURISDICTION. 150H TERMINALS. Bus Rating*1.2-Main Break Size 30 OTH THE LINE AND GIZED IN Max Allowable Load Side 30 Load Size Breaker Size 30 Meter • • • WARNING:PHOTOVOL Main Distribution Panel • • Main Service 150A Main POWER SOURCE 150A M RATED AC OUTPUT CURRENT: 19.36 A U.side Tap NOMINAL OPERATING VOLTAGE: 240VAC 150A Bus -ID­ 1 Donnie C 6oAsm11— Enphase Combiner Box Utility PV AC Disco lmaaow a.a ff `,`\GNADIIIG`IO��i,, A30AFm� 60 A Fused Disconnect Godwin Engineering and g�..2,.,, (1)-20A Breaker Manual Lockable Disconnect Godwin L Per Circuit Design, LLC No a13so , 2021 .06. .i *- IIbAWGTaW 2 Circuits 30A Q Q =° (I)Li.el #6AWG nli 240V 8378 FOXta11 Loop %� STATE OF :•�: (1)Li.c2 (1)I.i.a1 10 O,C�•••C (qN-1 <'>LLZ2 15A Breaker for Envoy (2)30A Fuses 2 5 •F•.<o R 10,:••�• nanleoc ll3/4"C-duilT u — ACD ffibud..P 1 Disconnect Pensacola, FL 32526 �����S�ONAIE��`• i.Q 1w 3/4"C..duit Ty ic.Ily 'v ypiw y oc Sub P—I II \\ I/IIIIIII\\ Solar Combiner Box N D. Chad Godwin, PE (I)N8AWG13GC@GEC #x-IQ-AMI-240 13:41 :56 A NePoe�, Located Adjacent to Utility Meter Chad@godwineng.com ANo ar,ELE�aoNo�p� o0 Optional Line side connection 10 010 5- (when available)Per 705.12(A) #10 AWG THWN GEC (2)Hot Neutral #8 AWG EGC in in @least 3/4"Conduit Typically 50ILAR.[BEAR Load side connection Per 705.12(B)(2)(3)(b) 6101 Johns Rd, Ste 8 Use Matching or equivalent approved breaker if derating Including the label below GEC NOTES Customer Info: Tampa, FL 33634 Note: 727-471-7442 -All wiringto the 2017 NEC and - Ungrounded System per 690.41(A)(4) 1 o meet - Kenneth Bogan GEC must be installed per 250.64 Date: 6/19/2021 g Y b In Case of Emergency all Florida electric codes. - GEC must be continuous un-spliced or irreversibly spliced from GKS Inverter Type: inverter to existing service ground system or continuous from the Drawn b ' Solar Bear 30A Disconnect Y Enphase IQ7PLUS-72-2-US arrays to the existing service ground system. 6724 Tullpan Revised by: PV Panel: at 727-471-7442 -Type of conduit to be determined - GEC must be min#8 AWG and installed in conduit (16) If GEC is not in conduit,it must be#6 min Fort Pierce, FL Rev #: 00 Silfab-SIL 360 NX EC #: EC 13006630 on site by contractor. Total Wattage: All Labels&Markings for photovoltaic system will be 34951 Rev Date: 5,760W Install will be done to Manufacturer Spec reflective and meet all requirements for NFPA 11.12 Page: E-1 ( — Proposed Mounting locations Iron Ridge Rail 28'-611 XR-100 17' 2 XR-100 14' � 6 J L QL QL QL XR-100 7 12'- 10" �(D L o (D „ 9'- 11 " g'_4" 171-5 0 0 Splice Bar 2 4' 7" L O O L OK� L O L O 2' gutter fire clearance Sunmodo Nano Mounts 54 0 o L o o © o L o 0 5'- 1 11 Iron Ridge UFO's 38 3'-7 1 Iron Ridge Sleeves/End Caps 12 3 1-3 11 Combiner 1 Iron Ridge Ground Lugs 3 5 8 1-4' Silfab-SIL 360 NX 16 61-0 " Enphase IQ7PLUS-72-2-US 16 R-1 Plans satisfy zones FBC-1510.7.1 60A Fused Disconnect 1 # Modules (16) Install will be done to Manufacturer Spec 30A Fuses w/ Reducers 2 0 °N.81360 Pitch: 20 - ° 20A Breakers 2 o Godwin Engineering and Azimuth: 180 "�s q Enphase Combiner Box 1 Design, LLC 30A Breaker 1 8378 Foxtail Loop Pensacola, FL 32526 Donnie C Godwin D. Chad Godwin, PE 2021 .06.25 Chad@godwineng.com '00'05- 13:42:11 Max cantilever is 8" as per manufacturer spec. Zone 1, 2e, 2r & 3: Max Cantilever = Max Span * (1)=24"*0=8" SOLAR BEAR .......1..........t1.c Customer Info• 6101 Johns Rd, Ste 8 Inverter Type: Enphase IQ7PLUS-72-2-US Tampa, FL 33634 PV Panel: (16) Silfab-SIL 360 NX 727-471-7442 Racking: Iron Ridge Kenneth Bogan Date: 6/19/2021 Total Wattage: 5,760W 6724 Tulipan Drawn by: GKS Roof Type: Composition Shingle Fort Pierce, FL Revised by: Wind Load: 7 to 20 Deg 34951 Rev #: 00 Fastener Type: Use Sunmodo NanoMounts Rev Date: Page: S-1 A Electrical Specifications SIL-360 Test Conditions STC NOCT Module Power(Pmax) Wp 360 258 Maximum power voltage(Vpmax) V 36.6 33.1 Maximum power current(lpmax) A 9.9 7.8 Open circuit voltage(Voc) V 44.5 40.4 I If Short circuit current(Isc) % 1 .5 8.2 S " a SlLm360 Module efficiency 19.7 17.6 Maximum system voltage(VDC) V 1000 SOLAR - Series fuse rating A 20 hL Power Tolerance Wp 0 to+10 Measurement conditions:STC 1000 W/m2•AM 1.5•Temperature 25'C•NOCT 800 w/m=•AM 1.5•Measurement uncertainty<3% ,rTIER •Sun simulator calibration reference modules from Fraunhofer Institute.Electrical characteristics may vary by±5%and power by 0 to+1OW. " �_- AUxOMATED Temperature Coefficient Isc +0.064%/°C Temperature Coefficient Voc -0.28%/°C Temperature Coefficient Pmax -0.36%/°C NOCT(±2°C) 46°C OperatingINDUSTRY LEADING WARRANTY Mechanical temperats and ure Components •-4o/ moo , All our products include an industry Metric Imperial leading 25-year product workmanship Module weight 20±0.2 kg 44±0.4lbs and 30-year performance warranty. Dimensions(H x L x D) 1832 mm x 1000 mm x 38 mm 72.13 in x 39.4 in x 1.5 in D Maximum surface load(wind/snow)* 4000 Pa rear load/5400 Pa front load 83.5/112.8 Ib/ftA2 35+YEARS OF SOLAR INNOVATION Hail impact resistance o 25 mm at 83 km/h o 1 in at 51.6 m h Leveraging y in g over 35+ ears of worldwide Cells 66 1 mono-PERC-5 busbar 66 Si mono PERC 5 busbar 58.75 x 158.75 mm 62.25 x 62.25 in experience in the solar industry,Silfab Glass 3.2 mm high transmittance,tempered, 0.126 in high transmittance,tempered, is dedicated to superior manufacturing DSM anti-reflective coating DSM anti-reflective coating Cables and connectors(referto installation manual) 1200 mm o 5.7 mm,MC4 from Staubli 47.2 in, o 0.22(12AWG),MC4 from Staubli processes and innovations such as High durability,superior hydrolysis and UV resistance,multi-layer dielectric film, Bifacial and Back Contact technologies, Backsheet fluorine-free PV backsheet to ensure our partners have the latest in Frame Anodized Aluminum(Black) solar innovation. Bypass diodes 3 diodes-30SQ045T(45V max DC blocking voltage,30A max forward rectified current) Junction Box UL 3730 Certified,IEC 62790 Certified,IP67 rated NORTH AMERICAN QUALITY .1 NX mono ' RC Silfab is the leading automated solar Module product workmanship warranty 25 years** module manufacturer in North America. Linear power performance guarantee 30 ears1. p p g >_97.1%end 1 It year >_91.6%end 12th year >_85.1%end 25th year >_82.6%end 30th year, Utilizing premium quality materials and _ _ = strict quality control management to deliver ULC ORD C1703,UL1703,CEC listed***•UL 61215 1/1 1/2,UL 61730 1/2, e the highest efficiency,premium quality Product IEC 61 21 5-1/-1-1/-2***.IEC 61730-1/-2***,CSAC22.2#61730-1/-2,IEC62716 PV modules. Ammonia Corrosion;IEC61701:2011 Salt Mist Corrosion Certifed UL Fire Rating:TVpe 2 Factory IS09001:2015 .3 All states except California California eee Modules Per Pallet:26 eee Modules Per Pallet:26 1.5"[3amm] _ e Pallets Per Truck:34 ee Pallets Per Truck:32 e 5 ..e Modules Per Truck:884 .ee Modules Per Truck:832 o D,.inage(x8) 0 Eo N *A Warning.Read the Safety and Installation Manual for mounting specifications and before handling, M° ng H°le(x4)N installing and operating modules. S - **12 year extendable to 25 years subject to regis 75 - tration and conditions outlined under"Warranty'at o • •, • _ • • • • 1 1 • ,• • • • •, www.silfabsolar.com. E - • • �-•. • • • • • • • • progress. e ***Certification and CEC listingin • • • • ,• •, • • •• • • • • PAN files generated from 3rd party performance s E • • data are available for download at: N E 3 www.siIfabsolar.com/downloads. _ ' " C • • • • • • •- • - -• • • ••. - • •.• • • • • • •• • E E o o •.• •. • • • �111• • • •. • • • • • • .• -• • •• • C C ° Silfab Solar Inc. • • •. • :1 _ i 240 Courtneypark Drive East Mississauga ON L5T2Y3 Canada • • • • . . . S 11 fa b Tel+1 905-255-2501 1 Fax+1 905-696-0267 04.Zmm(2) SOLAR info@silfabsolar.eom I www.silfabsolar.com Gr° ftg H°le o © ® Silfab Solar Inc. 36.11"[ss6mm] o 39.37"[1000mm] 800 Cornwall Ave _ Bellingham WA 98225 USA Tel+1 360-569-4733 01 Data Sheet Enphase IQ 7 and IQ 7+ Microinverters Enphase Microinverters INPUT DATA(DC) IQ7-60-2-US/IQ7-60-B-US IQ7PLUS-72-2-US/IQ7PLUS-72-B-US Region:AMERICAS Commonly used module pairings' 235 W-350 W+ 235 W-440 W+ Module compatibility 60-cell PV modules only 60-cell and 72-cell PV modules Maximum input DC voltage 48 V 60 V Peak power tracking voltage 27 V-37 V 27 V-45 V Operating range 16 V-48 V 16 V-60 V Min/Max start voltage 22 V/48 V 22 V/60 V The high-powered smart grid-ready Max DC short circuit current(module Ise) 15 A 15 A Overvoltage class DC port 11 11 Enphase Enphase IQ 7 MicroTM and Enphase IQ 7+ MicrOTM DC port backfeed current 0 A 0 A Q 7 and I Q 7 dramatically simplify the installation process while PV array configuration 1 x 1 ungrounded array;No additional DC side protection required; AC side protection requires max 20A per branch circuit achieving the highest system efficiency. OUTPUT DATA(AC) IQ 7 Microinverter IQ 7+Microinverter Peak Microinverters Part of the Enphase IQ System,the IQ 7 and Maximum umcontinutput 240 VA 290VA Maximum continuous output power 240 VA 290 VA IQ 7+ Microinverters integrate with the Enphase Nominal(L-L)voltage/ranger 240 V/ 208V/ 240 V/ 208 V/ 211-264 V 183-229 V 211-264 V 183-229 V IQ Envoy'"', Enphase IQ Battery'"", and the Enphase Maximum continuous output current 1.0 A(240 V) 1.15 A(208 V) 1.21 A(240 V) 1.39 A(208 V) Enlighten'"" monitoring and analysis software. Nominal frequency 60 Hz 60 Hz Extended frequency range 47-68 Hz 47-68 Hz IQ Series Microinverters extend the reliability AC short circuit fault current over 3 cycles 5.8 Arms 5.8 Arms standards set forth by previous generations and Maximum units per 20 A(L-L)branch circuit' 16(240 VAC) 13(208 VAC) 13(240 VAC) 11 (208 VAC) Overvoltage class AC port III III undergo over a million hours of power-on testing, AC port backfeed current 0 A 0 A enabling Enphase to provide an industry-leading Power factor setting 1.0 1.0 warranty of up to 25 years. Power factor(adjustable) 0.7 leading...0.7 lagging 0.7 leading...0.7 lagging EFFICIENCY @240 V @208 V @240 V @208 V Peak CEC efficiency 97.6% 97.6% 97.5% 97.3% CEC weighted efficiency 97.0% 97.0% 97.0% 97.0% MECHANICAL DATA Ambient temperature range -400C to+65°C Relative humidity range 4%to 100%(condensing) Easy to Install Connectortype(I07-60.2-US&IQ7PLUS-72-2-US) MC4(or Amphenol H4 UTX with additional Q-DCC-S adapter) Connector type(I07-60-B-US&IQ7PLUS-72-B-US) Friends PV2(MC4 intermateable). • Lightweight and simple Adaptors for modules with MC4 or UTX connectors: • Faster installation with improved,lighter two-wire cabling PV2 to MC4:order ECA-S20-S22 PV2 to UTX:order ECA-S20-S25 • Built-in rapid shutdown compliant(NEC 2014&2017) Dimensions(WxHxD) 212 mm x 175 mm x 30.2 mm(without bracket) Weight 1.08 kg(2.38 Ibs) Productive and Reliable Cooling Natural convection-No fans Approved for wet locations Yes • Optimized for high powered 60-cell and 72-cell*modules Pollution degree PD3 • More than a million hours of testing Enclosure Class 11 double-insulated,corrosion resistant polymeric enclosure • Class 11 double-insulated enclosure Environmental category/UV exposure rating NEMA Type 6/outdoor • UL listed FEATURES Communication Power Line Communication(PLC) Monitoring Enlighten Manager and MyEnlighten monitoring options. Smart Grid Ready Both options require installation of an Enphase IQ Envoy. Disconnecting means The AC and DC connectors have been evaluated and approved by UL for use as the load-break Complies with advanced grid support,voltage and disconnect required by NEC 690. _ frequency ride-through requirements Compliance CA Rule 21 (UL 1741-SA) Remotely updates to respond to changing UL 62109-1,UL1741/IEEE1547,FCC Part 15 Class B, ICES-0003 Class B, grid requirements CAN/CSA-C22.2 NO.107.1-01 This product is UL Listed as PV Rapid Shut Down Equipment and conforms with NEC-2014 and • Configurable for varying grid profiles NEC-2017 section 690.12 and C22.1-2015 Rule 64-218 Rapid Shutdown of PV Systems,for AC • Meets CA Rule 21 (UL 1741-SA) and DC conductors,when installed according manufacturer's instructions. U *The IQ 7+Micro is required to support 72-cell modules. 1.No enforced DC/AC ratio.See the compatibility calculator at httos://enphase.com/en-us/su000rt/module-compatibility. 2.Nominal voltage range can be extended beyond nominal if required by the utility. 3.Limits may vary.Refer to local requirements to define the number of microinverters per branch in your area. E N P H AS E® To learn more about Enphase offerings,visit enphase.com E N PHASE. To learn more about Enphase offerings,visit enphase.com u �./ ©2018 Enphase Energy.All rights reserved.All trademarks or brands used are the property of Enphase Energy,Inc. 2018-05-24 Data Sheet Enphase IQ Combiner 3 Enphase Networking MODEL NUMBER IQ Combiner 3 X-I0-AM1-240-3 IQ Combiner 3 with Enphase IQ Envoy'"printed circuit board for integrated revenue grade PV production metering(ANSI C12.20+/-0.5%)and optional*consumption monitoring(+/-2.5%). ACCESSORIES and REPLACEMENT PARTS(not included,order separately) Enphase Mobile Connect" CELLMODEM-03(4G/12-year data plan) Plug and play industrial grade cellular modem with data plan for systems up to 60 CELLMODEM-01 (3G/5-year data plan) microinverters.(Available in the US,Canada,Mexico,Puerto Rico,and the US Virgin Islands, CELLMODEM-MI(4G based LTE-M/5-year data plan) where there is adequate cellular service in the installation area.) Enphase The Enphase IQ Combiner 3" with Enphase Consumption Monitoring*CT CT-200-SPLIT Split core current transformers enable whole home consumption metering(+/-2.5%). IQ EnvoyTM consolidates interconnection Circuit Breakers Supports Eaton BR210,BR215,BR220,BR230,BR240,BR250,and BR260 circuit breakers. IQ Combiner 3 equipment into a single enclosure and BRK-10A-2-240 Circuit breaker,2 pole, 10A,Eaton BR210 v g BRK-15A-2-240 Circuit breaker,2 pole,15A,Eaton BR215 (X-I AM1-240-3) g y BRK-20A-2P-240 Circuit breaker,2 pole,20A,Eaton BR220 Q- streamlines PV and storage installations b EPLC-01 Power line carrier(communication bridge pair),quantity 2 providing a consistent, pre-wired solution for XA-PLUG-120-3 Accessory receptacle for Power Line Carrier in IQ Combiner 3(required for EPLC-01) residential applications. It offers up to four XA-ENV-PCBA-3 Replacement 10 Envoy printed circuit board(PCB)for Combiner 3 ELECTRICAL SPECIFICATIONS 2-pole input circuits and Eaton BR series Rating Continuous duty busbar assembly. System voltage 120/240 VAC,60 Hz Eaton BR series busbar rating 125 A Max.continuous current rating(output to grid) 65 A Max.fuse/circuit rating(output) 90 A Branch circuits(solar and/or storage) Up to four 2-pole Eaton BR series Distributed Generation(DG)breakers only(not included) Max.continuous current rating(input from PV) 64 A Smart Max.total branch circuit breaker rating(input) 80A of distributed generation/90A with IQ Envoy breaker included Production Metering CT 200 A solid core pre-installed and wired to IQ Envoy j) Includes IQ Envoy for communication MECHANICAL DATA and control — - -—- —— — — -- --Flexible networking supports Wi-Fi, — Dimensions(W%HxD) 49.5 x 37.5 x 16.8 cm(19.5"x 14.75"x 6,63"),Height is 21,06"(53.5 cm with mounting brackets). • Ethernet,or cellular Weight 7.5 kg(16.5 Ibs) t I I Ambient temperature range -400 C to+461 C(-400 to 1150 F) Optional AC receptacle available for PLC ? bridge Cooling Natural convection,plus heat shield - Provides production metering and optional Enclosure environmental rating Outdoor,NRTL-certified,NEMA type 3R,polycarbonate construction consumption monitoring Wire sizes 20 A to 50 A breaker inputs: 14 to 4 AWG copper conductors •"I 1 60 A breaker branch input: 4 to 1/0 AWG copper conductors IMain lug combined output: 10 to 2/0 AWG copper conductors Simple Neutral and ground: 14 to 1/0 copper conductors Always follow local code requirements for conductor sizing. — I Reduced size from previous combiner Altitude To 2000 meters(6,560 feet) Centered mounting brackets support single INTERNET CONNECTION OPTIONS stud mounting Integrated Wi-Fi 802.11b/g/n • Supports back and side conduit entry Ethernet Optional,802.3,Cat5E(or Cat 6)UTP Ethernet cable (not included) • Up to four 2-pole branch circuits for 240 VAC Cellular Optional,CELLMODEM-01 (3G)or CELI-MODEM-03(4G) or CELLMODEM-M I(4G based LTE-M) plug-in breakers(not included) (not included) • 80 Atotal PV or storage branch circuits COMPLIANCE Compliance,Combiner UL 1741 CAN/C Reliable 47CFRSPart 15,Class B,ICES 003 Production metering-ANSI C12 20 accuracy class 0.5(PV production) • Durable NRTL-certified NEMA type Compliance,IQ Envoy UL 60601-1/CANCSA 22.2 No.61010-1 3R enclosure U • Five-year warranty *Consumption monitoring is required for Enphase Storage Systems. o ` UL listed To learn more about Enphase offerings,visit enphase.com LISTED E N P H AS E ©2018 Enphase Energy.All rights reserved.All trademarks or brands in this document are registered by their respective owner. E N P H AS E® To learn more about Enphase offerings,visit enphase.com 2018-09-13 �m� /lam IRONRIDGE XR Rail Family XR Rail Family The XR Rail Family offers the strength of a curved rail in three targeted sizes. Each size supports specific Solar Is Not Always Sunny design loads, while minimizing material costs. Depending on your location, there is an XR Rail to match. Over their lifetime, solar panels experience countless extreme weather events. Not just the worst storms in years, but the worst storms in 40 years. High winds capable of i ripping panels from a roof, and snowfalls weighing enough to buckle a panel frame. XR Rails are the structural backbone preventing these results. They resist uplift, protect XR10 XR100 XR1000 against buckling and safely and efficiently XR10 is a sleek,low-profile mounting XR100 is the ultimate residential XR1000 is a heavyweight among transfer loads into the building structure. rail,designed for regions with light or mounting rail. It supports a range of solar mounting rails.It's built to handle Their superior spanning capability no snow.It achieves spans up to 6 feet, wind and snow conditions,while also extreme climates and spans up to 12 while remaining light and economical. maximizing spans up to 10 feet. feet for commercial applications. requires fewer roof attachments, reducing the number of roof 6'spanningcapability 10'spanningcapability 12'spanningcapability penetrations and the amount -� Moderate load capability Heavy load capability Extreme load capability • Clear&black anodized finish Clear&black anodized finish Clear anodized finish of installation time. Internal splices available Internal splices available Internal splices available Rail Selection fThe table below was prepared in compliance with applicable engineering codes and standards.*Values are based on the following criteria:ASCE 7-16, Gable Roof Flush Mount, Roof Zones 1 & 2e, Exposure B, Roof Slope of 8 to 20 degrees and Mean Building Height of 30 ft. Visit IronRidge.com for detailed certification letters. Mill Force-Stabilizing Curve 90 Sloped roofs generate both vertical and lateral forces on mounting rails which can cause them 120 7M to bend and twist.The curved shape of XR Rails None is specially designed to increase strength in both 140 XR10 XR100 XR1000 directions while resisting the twisting.This unique 160 feature ensures greater security during extreme weather and a longer system lifetime. 90 120 � 20 140 160 9 30 0 160 Compatible with Flat&Pitched Roofs Corrosion-Resistant Materials 90 XR Rails are IronRidge offers All XR Rails are made of 6000-series F 40 compatible with a range of tilt leg aluminum alloy,then protected with an 160 FlashFoot and options for flat anodized finish.Anodizing prevents surface other pitched roof roof mounting and structural corrosion,while also providing I 80 160 attachments. applications. a more attractive appearance. 120 160 'Table is meant to be a simplified span chart for conveying general rail capabilities.Use approved certification letters for actual design guidance. GODWIN ENGINEERING AND DESIGN, LLC 8378 Foxtail Loop,Pensacola, FL 32526 1 (850)712-4219 1 chad@godwineng.com June 24, 2021 To: St. Lucie County Building Division 2300 Virginia Avenue Ft. Pierce, FL 34982 Re: Bogan-Residential PV Roof Mount Installation 6724 Tulipan Fort Pierce, FL 34951 Plan Reviewer, This letter is regarding the installation of a new roof mounted Solar PV System on the existing residential structure at the address above.I have reviewed the attachment plan and have determined that the roof mounted PV system is in compliance with the applicable sections of the following Codes as amended and adopted by the jurisdiction: 2020 Florida Building Code 7th Edition,FBC ASCE 7 Min. Design Loads for Buildings&Other Structures Per 2020 FBC,the Roof Mounted PV system will be subject to the following design criteria: Design Wind Speed(V„lt) - 160mph 3sec gust, Exposure Category- C The PV System consist of the modules,railing,and connection hardware.The system will add a dead load of approximately 3 psf to the roof. The existing roof covering is Asphalt Shingle with min. Y2"plywood decking and 2"x 4" roof trusses 24" O.C. The roofing,decking,and roof trusses are in good condition.The existing structure will be adequate for supporting the additional PV dead load and wind loads. The securement method of the PV system is to be flush mounted to the asphalt shingle roof with the Ironridge railing and the Sunmodo Nano mounts.The attachments can be attached up to 24"apart in roof zones 1, 2e,2r,and 3.The mounts should be staggered,where possible,to allow distribution of the design loads evenly to the structure.The mounts shall be installed with a min. 5/16"lag screw with minimum 2-5/16"thread length. Please see attached documents and contact me should you have any questions. d`GNAD��GOppi Donnie C ENSF.,Gy- Sincerely, Godwin N. 81360 STATE .1 D. Chad Godwin,PE 81360 2021 .06.25 Exp. 02/28/2023 13:42:36 ; 100105- All �o 00 ASCE 7-16 CHAPTER 29 WIND LOADS-Rooftop Solar Panels Minimum Design Loads-Part 1:Enclosed(Hip,h<60ft,8°<0<20°) Risk Category II Table 1.5-1 Load Types Load,PSf Basic Wind Speed(Ult) 1 Figure 26.5-1B Dead Load,D 3 Wind Speed(asd) 124 FRC R301.2.1.3 Weight of Ice,Di 0 Roof Angle 8 to 20 Earthquake,E 0 Effective Wind Area 20.00 ft2 26.20 Fluid,F n/a Wind Load Parameters Flood Load,Fe n/a Wind Directionality Kd 0.85 Table 26.6-1 Lateral Earth psi,H n/a Exposure Cat. B,C,or D C Section 26.7 Live Load,L n/a Topographic factor K,t 1.00 26.8 or 26.8.2 Roof Live,Lr n/a Ground Elevation Factor Ke 1.00 Table 26.9-1 Rain,R n/a Velocity Exposure Coefficient K, 0.90 Table 26.10-1 Snow,S Array Edge Factor YE 1.50 29.4.4 *Modules are considered Exposed Self-Straining,T n/a Solar Panel Equalization Factor Y. 0.68 Fig.29.4-8 Wind,W see talc Velocity Pressure qh 30.08 psf qh=0.00256 K,K,,KdK,V2 Wind-on-Ice,Wi n/a Mean Roof Height h 20.00 ft h2 5 in Not,10in(height above roof) 0.4h 8.00 ft 2h2 10 In min distance array shall be from the roof edge,Gable Ridge,or hip ridge least horizontal dim(Typ.) 360 in 0.25 in min gap betweenall panels but no 6.7ft 10%O of least horizontal dim 3.00 ft dl 1.00 ft Horizontal distance orthogonal to panel edge Roof Zone Set Back a 3.00 ft d2 0.25 ft Horizontaldistancefromedgeofonepanelto theneare-digeinthenextro h/B 0.67 0.5h 10.00 ft 1.51-p 9.00 ft Figure 30.3-2G(Hip roof,h<60ft,7°<0<20°) Zone 1 2r 2e 3 GC, -1.30 1 -1.70 1 -1.70 -2.20 uplift GCpj 0.70 1 0.70 1 0.70 1 0.70 1 downward p=gh(GCp)(-/j(Ya) -39.86 -52.13 -52.13 -67.46 psf uplift 29.4-7 p=gh(GCp)(7'E)(Ya) 21.46 21.46 21.46 21.46 psf downward 29.4-7 Design Calculations for the Use of Attachment to Roof Truss/Rafter Module Length C(Lp) 6.00 ft Module Width B 3.33 ft Module Area A 20 ft2 Total Design Load(Uplift) Pde,ign -36.86 -49.13 -49.13 -64.46 psf Total Design Load(Downforce) Pdmign 21.46 21.46 21.46 21.46 psf Design Load per Module Tup -737.27 -982.58 -982.58 -1289.22 Its Tup=A*Pde,ig0 Design Load per Module Td-. 429.30 429.30 429.30 429.30 Its Tan=A*Pde,ig0 Distributed Load(Uplift) Pdi,t.up -110.59 -147.39 -147.39 -193.38 plf Tup/B*2 Distributed Load(Down) Pelt.Down 64.39 64.39 64.39 64.39 plf Tdn/B*2 Railspan Between Anchor Points L 2 2 2 ft Point Load per Mount(Uplift) R -221.18 -294.77 -294.77 -3862.77 Its Point Load per Mount(Down) R 64.39 64.39 1 64.39 64.39 Its 1 2r 2e 3 Table 1.1-Pullout Value for Single Lag Screw Specific Gravity G 0.55 0.55 0.55 0.55 Table 11.2A,NDS 2005,page 68(SYP) Diameter of Lag Screw D 5/16 5/16 5/16 5/16 In Pullout Value of W 306.8697 306.8697 306.8697 306.8697 lbs/in W=1800 G'f7 D'f4 #of Lag screws 1 1 1 1 Thread Length Td 2.3125 2.3125 2.3125 2.3125 In Table L2,NDS 2005 Design Pullout Value per Mount Wt 709.6363 709.6363 709.6363 709.6363 Wt=W*#of Lags*Td SAFTEY FACTOR SF 3.21 2.41 2.41 1.83 Calculation:SF=WOR(Uplift) 1 2r 2e 3 Maximum Cantilever from Last attachment Max Cantilever M 8 8 8 8 in Max rail span*33% °GNP°lfGoo�o. Donnie C OEIVS�.�y�'.'. Godwin 2021 .06.25 'o'• STATE OF -'I- 4�SS'•... 13:42:51 . °NA;, GOD t 00 t 05 D TE 111TE1INUSIN DIEERE.l"SIGAT nEAND al.NED A..111EIT E orTHESIG AITURE MUSTBEVERIFIEDON