Loading...
HomeMy WebLinkAboutAPPROVED SD Permit o� ST. LOCIE VVO.r)�r�#�=a June 25, 2021 Board of County Commissioners KMA Engineering & Surveying, LLC Chris Dzadovsky 2345 14th Ave, Suite #3 DISTRICT 1 Vero Beach, FL 32960 Chair Attention: Darren Guettler, P.E. Sean Mitchell DISTRICT 2 Subject: Site Development Permit Vice-Chair Maverick Boat Company, Phase 2 Offsite Roadway Turn Lane Improvements Linda Bartz Ref: PDS # 2017-112 BLDG Permit#2105-0262 DISTRICT 3 The Phase 2 Construction Plans signed and sealed June 24, 2021 and offsite roadway plans signed and sealed June 4, 2021, are accepted for construction of the Frannie Hutchinson site improvements as proposed. DISTRICT 4 Construction of site improvements is conditioned on the following: 1. Prior to commencement of any construction of site improvements or access, the Cathy Townsend FOR shall coordinate a pre-construction meeting including the St. Lucie County DISTRICT 5 Public Works representatives, Robert Krip, 772-519-0440, KripR(ostlucieco.org. 2. A set of plans stamped as accepted by the County, together with all other applicable permits shall be on site at all times during construction. 3. Prior to commencement of work, all other agency permits must be obtained and followed. The more stringent condition of common or conflicting conditions shall Administration be met. Discrepancies within the plans shall be appropriately addressed and does not relieve the contractor of his obligation to construct according to local, state and federal rules and regulations. Howard Tipton 4. Site inspections shall be coordinated as established at the Pre-Construction COUNTY meeting. Inspections shall be performed at a minimum for the following stages: ADMINISTRATOR A. Subgrade compaction testing and stringline B. Base compaction and stringline C. Asphalt/paving Dan McIntyre D. Final after FOR Certification COUNTY ATTORNEY 5. Any proposed changes to the permitted stamped plans must be approved by the County prior to initiating any change in construction. This includes material changes such as pavement type, type of drainage pipe, etc. 6. Any structure shown or not shown on the plans (such as walls, gates, signs, columns, etc.) requiring a building permit, such permit shall be obtained prior to initiating construction on such structures. This permit does not authorize the construction of above ground structures. PUBLIC WORKS DEPARTMENT Q chambersg@a,stlucieco.org in 1'2300 Virginia Avenue I Fort Pierce,FL 34982 (772)462—2741 (772)462-1428 tO (772)462-1707 (B.'www.stlucieco.gov June 25, 2021 Darren Guettler, P.E. Maverick Boat Company, Phase 2 Offsite Roadway Turn Lane Improvements 7. The Developer/Contractor shall provide a copy of an active FDEP NOI at the pre-construction meeting. 8. The permittee is responsible for administering the construction contract in accordance with this permit. If the permittee fails to comply with any part of this permit or any other permit issued for this project by any regulatory authority, the County may at its sole discretion, cause to cease construction activities on the site until said permit condition is complied with. A Cease and Desist Order will be issued by the County Administrator or his designee, and served in an appropriate manner to the permittee or the permittee's agent. Under no circumstances shall work proceed when a Cease and Desist Order has been issued until said Order has been withdrawn in writing by the County. If a Cease and Desist Order is issued, the County, at its sole discretion, may take other action against the permittee and the permittee's agent(s) for the project. 9. Activities approved by this permit shall be conducted in a manner which does not cause pollution or allow pollution to exit the site. The permittee is solely responsible for preventing pollution caused by dewatering water and/or stormwater runoff from the construction site or work area. In addition to taking its own actions and remedies against the permittee for a permit violation, the County may report each violation to the South Florida Water Management District, Florida Department of Environmental Protection, Water Control District (or other Florida Statute Chapter 298 Drainage District, as appropriate), County Code Enforcement, and other pertinent regulatory or enforcement agencies. No construction work shall begin until the pollution control and treatment system have been constructed in accordance with approved permits and plans. 10. A copy of the Stormwater Pollution Prevention Plan (SWPPP) must be available on-site during construction. Any necessary change to the SWPPP shall be agreed upon with the County prior to implementing such change. 11. An `Illicit Discharge Sign' shall be obtained, installed, and remain posted continuously during construction activities. The sign may be obtained from the County Public Works Department at the pre- construction meeting or by separate arrangements. 12. An As-Built survey is required along the EOR's certification upon request for a final inspection of the site and access improvements. A published benchmark utilized for site elevations shall be referenced for use by other parties, including but not limited to the County. This permit shall expire as conditioned by the Development Order. Please do not hesitate to contact me at (772) 462-1491 if you have any questions. Sincerely, David A. Hays, P , CFM cc: Patrick Dayan, PE Benjamin Balcer Kori Benton, AICP Robert Krip Jennifer McGee, PWS Lydia Galbraith 2