HomeMy WebLinkAbout025-220050_D-111 DEMOLITION NOTES DEMOLITION LEGEND L N n "
N
m -o.o CO 6
1. DO NOT CONSIDER DEMOLITION NOTES TO BE ALL INCLUSIVE. IT IS THE CONTRACTOR'S 7. ALL DEMOLITION WORK SHALL BE PERFORMED IN ACCORDANCE WITH ALL APPLICABLE LOCAL 12. CONTRACTOR SHALL PROVIDE ALL NECESSARY PROTECTION TO PORTIONS OF THE BUILDING TO 18. CONTRACTOR SHALL SUBMIT WASTE REMOVAL PLAN, WHICH SHALL INCLUDE LOCATION PLAN OF SYMBOL DESCRIPTION m @ 2 o p
RESPONSIBILITY TO INSPECT AND ASSESS THE SPACE AND TO FULFILL THE INTENT OF THE WORK ORDINANCES AND BUILDING CODES. REMAIN IN THE COMPLETED PROJECT. ALL DEBRIS DUMPSTERS AND SHALL BE GOVERNED BY LOCAL JURISDICTION AND BUILDING _ ° Q
INDICATED BY THE CONTRACT DOCUMENTS. BRING ALL DEVIATIONS FROM THE CONTRACT DOCUMENTS OPERATIONS. o F
NECESSITATED BY FIELD CONDITIONS TO THE ATTENTION OF THE ARCHITECT. 8. REMOVE AND DISPOSE OF ALL STRUCTURE AND ITEMS AS INDICATED. DEMOLISHED AND REMOVED 13. NOTIFY THE ARCHITECT IF UNDOCUMENTED STRUCTURAL MEMBERS ARE UNCOVERED DURING THE EXISTING METAL BUILDING SYSTEM/CMU KNEE g
ITEMS SHALL BE DISCARDED. TRANSPORT DEMOLISHED MATERIALS OFF OF THE OWNERS PROPERTY COURSE OF DEMOLITION. KEEP THE ARCHITECT NOTIFIED OF THE PROGRESS OF DEMOLITION. 19. CONTRACTOR SHALL COORDINATE WITH THE PROPERTY OWNER FOR ALL SYSTEMS AND UTILITIES WALL/ GLAZING SYSTEM TO REMAIN
2. CUTTING AND REMOVAL INDICATED ON THE DRAWINGS ARE GENERAL INDICATIONS ONLY AND DO AND LEGALLY DISPOSE OF THEM. SHUT-OFF REQUIREMENTS WITH BUILDING OPERATIONS. m
NOT NECESSARILY SHOW THE FULL EXTENT OF CUTTING AND REMOVAL WHICH MAY BE REQUIRED BY 14. PRIOR TO THE START OF DEMOLITION AND EXCAVATION WORK, THE CONTRACTOR SHALL CALL 48 N=_p m
THE JOB CONDITIONS. 9. THE CONTRACTOR SHALL SUPPLY AND COORDINATE WITH PROPERTY OWNER FOR LOCATION OF HOURS BEFORE DIGGING; 1-800-432-4770 - "Sunshine 811" TO LOCATE ALL EXISTING UTILITY LINES. ANY 20. PEDESTRIAN PROTECTION:THE WORK OF DEMOLISHING ANY BUILDING SHALL NOT BE COMMENCED °-
GARBAGE DUMPSTERS PRIOR TO COMMENCEMENT OF DEMOLITION. DISRUPTION OF UTILITY SERVICES CAUSED BY FAILURE OF PRIOR NOTIFICATION OF UTILITY COMPANIES UNTIL PEDESTRIAN PROTECTION IS IN PLACE AND APPROVED BY LOCAL JURISDICTION AS GOVERNED BY
EXISTING INTERIOR FRAMED PARTITION TO REMAIN 3 " w Q
s o y U
3. CONTRACTOR SHALL VERIFY AND ESTABLISH EXISTING CONDITIONS AND DIMENSIONS BEFORE SHALL BE THE SOLE RESPONSIBILITY OF THE CONTRACTOR. AND ALL COSTS ASSOCIATED WITH PROPER THE AUTHORITY HAVING JURISDICTION.
PROCEEDING WITH ANY PORTION OF THE WORK. 10. CONTRACTOR IS RESPONSIBLE FOR AND WILL HAVE CONTROL OF DEMOLITION MEANS, METHODS, REPAIR AND RESTORATION OF DAMAGED UTILITY SERVICES SHALL BE BORNE BY THE CONTRACTOR. ` o
U
m N
AND TECHNIQUES. SEQUENCES AND PROCEDURES. THE CONTRACTOR SHALL PROVIDE FOR THE 21. WATER ACCUMULATION: CONTRACTOR SHALL MAKE PROVISIONS TO PREVENT THE ACCUMULATION =
4. CONTRACTOR SHALL VERIFY LOCATIONS AND EXTENT OF STRUCTURE AND ITEMS TO BE SAFETY PRECAUTIONS AND PROGRAMS IN CONNECTION WITH THE WORK. THE ARCHITECT WILL NOT BE 15. WHERE ELECTRICAL WIRES ARE EXPOSED, CONTRACTOR SHALL CAP ENDS OF CUT WIRES TO OF WATER AND/OR DAMAGE TO ANY PROPERTY OR FOUNDATIONS ON THE PREMISES OR ANY ADJOINING EXISTING CONSTRUCTION, EQUIPMENT OR a @ o U N M 4 6 c6 � o6
FIXTURES TO DEMOLISHED AND REMOVED. RESPONSIBLE FOR THE CONTRACTORS FAILURE TO CARRY OUT THE WORK IN ACCORDANCE WITH THE PROTECT AGAINST ELECTRIC SHOCK. PROPERTY. BE DEMOLISHED. REMOVE EXISTING z O
CONTRACT DOCUMENTS. PARTITONS/CONSTRUCTION, PATCH FLOOR AND
WALL SURFACES TO MATCH ADJACENT SURFACES O
5. EXTENT OF DEMOLITION AND REMOVAL WORK IS SHOWN ON DRAWINGS AND INCLUDES, BUT IS NOT 16. REMOVE PROJECTIONS, HANGERS, BOLTS, NAILS, ETC. FROM EXISTING SURFACES. PATCH ALL 22. IT IS THE CONTRACTOR'S RESPONSIBILITY TO KEEP THE JOBSITE CLEAN AND CLEAR OF DEBRIS OR PREPARE TO RECEIVE NEW FINISHES
NECESSARILY LIMITED TO THE FOLLOWING; EXISTING INTERIOR & EXTERIOR FINISHES, INTERIOR 11. THE CONTRACTOR SHALL VISIT THE PROJECT SITE PRIOR TO DEMOLITION AND/OR CONTRACT HOLES TO MATCH THE ADJACENT SURFACES TO REMAIN. DURING DEMOLITION. UPON COMPLETION OF THE WORK THE CONTRACTOR SHALL ENSURE ~
U
PARTITIONS, DOORS, FRAMES, CEILING SYSTEMS, MECHANICAL, ELECTRICAL AND PLUMBING SYSTEMS, NEGOTIATIONS AND SHALL VERIFY EXISTING CONDITIONS WITH THE DEMOLITION DOCUMENTS. THAT THE JOB SITE HAS BEEN CLEANED TO THE OWNER'S SATISFACTION, PRIOR TO THE
OD
STRUCTURAL WALLS, BEAMS & COLUMNS, ROOFING, WATERPROOFING, DOORS AND WINDOWS. DISCREPANCIES BETWEEN DEMOLITION DOCUMENTS (AND THEIR INTENT) SHALL BE BROUGHT TO THE 17. CONTRACTOR SHALL SUBMIT SCHEDULE OF OPERATIONS, PHASING PLAN & SCHEDULE AND ACTION CONTRACTOR VACATING THE SITE.
ARCHITECT'S ATTENTION FOR CLARIFICATION. BIDS SHALL NOT BE SUBMITTED OR CONTRACTS PLAN FOR OWNERS AND ARCHITECTS APPROVAL. SCHEDULE AND ACTION PLAN SHALL INCLUDE ARCH. NOTE: o O
J o dQ
6. CONTRACTOR SHALL OBTAIN ALL PERMITS REQUIRED BY LOCAL AUTHORITIES HAVING NEGOTIATED BY THE CONTRACTOR PRIOR TO CLARIFICATION OF THE INTENT OF THE DEMOLITION PHASING, HOURS OF OPERATION, STAGING AREA AND USE OF UTILITY SERVICES. HOURS OF OPERATION 23. UTILITY CONNECTIONS: UTILITY SERVICE CONNECTIONS SHALL BE DISCONTINUED AND CAPPED IN DIMENSIONS SHOWN ARE NOMINAL AND FOR GENERAL REFERENCE - CRITICAL L Q
JURISDICTION. DOCUMENTS WHERE SUCH INTENT IS IN DOUBT. SHALL BE GOVERNED BY LOCAL JURISDICTION AND OWNER'S CONSENT. ACCORDANCE WITH APPROVED RULES AND REGULATIONS PER THE REQUIREMENTS OF THE AUTHORITY DIMENSIONS TO BE FIELD VERIFIED WITH APPROVED MANUFACTURER z r2 Q o
HAVING JURISDICTION. SPECIFICATIONS PRIOR TO DEMOLITION OF PROJECT COMPONENTS O
FIRE PROTECTION SYSTEM NOTES o
NOTE:
EXISTING FIRE SPRINKLER SYSTEM TO REMAIN IN SERVICE THROUGHOUT DEMOLITION &CONSTRUCTION
PHASES-GC TO TAKE APPROPRIATE MEASURES TO ENSURE CONTINUITY OF SERVICE FOR EXISTING w
FIRE PROTECTION SYSTEMS. U)
J
NEW FIRE RISER TO BE INSTALLED TO EXTERIOR WALL OF BUILDING ADDITION AND CONNECTED TO Q
EXISTING FIRE SUPPLY LINE APPROXIMATELY 5-0" OUTSIDE OF BUILDING ENVELOPE. SPRINKLER
SYSTEM AND FIRE RISER DESIGN PER FIRE PROTECTION /SPRINKLER DRAWINGS AND SPECIFICATIONS
75
w
EXISTING ROLL-UP DOORS AND D-2 EXISTING ROLL-UP DOORS AND ~ 0
EXTERIOR DOORS INDICATED TO BE EXTERIOR DOORS INDICATED TO BE
REMOVED AND STORED. COORDINATE REMOVED AND STORED. COORDINATE O CO _
STORAGE WITH OWNERS AND GC. STORAGE WITH OWNERS AND GC. 0') CO
850'-0" W �
� o
�
w
m N
O z LL
Cv o
ti o m
o
r O
1 v
75
N
w
O
w cn
o �— — CONCRETE Q
® m¢m¢ ®l® ® ® ®ice — — RECEIVING
::Y7
- -
AREA Digitally signed by
Brent Wood
CONCRETE Brent DN:cn=Brent Wood,
PHASE I EXISTING BUILDING : o=Brent A.Wood
RECEIVING 850'X 125 MANUFACTURING BUILDING I I Architecture, LLC,ou,
o AREA ±106,250 SQ. FT. J J
zo a m m m m m . ® m a m m m m m m m a m a m m a m
Wo
O email=brent@bawoo
N N N
-- — — — — — arc .com,c=US
Date:2021.05.07
di di 9 b9h
_ _ 15:16:03-04'00'
So EL
CL
o O
N
a 0El0(D❑ — — — — — — — U
COVERED PATIOco
"y " COVERED PATIO ``'
J
U L LL
O 'L U
a ¢ x m ¢ a x m a ¢ m ¢ . m ¢ a . m a m a x a m m . _ i
> O N
O O
N O
co LL
C
N
U
OVERALL DEMOLITION PLAN 0
SCALE: 1/32" = V-0" D-1.11 c:
BUILDING ADDITION EXISTING BUILDING
DASHED LINES INDICATE NEW WORK STRUCTURE NORTH X
REMOVE 24 GAUGE STANDING SEAM ROOF PANELS w
_ - TO FACE OF VERTICAL STRUCTURE AND PREPARE
TO RECEIVE NEW STRUCTURE AND ROOF
C6
i
Q
REMOVE METAL END CAP FASCIA AND PREPARE
FOR NEW ROOF AND STRUCTURE o
a--m
co
O CO
REMOVE NECESSARY WALL SHEATHING FOR NEW o EXISTING STEEL BUILDING m
ROOF PANELS AND STRUCTURE. APPROVED BUILDING CO M
STRUCTURE TO REMAIN U a)
MANUFACTURER'S ENGINEERED SHOP DRAWINGS ❑
'� J
E > U
V 5 Ln
O G � LL
O
DASHED LINES INDICATE NEW WORK
O
O
EXISTING BUILDING WALL PANELS/ INSULATION
❑ TO REMAIN TO GREATEST EXTENT POSSIBLE
O
EXISTING STEEL BUILDING
❑ ❑ STRUCTURE TO REMAIN
REMOVE BOTTOM PORTION OF EXISTING METAL ❑ ❑
WALL PANEL SYSTEM AND CONTINUOUS STEEL ❑
CLOSURE STRIP UP TO FINISH FLOOR LEVEL
AND PREPARE EDGE OF FOUNDATION TO z
RECEIVE NEW FLOOR SLAB AND FOUNDATION O J
d
y � LL
\. �C z
CONCRETE FOUNDATIONS AND
DASHED LINES INDICATE NEW WORK ❑�
'� O
CONNECTIONS PER STRUCTURAL
o ENGINEERING DRAWINGS TO REMAIN
❑ ❑O ..❑� L� ` c4 � O
o Y a
` y ti 0
BUILDING ADDITION EXISTING BUILDING
STRUCTURE
ENLARGED DETAIL AT EXISTINGLO
FOUNDATION AND EXISTING FOUNDATION CD CD 0
N °
2 N �j
SCALE: 3/4" = V-0" D-1.11 o
E Q �L
D Z N
Z C6
N
O O
O p N
Cn aw@