Loading...
HomeMy WebLinkAboutLETTER SCOPE OF WORKr�clum 3101 AVIATION BLVD SUITE H Vero Beach FL 32960 License CCC1331308 License CGC 060933 Date: 8/2f2 1 Estimate # 19 8 RICHARD SARTA 198 ROSEWOOD DR FORT PIERCE FL, Hello Richard, TEL:772-777 8777 Email; 2h,1`5f Tel: 772 231 2542 It was nice speaking with you earlier today, I really feel I can meet your budget and also give you the outstanding service we are known for, I have obtained measurements of your roof via satellite measurement services we work with, attached are our most popular roofing options that we install the most of these estimates are based on your home square footage, slope and levels (stories). as with many construction products there are many more options we would be happy to quote, once you have looked these over and narrowed in on an option of interest, please let me know and I will send a more formal proposal for you to consider based on your situation. It is our pleasure to serve you as efficiently and professionally as we would expect someone to treat our own family members. Yours Truly l ed ` ❑avid Mixon r 3-- Edificium Construction EDIFICIUM CONSTRUCTION EMAIL: EDIFICIUMROOFING(7GMAIL.COM TEL: 772 2312542 WEB; WWW.EDIFICIUMROOFING.COM NE D r`"�" I C I U M SHINGLES: 130 MPH 30 YEAR LIMITED WARRANTY SCOPE OF WORK: Remove existing roof system on the primary house at the above address and dispose of the same. We are assuming that there is one layer of roofing materials, and one layer of 30# felt paper to remove. If the roof is different from this additional charges to remove the additional material will be added Nail off plywood to existing code If there is any rotted plywood it will be replaced at a rate of ($85.00 per sheet) Any other needed repairs on the SOFFIT, FASCIA and SUB FASCIA will be made at $65 per hour/ per man plus material cost All materials will be installed per Florida Building Code 1. Install 1 layer of FL Approved SWR Weatherlock G or similar underlayment 2. Install new 3x3 Galvalume drip edge nailed C 4" oc 3. Install starter shingles on roof eves 4. Install Owens Corning Duration or similar shingles with 6 nails per shingle 5. Install Hip and ridge shingles 6. Remove and replace existing ridge vent with Omni or Ventsure. 7. Install new lead boots to vent stacks $_ Install new galvanized Goose Neck roof vents. EDIFICIUM CONSTRUCTION EMAIL: EDIFICIUMROOFINGC@GMAIL.COM TEL: 772 2312542 WEB: WWW.EDIFICIUMROOFING.COM EDIFICIUM CONSTRUCTION will procure all needed permits GUTTERS EDIFICIUM CONSTRUCTION will remove all gutters around the building and discard them they cannot be re installed If new gutters are wanted it will be the owner's responsibility to install new gutters. In the event that the owner wants to leave the gutters in place, please be aware that there is a possibility that the gutters will get damaged, if that happens EDIFICIUM will not be responsible for the loss EDIFICIUM warranties that this Shingle roof will not leak for 10 years under normal conditions. EDIFICIUM will repair any leaf in this time period Any hurricane force winds void this warranty Please note although great care will be taken to protect all plants and grass from any damage some minor damage may occur. Grass, in the path around the house will be walked on multiple times daily. While this will cause some stress to the grass EDIFICIUM can not be responsible for replacing any sod Plants around the house will be covered by a tarp during the removal process and the weight of this may cause some damage to foliage. Because we take great care to avoid this EDIFICIUM will not be responsible for damaged plants. Metal roofs can reveal previously unnoticeable deficiencies in a roof surface These can be seen as but not limited to humps ripples and waviness If these are present a metal roof can make there stand out Please examine your roof surface for any of these and let us know if you would like to hire a general contractor to fix these areas before we start EDIFICIUM proposes to furnish labor and mate,` Is hor t ab e specs for the sum of- $10 700 Date of acceptance: % ignatur Payment: 30% deposit 30% when underlayment is installed, balance when job is complete. Acceptance of proposal, and the terms on the reverse side are hereby accepted OIR LLC is authorized to do the work specified Prices good for 15 days from date of proposal. EDIFICIUM CONSTRUCTION EMAIL: EDIFICIUMR00FING@GMAIL.00M TEL: 772 2312542 WEB: WWW.EDIFICIUMROOFING.COM