Loading...
HomeMy WebLinkAboutCreekside Lot 73 Frame All (2).pdfMJI ENGINEERING SGIEkCE& Inspect Project: Address: Check one: Regular inspection: D Reinspection /,,f- RQSPECTION RESULTS iii No. o� D_/J Q / 2 / Date of Initial Inspection: F+ Inspection Type Requested (check): Slab Rock Final ELECTRICAL Underground Floor Rough -In Wall Rough -in Ceiling Rough -In Panel/Feeder Service/Ground Appliance/Equipm� Lighting Protection Re -inspection Final Electrical MECHANICAL �ieam Final Other Inspection Type:/ Area Inspected/Code: 6 b L / 4 anp I Inspection Results:XAP-Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved D Not Ready Con ditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspectors Name: Final ❑ OA-Disallowed \� OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teampfa.com