HomeMy WebLinkAboutCreekside Lot 73 Frame All (2).pdfMJI
ENGINEERING SGIEkCE&
Inspect
Project:
Address:
Check one:
Regular inspection:
D Reinspection
/,,f-
RQSPECTION RESULTS
iii No. o� D_/J Q / 2 /
Date of Initial Inspection: F+
Inspection Type Requested (check):
Slab
Rock
Final
ELECTRICAL
Underground
Floor Rough -In
Wall Rough -in
Ceiling Rough -In
Panel/Feeder
Service/Ground
Appliance/Equipm�
Lighting Protection
Re -inspection
Final Electrical
MECHANICAL
�ieam
Final
Other Inspection Type:/
Area Inspected/Code: 6 b L
/
4 anp I
Inspection Results:XAP-Approved ❑ AE-Approved with Exceptions
❑ DP -Disapproved D Not Ready
Con ditions/Comments:
1.
2.
3.
4.
5.
6.
7.
Inspectors Name:
Final
❑ OA-Disallowed
\� OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax)
www.teampfa.com