Loading...
HomeMy WebLinkAboutCreekside Lot 75 Frame All.pdfENGINEERIFIG SCIEItCER Inspection Date: Project:. Address: Check one: Regular Inspection: _S7_a INSPECTION RESULTS Permit No. ,1 %g F. _MrMfl ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -In Slab Floor Rough -In Rough -In Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation Sheet Rock Appliance/Equipment Fixtures Wall & Ceiling Roofing Lighting Protection Equipment Equipment 4 Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechanical Other Inspection Type: Area Inspected/Code:l/i3l�b Inspection Results:IPW-Approved ❑ AE-Approved with Exceptions ❑ DA-Disallowed ❑ DP -Disapproved O Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspectors Name: NQ . c L224 Lic.fi: B y 2 5-75 OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924-3580 (fax) www.teamgfa.com