HomeMy WebLinkAboutElectrical LayoutST. LUCIE
PLAN REVIEW
RECEIVED BLDG
DA
JUL 0 2 2021 DATE:����''
3eaker box fitted with 20amp � DATE:
braker for the gate St. Lucie County PLUM:
Permitting
Operator Liftmaster CSLIE —
110v 5amp 24v motor. DATE:
Total cable rum approximately 160ft
cable #12 THHN
1/2in Steel conduit run at high level
from Breaker box to outside of building
underground 1/2in plastic conduct
2ft underground
Approximately 20ft
Gate Operator
ECS SECURITY INC
@seamorada Brewing Co
Electrical iav®ut
E=C13003866 I Date 07/02/2021