HomeMy WebLinkAboutDuct leakage 7.26.21 (2)Envelope Leakage Test Report
ar (Blower Door Test)
R402.4.1.2 Compliance
Permit #
Job Information
Builder: DR HORTON
Community: re Lot:
Address: 3 v
Unit:
City: iL
State: FL Zip `N'
Air Leakage Test Results
Passing results must be 7 ACH(50) or less
x 60 =
_ C .� Method for calculating building volume:
ly3xi
CFM(50)
Building Volume ACH(50) O Retrieved from architectural plans
( ) Code software calculated
KPASS
FAIL Field and calculated
O measured
® When ACH(50)
is less than 3, Mechanical ventilation installation must be verified by building department.
Certification of Test Results
exceeding 7 air changes
R4uZA.7.Z J esnng. -- --
per hour in Climate Zones 1 and 2, 3 air changes per hour in Climate Zones 3 through B. Testing shall be conducted with a blower door at a
pressure of 0.2 Inches w.g. (50 Pascals). Testing shall be conducted by wither individuals as defined in Section 553.99315) or (7), F.S. or
individuals licensed as set forth in Section 489.105(3)(f), (g), or (i) or an approved third party. A written report of the results of the test
shall be signed by the party conducting the test and provided to the code official. Testing shall be performed at any time after creation of
Testing Company
Company Name: SUN SEAL LLC Phone: 321-412-0035
I hereby verify that the above duct leakage testing results are in accordance with the Florida Building Code requirements with the selected
(compliance path as stated above, either the Prescriptive Method or Performance Method.
Date of Test: a� 1 -� II .
Signature of Tester: V I P,
Printed Name of Tester: RAULY BAGGETT
License/Certification # - 5066185 Issuing Authority