HomeMy WebLinkAboutEngineering (2) M L Engineering Inc.
2030—371 Avenue
Vero Beach,Florida 32960
Phone: (772)569-1257
Fax:(772)569-4041
May 6,2021
St. Lucie County Building Department
Planning& Development Services
2300 Virginia Avenue RECEIVED
Ft. Pierce, Florida 34982
MAY 11 1011
RE: Ocean Harbor North Condominiums—Bldg A Concrete Repairs
Units 214, 314, 514, 614& 714 Permitting Department
5155 North Highway A I A St. Lucie County
Ft. Pierce, FL 34949
Engineer's Project No.:20-249
St. Lucie County Bldg. Permit No. 2012-0537
To Whom It May Concern:
This letter shall serve as certification that to the best of our knowledge,the structural repairs have been
constructed in substantial conformance with the design documents and specifications and as duly noted in
our field reports.
Threshold Inspections for the above referenced project were performed from January 19,2021 through
May 6,2021. Copies of all field reports were distributed to the Client, Engineer of Record, Contractor
and to the St. Lucie County Building Department.
If you have any questions, please call our office.
Respectfully, �,S11111„2#
'
1
'
N�HOIV �•r• •,
i V
• ~• 15 •
•c
Michael
Consulting Engineer
Threshold Inspector
Cc: Gene Ross—Elliott Merrill Community Management(Client) FILE COPY
Bob Stark—Structure-Con(Contractor)
M L Engineering Inc. Project No.20-249 Report No. 1
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmnt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 37t'Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone: (772)569-1257 File
Fax: (772)569-4041
www.miengineeringinc.com
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS—BLDG.A CONCRETE REPAIRS
5155 N.HWY.AIA,FT.PIERCE,FL 34949
SLC BUILDING PERMIT NUMBER:2012-0537
PROJECT NAME: Ocean Harbor N.Condos—Bldg.A DATE: January 19,2021
Concrete Repairs
CLIENT: Elliott Merrill Community Management LOCATION: Ft.Pierce,FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr.Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Units 314&714—Concrete demo/pre pour inspection of the reinforced concrete balcony.
OBSERVATIONS:
• The loose and deteriorated concrete along the balcony edge has been removed which was the entire length of
the balcony,approximately 12 feet.
• The contractor continued to chip until clean reinforcing was found which was approximately 18"from the slab
edge.
• The bars appear to be in serviceable condition and will require power tool cleaning and coating with the
specified corrosion inhibitor.
• Post shores placed as indicated in plan and form boards are in place.
• The repairs are in accordance with design documents and approved for concrete pour.
00,
r • •
G • * • 1
Miclt•se1.�u��P.F Todd Rhoten,Inspector
L
�'•:cFSS 1
Pagel of 2
M L Engineering Inc. Project No. 20-249 Report No. I
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmnt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 371 Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone: (772)569-1257 File
Fax: (772)569-4041
www.mlengineeringinc.com
1 Pic 1
Unit 314(214 ceiling)
Post shores and form board in place.
}
;4
1
Pic 2
+ Unit 314
Balcony edge repair area.
M
7
Pic 3
f. Unit 714
r.
Balcony edge repair area.
Page 2 of 2
M L Engineering Inc. Project No. 20-249 Report No. 2
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 371h Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone:(772)569-1257 File
Fax:(772)569-4041
www.mlen ing eerineinc.com
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS—BLDG.A CONCRETE REPAIRS
5155 N.HWY.AIA,FT.PIERCE,FL 34949
SLC BUILDING PERMIT NUMBER:2012-0537
PROJECT NAME: Ocean Harbor N.Condos—Bldg.A DATE: January 29,2021
Concrete Repairs
CLIENT: Elliott Merrill Community Management LOCATION: Ft.Pierce,FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr.Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Cold&breezy
WORK INSPECTED:
Units 214,514&614—Concrete demo/pre pour inspection.
Units 314&714—Post pour.
OBSERVATIONS:
Unit 214
• Hurricane shutter tracks have been removed from the top and bottom of the slab.
• The screen enclosure was removed at Unit 114 below.
• Balcony edge demo is complete and the corroded reinforcing has been exposed.
• The bars appear to be in serviceable condition and will require power tool cleaning and coating with the
specified corrosion inhibitor.
• The area of edge repair was limited to the south comer only,approximately 3 square feet.
Unit 314
• Waterproofing and decorative coating has been applied to the repaired areas.
• Stucco at the repaired areas has been applied to match existing and painted with a primer.
• Hurricane shutter tracks have been re-installed and the top and bottom of the slab by the shutter contractor.
Unit 514
• The existing screen enclosure has been removed.
• Hurricane shutters did not require removal.
• The balcony edge demo is complete and the corroded reinforcing has been exposed.
• The bars appear to be in serviceable condition and will require power tool cleaning and coating with the
specified corrosion inhibitor.
• Area of repair was limited to approximately 2 square feet at the edge.
Unit 614
• Hurricane shutter tracks have been removed from top and bottom of the slab edge.
• The balcony edge demo is complete and the corroded reinforcing has been exposed.
• The bars appear to be in serviceable condition and will require power tool cleaning and coating with the
specified corrosion inhibitor.
• Area of edge repair was the entire length of balcony,approximately 12 feet.
Page 1 of 4
M L Engineering Inc. Project No. 20-249 Report No. 2
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 37t"Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone:(772)569-1257 File
Fax:(772)569-4041
www.mlenp-ineerinizinc.com
Unit 714
• Waterproofing and decorative coating have been applied to the entire balcony surface.
• The stucco at the repair areas has been applied to match existing and painted with a primer.
• The shutter contractor is in the progress of re-installing the hurricane shutter tracks at the top and bottom of the
slab.
The repairs are in accordance with design documents and approved for concrete pour.
,111111111j.
.�`'NTNOAI y''%
� " ••• SF •••G`, •,i
s
Micl e�ug�P.F� R �� — Todd Rhoten, Inspector
10
.0 L O • !G •
off 11111j1
Page 2 of 4
M L Engineering Inc. Project No. 20-249 Report No. 2
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 371 Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone:(772)569-1257 File
Fax:(772)569-4041
www.miengineeringinc.co
!� Pic 1
'•, Units 114-714
East elevation
r `
Jffii AM
Plc 2
Unit 214
s Balcony edge repair area
Pic 3
Unit 614
Balcony edge repair area,full length of balcony
? 1
Page 3 of 4
M L Engineering Inc. Project No.20-249 Report No. 2
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 37 h Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone:(772)569-1257 File
Fax:(772)569-4041
www.mlen ing eerin ing c.com
Pic 4
Unit 614
2"minimum edge clearance
a.r
Pic 4
Unit 714
Waterproofing&top coat
Page 4 of 4
M L Engineering Inc. Project No.20-249 Report No.3
Consulting Engineers Project Manager: Mr.Gene Ross—Elliott Merrill Community Mgmt.
Threshold Inspector Building Official: St.Lucie County Bldg.Dept.
2030 371 Avenue Contractor: Mr.Robert Stark—Structure-Con
Vero Beach,Florida 32960 Mr.Khris McConnel—Structure Con
Phone:(772)569-1257 File
Fax:(772)569-4041
www.miengineeringinc.com
THRESHOLD INSPECTION REPORT
OCEAN HARBOR NORTH CONDOMINIUMS—BLDG.A CONCRETE REPAIRS
5155 N.HWY.AIA,FT.PIERCE,FL 34949
SLC BUILDING PERMIT NUMBER:2012-0537
PROJECT NAME: Ocean Harbor N.Condos—Bldg.A DATE: May 6,2021
Concrete Repairs
CLIENT: Elliott Merrill Community Management LOCATION: Ft.Pierce,FL
CONTRACTOR: Structure-Con PROJECT MGR: Mr.Khris McConnell
INSPECTED BY: Todd Rhoten WEATHER: Sunny
WORK INSPECTED:
Units 214,314,514,614&714—Final Inspection
OBSERVATIONS:
• The repaired areas have new waterproofing,top coat and paint to match surrounding areas.
• Hurricane shutters have been reinstalled along the slab edge.
• Stucco has been applied to the ceiling and slab edge at the repaired areas.
• All repairs are in accordance with-permitted design documents.
A final certification letter will follow this report.
,,i'��iY11LpyI`,
r • i/ •
r • • r
Mic}1.he tsg,P. Todd Rhoten,Inspector
Page 1 of 1