HomeMy WebLinkAboutCompaction TestANDERSEN ANDRE CONSULTING ENGINEERS, INC.
I
I
FIELD DENSITY./TEST REPORT
834 SW Swan Avenue
Port St. Lucie, Florida 34983
Phone:772-807-9191 Fax: 772-807-9192
www.aaceinc.com
PROJECT: Maverick Boat Group - Phase II Expansion
FILE NO: 21-152
Fort Pierce, St. Lucie County, Florida
REPORT NO: 10
PERMIT N6 2103-0334
REPORTED TO: R. K. Davis Construction Corp.
CC:
DATE OF TEST(S): 05/07/2021 PAGE NO:
1 OF 1
MDR
MOISTURE
DRY
PERCENT
DEPTH
TEST NO.
Floor Slab Subgrade, Grid Line 1 to 10'E of Grid Line 9
NO.
CONTENT (%)
DENSITY
COMPACTION
LOCATION
(PCF)
1
15'E of Grid Line F-1
4279
10.2
118.4
95
0 to -12" FS
2
20'E of Grid Line B-1
4279
10.7
117.9
95
0 to -12" FS
3
15'S of Grid Line D-3
4319
9.5
114.3
99
0 to -12" FS
4
40'N of Grid LineD-3
4319
1. 9.9
113.9
99
0 to -12" FS
5
15'E of Grid Line D-4
4319
10.6
112.7
97
0 to -12" FS
6
30'N of Grid Line D-6
4319
9.8
113.1
98
0 to -12" FS
7
30'S of Grid Line D-6
4319
10.4
114.2
99
0 to -12" FS
8
15'E of Grid Line D-7
4319
10.7
112.5
97
0 to -12" FS
9
40'N of Grid Line D-9
4319
10.2
114.0.
99
0 to -12" FS
10
40'S of Grid Line D-9
4319
10.5
113.1
98
0 to -12" FS
* DENOTES IN -PLACE DENSITY TEST DOES NOT MEET MINIMUM COMPACTION REQUIREMENT OF 95 PERCENT.
** RETEST INDICATED DENSITY MEETS OR EXCEEDS MIN. DENSITY REQUIREMENTS PER SPECIFICATIONS
FIELD TEST: j^ ASTM D-2937 17 ASTM D-6938 ( ASTM D-2167
j� ASTM D-1556
TECHNICIAN: BS REMARKS:
LABORATORY MOISTURE -DENSITY RELATIONSHIP
F =SOIL DIRECTLY BELOW FOOTING FS =FLOOR SLAB SUBGRADE
OPTIMUM GA = SOIL IN GENERAL COMPACTED AREA PAV= SOIL BELOW STABILIZED SECTION
MDR NO.
ASTM MAX. MOISTURE PSSG = STABILIZED SUBGRADE
PB = PAVEMENT BASE
TEST METHOD DENSITY CONTENT RS = ROADWAY
NSSG = NON STABILIZED SUBGRADE
4275
D1657 124.5 PCF 10.5 % SBP = SOIL BELOW PAVEMENT
TOP = TOP OF PIPE
4319
D1557 115.6 PCF 10.7 % BOP = BOTTOM OF PIPE
BOS = BOTTOM OF STRUCTURE
OTHER:
Peter G. Andersen, P.E.
FIa..Reg. No. 57956
AS A MUTUAL PROTECTION TO CLIENTS, THE PUBLIC AND OURSELVES, ALL REPORTS ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS AND AUTHORIZATION
FOR PUBLICATION OF STATEMENTS, CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL.
ANDERSEN ANDRE CONSULTING ENGINEERS, INC.
834 SW Swan Avenue
Port St. Lucie, Florida 34983
Phone: 772-807-9191 Fax: 772-807-9192
www.aaceinc.com
FIELD DENSITY TEST REPORT
PROJECT: Maverick Boat Group - Phase II Expansion
FILE NO: 21-152
Fort Pierce, St. Lucie County, Florida
REPORT NO: 14
REPORTED TO: R. K. Davis Construction Corp.
PERMIT NO: 2103-0334
�a_.._--_._�
CC:
DATE OF TEST(S): 05110/2021 PAGE NO:
1 OF 1
TEST NO.
Floor Slab Subgrade, 10'E of Grid Line 9 to 10'E of Grid Line 17
MDR
MOISTURE
DRY
DENSITY
PERCENT
DEPTH
N0.
CONTENT(/o)
COMPACTION
LOCATION
(PCF)
1
10'W of D-10
4319
7.8
112.5
97
0 to -12" FS
2
40'N of D-10
4319
8.5
1.16.7
100
0 to -12" FS
3
40'S of D-10
4319
7.0
112.0
97
0 to -12" FS
4
25'S of D-12
4319
7.1
114.5
99
0 to -12" FS
5
35'N of D-12
4319
6.8
113.2
98
0 to -12" FS
6
15'W of D-13
4319
7.3
110.7
96
0 to -12" FS
7
20'N of D-14
4319
8.5
114.0
99
0 to -12" FS
8
40'S of D-14
4319
7.0
113.6
98
0 to -12" FS
9
35'N of D-16
4319
7.8
114.2
99
0 to -12" FS
10
25'S of D-16
4319
7.2
112.2
97
0 to -12" FS
* DENOTES IN -PLACE DENSITY TEST DOES NOT MEET MINIMUM COMPACTION REQUIREMENT OF 95 PERCENT.
** RETEST INDICATED DENSITY MEETS OR EXCEEDS MIN. DENSITY REQUIREMENTS
PER SPECIFICATIONS
FIELD TEST: j ASTM D-2937 )✓• ASTM D-.6938 j' ASTM D-2167
r ASTM D-1556
TECHNICIAN: BS REMARKS:
LABORATORY MOISTURE -DENSITY RELATIONSHIP
F = SOIL DIRECTLY BELOW FOOTING FS = FLOOR SLAB SUBGRADE
OPTIMUM GA = SOIL IN GENERAL COMPACTED AREA PAV= SOIL BELOW STABILIZED SECTION
MDR NO. ASTM MAX. MOISTURE PSSG = STABILIZED SUBGRADE
PB = PAVEMENT BASE
TEST METHOD DENSITY
CONTENT RS = ROADWAY
NSSG = NON STABILIZED SUBGRADE
4319 D1557 115.6 PCF 10.7 % SBP = SOIL BELOW PAVEMENT
TOP = TOP OF PIPE
BOP = BOTTOM OF PIPE
BOS = BOTTOM OF STRUCTURE
OTHER:
-r
Peter G. Andersen, P.E.
Fla. Reg. No. 57956.
AS A MUTUAL PROTECTION TO CLIENTS, THE PUBLIC AND OURSELVES, ALL REPORTS ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS AND AUTHORIZATION
FOR PUBLICATION OF STATEMENTS, CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL.
ANDERSEN ANDRE CONSULTING ENGINEERS, INC.
834 SW Swan Avenue
Port St. Lucie, Florida 34983
Phone: 772-807-9191 Fax: 772-807-9192
www.aaceinc.com
FIELD DENSITY TEST REPORT
PROJECT: Maverick Boat Group - Phase II Expansion
FILE NO: 21-152
Fort Pierce, St. Lucie County, Florida
REPORT NO: 15
PERMIT NO: 2103-0334�;'
REPORTED TO: R. K. Davis Construction Corp.
CC:
DATE OF TEST(S): 0511812021 PAGE NO:
1
1 OFDRY
TEST NO.
Floor Slab Subgrade, 10'E of Grid Line 17 to 13'E of Grid Line 26
MDR
MOISTURE
DENSITY
PERCENT
DEPTH
NO.
CONTENT(/o)
COMPACTION
LOCATION
(PCF)
1
30'S of D-18
4319
8.8
114.3
99
0 to -12" FS
2
25'N of D-19
4319
7.0
114.0
99
0 to -12" FS
3
20'S & 15'E of D-20
4319
8.5
116.2
100 +
0 to -12" FS
4
25'N of D-20
4319
6.2
113.8
98
0 to -12" FS
5
15'E of D-21
4319
6.6
112.7
97
0 to -12" FS
6
30'N of D-22
4319
6.1
114.4
99
0 to -12" FS
7
30'S & 10'E of D=23
4319
7.9
114.9
99
0 to -12" FS
8
15'E of D-24
4319
6.7
112.8
98
0 to -12" FS
9
30'N of D-25
4319
8.1
113.1
98
0 to -12" FS
10
20'S & 13'E of D-26 (thickened edge footing)
4319
7.6
113.5
98
0 to -12" F
* DENOTES IN -PLACE DENSITY TEST DOES NOT MEET MINIMUM COMPACTION REQUIREMENT OF 95 PERCENT.
** RETEST INDICATED DENSITY MEETS OR EXCEEDS MIN. DENSITY REQUIREMENTS
PER SPECIFICATIONS
FIELD TEST: F' ASTM D-2937 r ASTM D-6938 �' ASTM D-2167
ASTM D-1556
TECHNICIAN: BS REMARKS:
LABORATORY MOISTURE -DENSITY RELATIONSHIP
F = SOIL DIRECTLY BELOW FOOTING FS = FLOOR SLAB SUBGRADE
OPTIMUM GA = SOIL IN GENERAL COMPACTED AREA PAV= SOIL BELOW STABILIZED SECTION
MDR NO.
ASTM MAX. MOISTURE PSSG = STABILIZED SUBGRADE
PB = PAVEMENT BASE
TEST METHOD DENSITY
CONTENT RS = ROADWAY
NSSG = NON STABILIZED SUBGRADE
4319
D1557 115.6 PCF 10.7 % SBP = SOIL BELOW PAVEMENT
TOP = TOP OF PIPE
BOP = BOTTOM OF PIPE
BOS = BOTTOM OF STRUCTURE
OTHER:
Peter G. Andersen, P.E.
Fla. Reg. No. 57956
AS A MUTUAL PROTECTION TO CLIENTS, THE PUBLIC AND OURSELVES, ALL REPORTS ARE SUBMITTED AS THE CONFIDENTIAL PROPERTY OF CLIENTS AND AUTHORIZATION
FOR PUBLICATION OF STATEMENTS, CONCLUSIONS OR EXTRACTS FROM OR REGARDING OUR REPORTS IS RESERVED PENDING OUR WRITTEN APPROVAL.
ANDERSEN ANDRE CONSULTING ENGINEERS, INC. AACE File No. 21-152
Geotechnical Engineering April 29, 2021
Construction Materials Testing
Environmental Consulting
R. K. Davis Construction Corp.
PO Box 186
Fort Pierce, FL 34954p,41411
Attention: Mr. Roger A. Priest
SUMMARY REPORT - HELICAL PILE INSTALLATION MONITORING
MAVERICK BOAT GROUP PHASE II EXPANSION
FORT PIERCE, ST. LUCIE COUNTY, FLORIDA
As per your request, Andersen Andre Consulting Engineers, Inc. (AACE) has completed the helical
pile installation monitoring for the above referenced project. This report describes our
observations duringthe pile installation, and summarizes our conclusions and recommendations.
Our firm has previously performed a Geotechnical Engineering Evaluation for project and
presented ourfindings and recommendations in a report dated November4, 2020 (AACE File No.
20-249).
Overall, the helical pile installation torque -to -capacity correlation was used during the pile
installation to confirm that the minimum installation torque value required for the design
capacities was reached. The empirical relationship between installation torque (ft-lb) and
ultimate pile capacity is as follows:
`moult = Kt x T
where Galt is the ultimate pile capacity (lbs), Kt is an empirical torque factor (ft-1) and T is the
installation torque (ft-lb).
The torque factor varies with soil types and pile shaft sizes and ICCES AC358 (Acceptance Criteria
for Helical Pile Systems and Devices) recognizes a number of helical pile shaft sizes and default
Kt factors for systems in compliance with the criteria included in ICCES AC358. For the 2-7/8"
square pile lead section used for this project, and considering the granular subsurface soil
conditions, a torque factor (K) of 9 was utilized.
The helical pile installation was completed in the period April 2-27, 2021 by Brownie Companies
(Brownie) with AACE representatives monitoringthe pile installation. In brief, Brownie installed
a total of 73 helical piles within the D-grid line (referencing Sheet S-1.01 of the project structural
drawings) consisting of 7-ft lead sections (2-7/8" diameter with 12" and 14" helices) with 7-ft
extensions (2-7/8" diameter, Schedule 40). The piles were installed until a minimum installation
torque of 10,000 ft-lbs was achieved resulting in a FOS for the pile capacity of 2.0 or higher.
834 Swan Avenue, Port St. Lucie, Florida 34983 Ph: 772-807-9191 Fx: 772-807-9192 www.aaceinc.com
SUMMARY REPORT - HELICAL PILE INSTALLATION MONITORING Page -2-
MAVERICK BOAT GROUP PHASE II EXPANSION
AACE FILE No. 20-152
Exceptions to this were noted in the following locations where concrete debris was encountered
and subsequently excavated/removed:
Grid line D-3: Four piles were installed within this grid line with a combined torque
capacity in excess of 20,000 ft-Ibs.
Grid line D-29: Four piles were installed within this grid line with a combined torque
capacity in excess of 20,000 ft-Ibs
Grid line D-33: Three piles were installed within this grid line with a combined torque
capacity in excess of 20,000 ft-Ibs
These exceptions were coordinated with the project Structural Engineer (Wieder Engineering,
Inc.) and the foundations at these locations were structurally redesigned accordingly.
The attached helical pile installation records summarize the installation details discussed above.
Based on our previous geotechnical engineering evaluations for this site, ourobservations during
the pile installations, and our experience from numerous similar projects, it is our opinion that
each of the installed helical piles will provide allowable compression and tension capacities in
excess of 45 kips. Further, it is our opinion that the piles installed within grid lines D-3, D-29 and
D-33 will, combined, provide a capacity in excess of 90 kips (compression and tension) per grid
line location.
We are pleased to be of assistance to you on this phase of your project. When we may be of
further service to you or should you have any questions, please contact us.
Sincerely,
ANDERSEN ANDRE CONSULTING ENGINEERS, INC.
Peter G:"Andersen,"P.E. _ David P. Andre, P.E.
Principal Engineer 4%=?fs-?y2i Principal Engineer
Fla. Reg: No: 57956 Fla. Reg. No. 53969
4fJA
Attachments: Helical Pile Installation Records (8 pages) �2i
ANDERSEN ANDRE CONSULTING ENGINEERS, INC.
WWW.AACEINC.COM
ANDERSEN ANDRE CONSULTING ENGINERS, INC.
Notes:
Torque readings typically
q g ypicall noted at start, 1/3, 2/3 and end of each extension.
834 Swan Avenue, Port St. Lucie, FL 34983 • Ph: 772.807.9191 • www.aaceinc.com • info@aaceinc.com
HELICAL PILE INSTALLATION RECORD
(Page 1 / 8)
Project: Maverick Boat Expansion Inspected By: KS
File Number: 21-152 Checked By: PGA
Client: RK Davis Construction Corp. Installation Period: 04/02/2021 - 04/27/2021
Pile Contractor. Brownie Companies Pile Design Criteria: 90K ultimate, 45K allowable (compression and tension). Target torque: 10,000 ft4bs (K=9)
Pile Manufacturer: Helical Anchors, Inc. Lead Product No: NA Extension Product No: NA
Lead Section: T, 2-7/8" OD, 12" 8 14" helices Extensions: T, 2-78" OD NOTE 1: L = Lead, E1 = Extension 1, E2 = Extension 2, etc.
Torque Indicator: CMI Torqhub 3" Hex 20K, S/N 31-623 Bracket Product No. NA NOTE 2: Product Info and Torque Indicator Calibration provided by Pile Contractor
Final Installation Torque
Approximate Final Pile Embedment
Install Date
Location
Pile No.
Pile ID
Installation Notes
Final Pile Segment and. Measured Torque (ft-lbs)
(ft-lbs)
(ft below bottom of footing excavation)
04/02/21
D-2
1
D2E
Test Pile
Extension No. 4: 8000-10100
10,100
29
04/14/21
D-5
2
D5W
Extension No. 4: 6420-9720-10100
10.100
28.6
04/14121
0-5
3
D5E
Extension No. 4: 9210, 10000
10,000
27.8
04/14/21
D-6
4
D6W
Extension No. 3: 3700-3512-8220-10010
10,010
26.2
04114/21
D-6
5
D6E
Extension No. 3: 3280-2523-7032-10100
10,100
26.5
04/15/21
0-15
6
D15E
Extensionn No. 4: 7500-9500-10050
10,050
29.5
04/15/21
D-15 ✓
7
D15W
Extension No. 4: 5150-8510-1010D1
10.100
29.6
04/15/21
D-12 V
8
D12E
Extension No. 4: 9400-10030
10.030
28.2
V
04/15/21
D-12
9
D12W
Extension No. 4: 10062
10,062
27.8
04/15121
D-11
10
D11E
Extension No. 4:8090-10000
10,000
28.8
ANDERSEN ANDRE CONSULTING ENGINERS, INC.
Notes:
Torque readings typically noted at start, 1/3, 2/3 and end of each extension.
834 Swan Avenue, Port St. Lucie, FL 34983 • Ph: 772.807.9191 • www.aaceinc.com • info@aaceinc.com
HELICAL PILE INSTALLATION RECORD
(Page 2 / 8)
Project: Maverick Boat Expansion Inspected By: KS
File Number: 21-152 Checked By: PGA
Client: RK Davis Construction Corp. Installation Period: 04/02/2021 - 04/27/2021
Pile Contractor: Brownie Companies Pile Design Criteria: 90K ultimate, 45K allowable (compression and tension). Target torque: 10,000 ft-Ibs (K=9)
Pile Manufacturer: Helical Anchors, Inc. Lead Product No: NA Extension Product No: NA
Lead Section: T, 2-7/8" OD, 12" & 14" helices Extensions: T, 2-78" OD NOTE 1: L = Lead, E1 = Extension 1, E2 = Extension 2, etc.
Torque Indicator: CMI Torqhub 3" Hex 20K, SIN 31-623 Bracket Product No. NA NOTE 2: Product Info and Torque Indicator Calibration provided by Pile Contractor
Final Installation Torque
Approximate Final Pile Embedment
Install Date
Location
Pile No.
Pile ID
Installation Notes
Final Pile Segment and Measured Torque (ft-Ibs)
(ft-Ibs)
(ft below bottom of footing excavation)
04/15/21
D-11
11
D11W
Extension No. 3: 4848-6504-7023-10100
10,100
26.7
04/15/21
D-10 V
12
D10E
Extension No. 3: 2911-5405-6141-10025
10,025
26.9
04/15/21
D-10
13
D10W
Extension No. 3: 2205-3691-6965-10070
10,070
27.3
04/15/21
- D-2
14
D2W
Extension No. 4: 8480-10028
10,028
28.2
04/15/21
i D-7
15
D7W
Extension No. 4: 5849-8500-10033
10,033
30.2
04/15/21
0-7 ✓
16
D7E
Extension No. 3: 5112-4277-6926-10019
10,019
26.0
04/15/21
D-9
17
D9E
Extension No. 3: 4468-6009-7100-10066
10,066
26.6
04/15/21
D-9
18
D9W
Extension No. 3: 3831-4333-7500-10051
10.051
26.0
- V
04/15/21
D-16
19
D16W
Extension No. 4: 5600-10005
10,005
29.2
04/15/21
D-16 V
20
D16E
Extension No. 4: 3512-5715-10061
10,061
32.2
ANDERSEN ANDRE CONSULTING ENGINERS, INC.
Notes:
Torque readings typically noted at start, 1/3, 2/3 and end of each extension.
834 Swan Avenue, Port St. Lucie, FL 34983 . Ph: 772.807.9191 . www.aaceinc.com . info@aaceinc.com
HELICAL PILE INSTALLATION RECORD
(Page 3 / 8)
Project: Maverick Boat Expansion Inspected By: KS
File Number: 21-152 Checked By: PGA
Client: RK Davis Construction Corp. Installation Period: 04/02/2021 - 04/27/2021
Pile Contractor: Brownie Companies Pile Design Criteria: 90K ultimate, 45K allowable (compression and tension). Target torque: 10,OD0 ft-Ibs (K=9)
Pile Manufacturer: Helical Anchors, Inc. Lead Product No: NA Extension Product No: NA
Lead Section: T, 2-7/8" OD, 12" & 14" helices Extensions: T, 2-78" OD NOTE 1: L = Lead, E1 = Extension 1, E2 = Extension 2, etc.
Torque Indicator: CMI Torqhub 3" Hex 20K, SIN 31-623 Bracket Product No. NA NOTE 2: Product Info and Torque Indicator Calibration provided by Pile Contractor
Final Installation Torque
Approximate Final Pile Embedment
Install Date
Location
Pile No.
Pile ID
Installation Notes
Final Pile Segment and Measured Torque (ft-Ibs)
(ft-Ibs)
(ft below bottom of footing excavation)
04/15/21
D-17 Y
21
D17W
Extension No. 4: 7300-10100
10,100
29.2
04/15/21
D-17.
22
D17E
Extension No. 4: 7400-10110
10,110
29.6
04/15/21
D-13
23
D13W
Extension No. 4: 8002-10040
10,040
28.7
04/16/21
D-13 ✓
24
D13E
Extension No. 4: 7170-8180-10080
10,080
30.1
04/16/21
D-18 Y
25
D18W
Extension No. 4: 4011-9533-10044
10.044
30.0
04/16/21
D-18, or
26
D18E
Extension No. 4: 4946-7412-10089
10,089
29.4
04/16/21
D-19
27
D19W
Extension No. 4: 6900-10037
10,037
29.6
04/16/21
D-19,
28
D19E
Extension No. 4: 5102-8770-10105
10,105
32.2
04/16/21
D-20
29
D20W
Extension No. 4: 5721-10044
10,044
29.0
✓
04/16/21
D-20
30
D20E
Extension No. 4: 4970-7737-1091
10,091
31.0
ANDERSEN ANDRE CONSULTING ENGINERS, INC.
Notes:
Torque readings typically noted at start, 1/3, 213 and end of each extension.
834 Swan Avenue, Port St. Lucie, FL 34983 • Ph: 772.807.9191 • www.aaceinc.com • info@aaceinc.com
HELICAL PILE INSTALLATION RECORD
(Page 4 / 8)
Project: Maverick Boat Expansion Inspected By: KS
File Number: 21-152 Checked By: PGA
Client: RK Davis Construction Corp. Installation Period: 04/02/2021 - 04/27/2D21
Pile Contractor: Brownie Companies Pile Design Criteria: 90K ultimate, 45K allowable (compression and tension). Target torque: 10,000 ft-Ibs (K=9)
Pile Manufacturer: Helical Anchors, Inc. Lead Product No: NA Extension Product No: NA
Lead Section: T, 2-718" OD, 12" & 14" helices Extensions: 7', 2-78" OD NOTE 1: L = Lead. E1 = Extension 1, E2 = Extension 2, etc.
Torque Indicator: CMI Torghub 3" Hex 20K, S/N 31.623 Bracket Product No. NA NOTE 2: Product Info and Torque Indicator Calibration provided by Pile Contractor
Final Installation Torque
Approximate Final Pile Embedment
Install Date
Location
Pile No.
Pile ID
Installation Notes
Final Pile Segment and Measured Torque (ft-Ibs)
(ft-Ibs)
(ft below bottom of footing excavation)
04/16/21
D-21 Y
31
D21W
Extension No. 4: 2805-2502-6193-10052
10,052
34.0
04/16/21
., D-21
32
D21E
Extension No. 4: 3690-7414-10022
10,022
31.4
04/16/21
D-22 V
33
D22W
Extension No. 4: 1050-4194-10039
10.039
32.5
04/16/21
D-22 ✓
34
D22E
Extension No. 4: 3670-3575-4097-10023
10,023
33.3
04/19/21
D-3
35
D3S
Four piles installed in D-3
Extension No. 4: 8090-10100
10,100
28.0
04/19/21
, D-3 ✓
36
03N
Four piles installed in D-3
Extension No. 6: 4840-5211-7085-6112
6,112
43.0
04/20/21
Y
D-4
37
D4W
Extension No. 4: 8690-10080
10,080
32.0
04/20/21
:D3 ,
38
D3E
Four piles installed in D-3
Extension No. 3: 3512-4180-5077
5,077
27.5
04/20/21
D-3 r
39
D3W
Four piles installed in D-3
Extension No. 3: 2580-3815-5280
5,280
28.3
✓
04/20/21
D-8
40
D8N
Extension No. 3: 3769-5455-10040
10,040
26.5
ANDERSEN ANDRE CONSULTING ENGINERS, INC.
Notes:
834 Swan Avenue, Port St. Lucie, FL 34983 • Ph: 772.807.9191 • www.aaceinc.com • info@aaceinc.com
Torque readings typically noted at start, 1/3, 2/3 and end of each extension.
HELICAL PILE INSTALLATION RECORD
(Page 5 / 8)
Project: Maverick Boat Expansion Inspected By: KS
File Number: 21-152 Checked By: PGA
Client: RK Davis Construction Corp. Installation Period: 04/02/2021 - 04/27/2021
Pile Contractor: Brownie Companies Pile Design Criteria: 90K ultimate, 45K allowable (compression and tension). Target torque: 10,000 ft4bs (K=9)
Pile Manufacturer: Helical Anchors, Inc. Lead Product No: NA Extension Product No: NA
Lead Section: 7', 2-7/8" OD, 12' & 14" helices Extensions: 7'. 2-78" OD NOTE 1: L = Lead, E1 = Extension 1, E2 = Extension 2, etc.
Torque Indicator: CMI Torqhub 3" Hex 20K, SIN 31-623 Bracket Product No. NA NOTE 2: Product Info and Torque Indicator Calibration provided by Pile Contractor
Install Date
Location
Pile No.
Pile ID
Installation Notes
Final Pile Segment and Measured Torque (ft-Ibs)
Final Installation Torque
Approximate Final Pile Embedment
(ft-Ibs)
(ft below bottom of footing excavation)
J
04/20/21
D-4
41
D4E
Extension No. 3: 28155003-10050
10,050
25.8
04/20/21
D-8 Y
42
DBS
Extension No. 4: 7540-10035
10,035
28.9
04/27/21
D-29
43
D29W
Four piles installed in D-29
Extension No. 5: 3008-5312-7670-6500
6,500
34.4
04/27/21
D-29
44
D29E
Four piles installed in D-29
Extension No. 5: 2090-4322-9309
9,309
39.5
04/27/21
D-28 (/
45
D28E
Extension No. 5: 10050
10,050
34.0
04/27/21
D-28
46
D28W
Extension No. 4: 2937-3384-6625-10100
10,100
34.0
04/27/21
D-27 V
47
D27E
Pile installed on 04/26/21 without AACE presence.
Extension No. 4: 10020
10,020
33.4
Retorqued 04/27/21 with AACE present.
04/27/21
D-27 of
48
D27W
Pile installed on 04/26121 without AACE presence.
Extension No. 4: 10035
10,035
34.0
Retorqued 04/27/21 with AACE present.
04/27/21
D-26
49
D26E
Pile installed on 04/26/21 without AACE presence.
Extension No. 5: 10060
10,060
34.4
Retorqued 04/27/21 with AACE present.
04/27/21
D-26
50
D26W
Pile installed on.04/26/21 without AACE presence.
Extension No. 4: 10150
10,150
34.5
Retorqued 04/27/21 with AACE present.
ANDERSEN ANDRE CONSULTING ENGINERS, INC.
Notes:
Torque readings typically noted at start, 1/3, 2/3 and end of each extension.
834 Swan Avenue, Port St. Lucie, FL 34983 • Ph: 772.807.9191 • www.aaceine.com • info@aaceinc.com
HELICAL PILE INSTALLATION RECORD
(Page 6 / 8)
Project: Maverick Boat Expansion Inspected By: KS
File Number: 21-152 Checked By: PGA
Client: RK Davis Construction Corp. Installation Period: 04/02/2021 - 04/27/2021
Pile Contractor: Brownie Companies Pile Design Criteria: 90K ultimate, 45K allowable (compression and tension). Target torque: 10,000 ft-Ibs (K=9)
Pile Manufacturer: Helical Anchors, Inc. Lead Product No: NA Extension Product No: NA
Lead Section: T, 2-7/8" OD, 12" 8 14" helices Extensions: T, 2-78" OD NOTE 1: L = Lead, Et = Extension 1, E2 = Extension 2, etc.
Torque Indicator: CMI Torqhub 3" Hex 20K, SIN 31-623 Bracket Product No. NA NOTE 2: Product Info and Torque Indicator Calibration provided by Pile Contractor
Final Installation Torque
Approximate Final Pile Embedment
Install Date
Location
Pile No.
Pile ID
Installation Notes
Final Pile Segment and Measured Torque (ft-Ibs)
(ft-Ibs)
(ft below bottom of footing excavation)
04/27/21
D-25 v
51
D25E
Pile installed on 04/26/21 without AACE presence.
Extension No. 4: 10041
10,041
34.3
Retorqued 04/27/21 with AACE present.
✓
04/27/21
D-25
52
D25W
Pile installed on 04/26/21 without AACE presence.
Extension No. 5: 10081
10,081
34.8
Retorqued 04/27/21 with AACE present.
04/27/21
V
D-24
53
D24W
Pile installed on 04/26/21 without AACE presence.
Extension No. 5: 10150
10,150
34.7
Retorqued 04/27/21 with AACE present.
04/27/21
D-24
54
D24E
Pile installed on 04/26/21 without AACE presence.
Extension No. 4: 10200
10,200
33.5
Retorqued 04/27/21 with AACE present.
04/27/21
D-23 Y
55
D23E
Pile installed on 04/26/21 without AACE presence.
Extension No. 5: 10115
10,115
36.5
Retorqued 04/27/21 with AACE present.
04/27/21
D-23 V
56
D23W
Pile installed on 04/26/21 without AACE presence.
Extension No. 4: 10040
10,040
34.3
Retorqued 04/27/21 with AACE present.
04/27/21
V
D-14
57
D14N
Pile installed 6n 04/26/21 without AACE presence.
Extension No. 4: 10020
10,020
33.0
Retorqued 04/27/21 with AACE present.
04/27/21
D-14
58
014S
Pile installed on 04/26/21 without AACE presence.
Extension No. 4: 10050
10,050
33.7
Retorqued 04/27/21 with AACE present.
04/27/21
' D-29
59
D29N
Four piles installed in D-29
Extension No. 2: 3620
3,620
21.0
✓
04/27/21
D-29
60
D29S
Four piles installed in D-29
Extension No. 2:.3525
3,525
20.3
ANDERSEN ANDRE CONSULTING ENGINERS, INC.
Notes:
Torque readings typically noted at start, 113, 2/3 and end of each extension.
834 Swan Avenue, Port St. Lucie, FL 34983 • Ph: 772.807.9191 • www.aaceinc.com • info@aaceinc.com
HELICAL -PILE INSTALLATION RECORD
(Page 7 / 8)
Project: Maverick Boat Expansion Inspected By: KS
File Number: 21-152 Checked By: PGA
Client: RK Davis Construction Corp. Installation Period: 04/02/2021 - 04/27/2021
Pile Contractor: Brownie Companies Pile Design Criteria: 90K ultimate, 45K allowable (compression and tension). Target torque: 10,000 ft-Ibs (K=9)
Pile Manufacturer: Helical Anchors, Inc. Lead Product No: NA Extension Product No: NA
Lead Section: 7', 2-7/8" OD, 12" 8 14" helices Extensions: 7'. 2-78" OD NOTE 1: L = Lead, E1 = Extension 1, E2 = Extension 2, etc.
Torque Indicator: CMI Torqhub 3" Hex 20K, S/N 31-623 Bracket Product No. NA NOTE 2: Product Info and Torque Indicator Calibration provided by Pile Contractor
Final Installation Torque
Approximate Final Pile Embedment
Install Date
Location
Pile No.
Pile ID
Installation Notes
Final Pile Segment and Measured Torque (ft-Ibs)
(ft-Ibs)
(It below bottom of footing excavation)
04/27/21
D-30
61
D30W
Extension No. 5: 3600-6007-10012
10,012
38.7
✓
04/27/21
D-30
62
D30E
Extension No. 5: 2517-5666-10041
10,041
' 39.0
V
04/27/21
D-31
63
D31 W
Extension No. 5: 5210-10040
10,040
39.5
04/27/21
D-31
64
D31E
Extension No. 5: 2322-6050-10020
10.020
39.8
V
04/27/21
D-32
65
D32W
Extension No. 6: 5104-10010
10,010
44.0
✓
04/27/21
D-32:
66
D32E
Extension No. 6: 4415-10086
10,086
42.2
04/27/21
D-33 ' `
67
D33W
3 piles installed in D-33
Extension No. 6: 6802
6,802
40.5
v
04/27/21
D-33
68
D33NE
3 piles installed in D-33
Extension No. 5: 2008-3446-3609-7103
7,103
41.5
04/27/21
D-33
69
D33SE
3 piles installed in D-33
Extension No. 6: 7157
7,157
39.8
r
04/27/21
D34
70
D34W
Extension No. 5: 2537-5892-7054-10070
10,070
40.7
ANDERSEN ANDRE CONSULTING ENGINERS, INC.
834 Swan Avenue, Part St. Lucie, FL 34983 • Ph: 772.807.9191 • www.aaceinc.com • info@aaceinc.com
HELICAL PILE INSTALLATION RECORD
(Page 8 / 8)
Notes:
Torque readings typically noted at start, 113, 2/3 and end of each extension.
Project: Maverick Boat Expansion Inspected By: KS
File Number: 21-152 Checked By: PGA
Client: RK Davis Construction Corp. Installation Period: 04/02/2021 - 04/27/2021
Pile Contractor. Brownie Companies Pile Design Criteria: 90K ultimate, 45K allowable (compression and tension). Target torque: 10,000 ft-lbs (K=9)
Pile Manufacturer: Helical Anchors, Inc. Lead Product No: NA Extension Product No: NA
Lead Section: 7', 2-718" OD, 12" & 14" helices Extensions: 7'. 2-78" OD NOTE 1: L = Lead, E1 = Extension 1, E2 = Extension 2, etc.
Torque Indicator: CMI Torghub 3" Hex 20K, S/N 31-623 Bracket Product No. NA NOTE 2: Product Info and Torque Indicator Calibration provided by Pile Contractor
Install Date
Location
Pile No.
Pile ID
Installation Notes
Final Pile Segment and Measured Torque (ft-lbs)
Final Installation Torque
(ft4bs)
Approximate Final Pile Embedment
(ft below bottom of footing excavation)
04/27/21
D-34
71
D34E
Extension No. 5: 2573-3494-5396-10080
10.080
40.8
04/27/21
D-35
72
D35W
Extension No. 5: 21913872-5324-10038
10,038
40.2
04/27/21
D-35
73
D35E
Extension No. 5:1719-2591-5441-10050
10,050
41.0