HomeMy WebLinkAboutAPPROVED PV Plans v1 - Gibson, Arvet - signedCITY NOTES:PV SYSTEM SUMMARY: 10.080 KWSITE LOCATION ANDHOUSE AERIAL VIEWTHIS PROJECT COMPLIES WITH THE FOLLOWING:2020 7TH EDITION FLORIDA BUILDING CODE: BUILDING2020 7TH EDITION FLORIDA BUILDING CODE: RESIDENTIAL2020 7TH EDITION FLORIDA BUILDING CODE: MECHANICAL2020 7TH EDITION FLORIDA BUILDING CODE: PLUMBING2020 7TH EDITION FLORIDA BUILDING CODE: FUEL GAS2020 7TH EDITION FLORIDA BUILDING CODE: ENERGY CONSERVATION2020 7TH EDITION FLORIDA BUILDING CODE: EXISTING BUILDING2020 7TH EDITION FLORIDA BUILDING CODE: ACCESSIBILITY2020 7TH EDITION FLORIDA FIRE PREVENTION CODE2017 NATIONAL ELECTRIC CODE (NEC)AS ADOPTED BY COUNTY OF ST. LUCIEPHOTOVOLTAIC SYSTEMSITE LOCATION:HOUSE AERIAL VIEW:SITE LOCATIONMODULE LOCATIONMAIN SERVICE PANEL:EXISTING 150 AMPS MSP WITH (E) 150 AMPS MAINBREAKER ON TOP FEDINTERCONNECTION:LINE SIDE TAPOCPD RATING:40 AMPSUTILITY:FLORIDA POWER & LIGHTTILT:22°AZIMUTH:270°RESIDENTIAL PHOTOVOLTAIC SYSTEMSYSTEM SIZE (DC):STC: 28 X 360 = 10080W DC:PTC: 28 X 335.5 = 9394W DCSYSTEM SIZE (AC):7600W AC @ 240VMODULES:28 X LONGI SOLAR: LR4-60HPH-360MSHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-1F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHTOPTIMIZERS:28 X SOLAR EDGE: P401INVERTER:SOLAR EDGE: SE7600H-US [SI1]ROOF:COMPOSITION SHINGLERAFTER/TRUSS SIZE:2X4 TRUSS @ 24" O.C.ATTACHMENT TYPE:UNIRAC: SFM INFINITY MICRORAIL WITH UNIRAC SFMINFINITY RAIL-LESSALL SOLAR ENERGY SYSTEM EQUIPMENT SHALL BE SCREENED TO THEMAXIMUM EXTENT POSSIBLE AND SHALL BE PAINTED A COLOR SIMILARTO THE SURFACE UPON WHICH THEY ARE MOUNTED.INSTALLATION NOTES:MODULES SHALL BE TESTED , LISTED AND INDENTIFIED WITH FIRE CLASSIFICATION INACCORDANCE WITH UL 2703. SMOKE AND CARBON MONOXIDE ALARMS ARE REQUIREDPER SECTION R314 AND 315 TO BE VERIFIED AND INSPECTED BY INSPECTOR IN THEFIELD.CONDUIT AND CONDUCTOR SPECIFICATIONS ARE BASED ON MINIMUMCODE REQUIREMENTS AND ARE NOT MEANT TO LIMIT UP-SIZING ASREQUIRED BY FIELD CONDITIONS.DIG ALERT (811) TO BE CONTACTED AND COMPLIANCE WITH EXCAVATIONSAFETY PRIOR TO ANY EXCAVATION TAKING PLACEINSTALL CREW TO VERIFY ROOF STRUCTURE PRIOR TO COMMENCING WORK.EMT CONDUIT ATTACHED TO THE ROOF USING CONDUIT MOUNT.PV-1SITE LOCATION AND HOUSE AERIAL VIEWPV-2SITE PLANPV-2AROOF PLAN WITH MODULES LAYOUTPV-3MOUNTING DETAILSPV-4THREE LINE DIAGRAMPV-5EXISTING SERVICE PANELPV-6NOTES AND EQUIPMENT LISTPV-7LABELSPV-7ASITE PLACARDPV-8OPTIMIZER CHARTPV-9 & 10SAFETY PLANTABLE OF CONTENTS
MSPUMACINVJBSITE PLANSITE PLANSCALE: 1/16" = 1'-0"1SITE PLANPV SYSTEM10.080 kW-DC7.600 kW-ACROOF AREA : 2390.29 SQ FTSHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-2F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHTPROPERTY LINEDRIVEWAYHICKORY DRIVE
(E) MAIN SERVICE PANEL(N) SE7600H-US [SI1](N) SQUARE D D222NRB(E) UTILITY METER(N) 28 LONGI SOLAR: LR4-60HPH-360M(N) JUNCTION BOXROOF LINELEGEND:OBSTRUCTIONPIPE VENTMODULESCONDUITSETBACKMSP AC ACDISCONNECTJUNCTIONBOXINVINVERTER UM JBMSPUTILITY METER139'-7"74'-3"
5'-1"45'-2"48'-9"5'-0"139'-7"74'-3"
MSPUMACINVJBROOF PLANSCALE: 3/32" = 1'-0"1ROOF AREA STATEMENTROOFMODULESQTYPITCHAZIMUTHROOF AREAARRAY AREAARRAYCOVERAGE %SYSTEMDISTRIBUTEDWEIGHT12822°270°1086.02 SQ FT550.20 SQ FT23.02%2.19 PSFPV SYSTEM10.080 kW-DC7.600 kW-ACNOTES:1.EMT CONDUIT ATTACHED TOTHE ROOF USING CONDUITMOUNTS2.ATTACHED CLAMPS AT 25%FROM THE EDGE AND 50% FROMTHE CENTER OF THE MODULES3.JUNCTION BOX IS MOUNTED TOTHE RAIL.SHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-2AF096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHTROOF PLAN W/MODULES LAYOUTROOF AREA : 2390.29 SQ FTFIRE ACCESSPATHWAYSLEGEND:OBSTRUCTIONPIPE VENTMODULESCONDUITSETBACKMSP AC ACDISCONNECTJUNCTIONBOXINVINVERTER UM JBMSPUTILITY METERFIRE ACCESSPATHWAYS3'-0"
3'-0"3'-0"
ROOF DECK /MEMBRANESFM SLIDER ANDTRIMRAIL ROOFATTACHMENTBUILDING STRUCTURE5/16" STAINLESS STEEL LAGBOLT OR STRUCTURAL SCREWWITH 2-1/2" MIN. EMBEDMENTAND FLAT WASHER2.5"SFM TRIMRAIL2.5" MIN. EMBED.FLASHINGROOF / DECK MEMBRANEUNIRAC SLIDERSBUILDING STRUCTURE5/16" STAINLESS STEELLAG BOLT ORSTRUCTURAL SCREWWITH 2-1/2" MIN.EMBEDMENT AND FLATWASHER2.5"SFM MICRORAILFLASHING2.5" MIN. EMBED.LONGI SOLAR:LR4-60HPH-360MLONGI SOLAR:LR4-60HPH-360MUNIRAC SLIDERSSFM MICRORAIL2.5"
MIN
.
EMBED
.5/16" STAINLESS STEEL LAGBOLT OR STRUCTURAL SCREWWITH 2-1/2" MIN. EMBEDMENTAND FLAT WASHERSFM TRIMRAIL2.5" MIN. EMBED.LONGI SOLAR:LR4-60HPH-360MFLASHINGFLASHINGSFM SLIDER AND TRIMRAILROOF ATTACHMENT2X4 TRUSS @ 24" O.C.ROOF / DECK MEMBRANE3" MIN.6" MAX.MAX ATTACHMENT SPAN - 4'MOUNTINGDETAILSATTACHMENT DETAILScale: NTSSOLAR PV ARRAY SECTION VIEWScale: NTSPARTIAL ROOF FRAMING PLANScale: NTSSHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-3F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHT
SOLAREDGE P401 POWER OPTIMIZERSJUNCTIONBOXSTRING-12 - #10 AWG, PV WIRE1 - #6 AWG IN FREE AIR OR#8 AWG MUST BE IN EMT CONDUITSTRING-2SOLAREDGE P401POWER OPTIMIZERS2 - #10 AWG,PV WIRE14 LONGI SOLAR:LR4-60HPH-360M14 LONGI SOLAR:LR4-60HPH-360M4 - #10 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" ORLARGER EMT CONDUITUM(E) 150A / 2PMAIN BREAKER(END FED)(E) 150A RATEDMAIN SERVICE PANEL1PH, 120/240V 60HZ(E) UTILITYMETER(N) LINESIDE TAP VIA ULLISTED CONNECTORS1 - #6 GEC, BARE COPPERFREE AIR BONDEDEXISTING UFER TIE INTO UTILITYOVERHEADFEED(N) 60A FUSEDAC DISCONNECTSQUARE D D222NRB2 - 40 AMP FUSES3 - #8 AWG, THWN-21 - #8 EGC, THWN-2IN 3/4" OR LARGER EMT CONDUITA TAPBOX MAY BE USED IN LIEU OF PERFORMING THE LINESIDETAP IN THE MAIN SERVICE PANEL. THIS IS DEPENDENT UPON SITECONDITIONS.3 - #6 AWG, THWN-2IN 3/4" OR LARGER EMT CONDUIT(N) SOLAREDGESE7600H-US [SI1]INVERTERACDCRAPIDSHUTDOWNSWITCHCONNECT TO EXISTING UFERTHREE LINEDIAGRAMNOTE:CONDUIT AND CONDUCTORS SPECIFICATIONS ARE BASEDON MINIMUM CODE REQUIREMENTS AND ARE NOT MEANTTO LIMIT UP-SIZING AS REQUIRED BY FIELD CONDITIONSBACKFEED FUSE SIZINGMAX. CONTINUOUS OUTPUT 32A @ 240V32.00X1.25=40AMPS40A FUSES - OKCONDUCTOR AMPACITY DE-RATE CALCULATIONEQUIPMENTWIRE LOCATIONCONDUCTORQTY.AWG WIRESIZENEC FACTORSTABLE310.15(B)(16)NEC FACTORSTABLE310.15(B)(2)(a)CONDUCTORAMPACITY@90C ADJ.NEC FACTORSTABLE310.15(B)(3)(a)1ACINVERTERTOAC DISCONNECTEXTERIOR WALL38500.94471.002ACAC DISCONNECTTOPOIEXTERIOR WALL36650.9461.11.00PV SYSTEM10.080 kW-DC7.600 kW-ACSHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-4F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHT
EXISTING SERVICEPANELSHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-5F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHT
NOTES ANDEQUIPMENT LISTMATERIAL LIST:SHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-6F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHTQTY.PARTPART #DESCRIPTION28MODULES114-360WLONGI SOLAR: LR4-60HPH-360M28OPTIMIZERS130-401P401 SOLAREDGE POWER OPTIMIZER - FRAME MOUNTED MODULE ADD-ON1JUNCTION BOX480-276600VDC NEMA 3R UL LISTED JUNCTION BOX2CONNECTORS240-300STAUBLI / MULTI-CONTACT MC4 CONNECTORS (FEMALE)2CONNECTORS240-301STAUBLI / MULTI-CONTACT MC4 CONNECTORS (MALE)1INVERTER120-761SE7600H-US [SI1] 240V INVERTER UL1741 SA CERTIFIED INTEGRATED ARC FAULT PROTECTION AND RAPID SHUTDOWN1AC DISCONNECT323-06560A RATED 240VAC NEMA 3R UL LISTED2FUSES330-04040A FUSE 1 PH 240VAC1FUSE REDUCER330-53060A-30A FUSE REDUCER1TAP KIT350-111#6 - 3/0 AWG INSULATED TAP 2 PORT51ROOF ATTACHMENT 1261-602UNIRAC: SFM INFINITY MICRORAIL49MICRORAIL 1261-602SFM MICRORAIL 2 INCH20SFM TRIM 1241-253FLASHKIT SFM TRIM COMP DARK53SFM SLIDER 1261-603FLASHKIT SFM SLIDER COMP DARK16BONDING CLAMP 1221-100SFM N/S BONDING CLAMP6BONDING CLAMP 1241-404SFM TRIM BONDING CLAMP30MOUNT ASSEMBLY 1241-405MLPE MOUNT ASSY17SFM SPLICE 1261-604SFM SPLICE4SFM ATTACHED SPLICE 1211-101SFM ATTACHED SPLICE 8 INCH23TRIMRAIL 1261-606SFM TRIMRAIL UNIV CLIP W/ HDW7TRIM SPLICE 1261-605SFM TRIM SPLICE DRK13TRIMRAIL 1211-115SFM TRIMRAIL UNIV DRK28GROUND LUG 1260-585ILSCO GROUND LUG28TRIM END CAPS 1UNIRAC SFM TRIM END CAPSGENERAL NOTES:28 LONGI SOLAR WIRED AND LISTED TO UL1703 STANDARDSTHE SOLAREDGE INVERTER IS INTEGRATED WITH DC DISCONNECTION AND ARC FAULT PROECTION. IT IS ATTACHED WITH SYSTEM ELECTRICAL SPECIFICATIONS W/ GROUND FAULT PROTECTION & LISTED TO UL 1741 STANDARDS.PHOTOVOLTAIC SYSTEM GROUND WILL BE TIED INTO EXISTING GROUND AT MAIN SERVICE FROM DC DISCONNECT/INVERTER AS PER 2017 NEC SEC 250.166(A).SOLAR PHOTOVOLTAIC SYSTEM EQUIPMENT WILL BE INSTALLED IN ACCORDANCE WITH REQUIREMENTS OF ART. 690 OF THE 2017 NECCONDUIT ABOVE ROOF SHALL BE NO LESS THAN 1 INCH FROM TOP OF THE ROOF TO BOTTOM OF RACEWAY. TABLE NEC 310.15(B)(3)(C)PHOTOVOLTAIC DC CONDUCTORS ENTERING THE BUILDING SHALL BE INSTALLED IN METALLIC RACEWAY AND SHALL BE IDENTIFIED EVERY 10 FEET -- AND WITHIN 1 FOOT ABOVE AND BELOW PENETRATIONS OF ROOF/CEILING ASSEMBLIES WALLS OR BARRIERS -- WITHMINIMUM 3/8-INCH-HIGH WHITE LETTERING ON RED BACKGROUND READING: WARNING: PHOTOVOLTAIC POWER SOURCE.SYSTEM GROUNDING ELECTRODE CONDUCTOR FOR PV SYSTEM TO BE SIZED TO MEET THE REQUIREMENTS OF 2017 NECTHE EXISTING MAIN SERVICE PANEL WILL BE EQUIPPED WITH A GROUND ROD OR UFERUTILITY COMPANY WILL BE NOTIFIED PRIOR TO ACTIVIATION OF THE SOLAR PV SYSTEMTERMINALS OF THE DISCONNECTING MEANS MAY BE ENERGIZED IN THE OPEN POSITIONSOLAREDGE INVERTERS ARE LISTED TO UL 1741 AND UL 1699B STANDARDSSOLAREDGE OPTIMIZERS ARE LISTED TO IEC 62109-1 (CLASS II SAFETY) AND UL 1741 STANDARDSBREAKER SIZES:SERVICE:
1.NEC ARTICLES 690 AND 705 AND NEC SECTION R324 MARKINGSSHOWN HEREON.2.ALL MARKING SHALL CONSIST OF THE FOLLOWING:A.UV RESISTANT SIGN MATERIAL WITH ENGRAVED ORMACHINE PRINTED LETTERS OR ELECTRO-PLATING.B.RED BACKGROUND COLOR WHITE TEXT AND LINEWORK.C.AERIAL FONT.3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED INTHE LOCATIONS SPECIFIED. SIGNAGE CANNOT BEHAND-WRITTEN.3.SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITHPOP-RIVETS OR SCREWS.NOTES:M690.54705.12(B)(2)(3)(b)"WARNING"DUAL POWER SOURCESSECOND SOURCE IS PHOTOVOLTAIC SYSTEM RATED AC OUTPUT CURRENT - 32.00 AMPSAC NORMAL OPERATING VOLTAGE - 240 VOLTSWARNING:POWER SOURCE OUTPUTCONNECTIONDO NOT RELOCATE THISOVERCURRENT DEVICE.TURN RAPIDSHUTDOWN SWITCH TOTHE "OFF" POSITION TOSHUT DOWN PV SYSTEMAND REDUCE SHOCKHAZARD IN THE ARRAY690.56(C)(1)(A)SOLAR PV SYSTEM EQUIPPEDWITH RAPID SHUTDOWNAC
690.15, 690.54PV SYSTEM AC DISCONNECT RATED AC OUTPUT CURRENT - 32.00 AMPSAC NORMAL OPERATING VOLTAGE - 240 VOLTSRAPID SHUTDOWN SWITCH FORSOLAR PV SYSTEM690.56(C)(3)INVERTERARRAYJ/BDC"WARNING"PHOTOVOLTAIC POWER SOURCEEVERY 10' ON CONDUIT AND ENCLOSURES"WARNING"ELECTRICAL SHOCK HAZARD.TERMINALS ON BOTH LINE AND LOAD SIDESMAY BE ENERGIZED IN THE OPEN POSITION690.13 (B)690.53PV SYSTEM DC DISCONNECTMAXIMUM VOLTAGE: 480VMAXIMUM CIRCUIT CURRENT: 32AMAX RATED OUTPUT CURRENT OFTHE CONTROLLER OR DC-TO-DCCONVERTER: 15ANEC 690.31(G)(3) & (4)PMPV METERSOLAR ELECTRICPV PANELSSHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-7F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHTLABELS
MSPUMACINVJBNOTES:1.NEC ARTICLES 690 AND 705 AND NEC SECTION R324 MARKINGS SHOWN HEREON.2.ALL MARKING SHALL CONSIST OF THE FOLLOWING:A.UV RESISTANT SIGN MATERIAL WITH ENGRAVED OR MACHINE PRINTED LETTERS ORELECTRO-PLATING.B.RED BACKGROUND COLOR WHITE TEXT AND LINE WORK.C.AERIAL FONT.3. ALL SIGNS SHALL BE SIZED APPROPRIATELY AND PLACED IN THE LOCATIONS SPECIFIED.SIGNAGE CANNOT BE HAND-WRITTEN.3.SIGNS SHALL BE ATTACHED TO THE SERVICE EQUIPMENT WITH POP-RIVETS OR SCREWS.HICKORY DRIVE
SITE PLACARDCAUTION:MULTIPLE SOURCES OF POWER LOCATED AS SHOWN.DANGEROUS VOLTAGE MAY BE PRESENT AT ALL TIMES6X8" TYP - NEC 705.10SHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-7AF096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHTMAIN SERVICE PANELINVERTER EQUIPPEDWITH RAPID SHUTDOWNJUNCTION BOX28 PV MODULEAC DISCONNECTUTILITY METER
123456789101-1011-2021-3031-4041-5051-60123456789101-1011-2021-3031-4041-5051-60SHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-8F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHTSOLAREDGE OPTIMIZER CHARTOPTIMIZERCHARTHICKORY DRIVE
SAFETY PLANSAFETY PLANMARK UP KEYINSTRUCTIONS:1.USE SYMBOLS IN KEY TO MARK UP THIS SHEET.2.SAFETY PLAN MUST BE MARKED BEFORE JOBSTARTS AS PART OF THE PRE-PLAN3.DOCUMENT ALL ADDITIONAL HAZARDS ON THIS PAGE& MAKE NOTES ON THE JHA SHEETIN CASE OF EMERGENCYNEAREST HOSPITAL OR OCCUPATIONAL/INDUSTRIAL CLINICNAME: _______________________________________________ADDRESS: ___________________________________________SAFETY COACH CONTACT INFORMATIONNAME: _______________________________________________ADDRESS: ___________________________________________ALL EMPLOYEES ON SITE SHALL BE MADE AWARE OF THESAFETY PLAN AND SIGN INDICATING THAT THEY AREAWARE OF THE HAZARDS ON-SITE AND THE PLAN FORWORKING SAFELY. NAME SIGNATURE__________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ __________________________ ________________DATE: ______________ TIME:___________________________PERMANENT ANCHORTEMPORARY ANCHORINSTALLER LADDERJUNCTION / COMBINER BOXSTUB-OUTSKYLIGHTNO LADDER ACCESS (STEEP GRADEOR GROUND LEVEL OBSTRUCTIONS)RESTRICTED ACCESSCONDUITGAS SHUT OFFWATER SHUT OFFSERVICE DROPPOWER LINESPTILBS7ZGASH2OSHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-9F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHTHICKORY DRIVE
JOB HAZARD ANALYSISCrew leader to fill out all sections below, hold a pre-job safety meeting with all personnel, and upload this completed document and the Safety Plan to Site CaptureLadder Access·Ladders must be inspected before each use.·Extension ladders must be set up on a firm and level surface ata 4-to-1 rise to run angle (or 75 degrees) and the top must besecured to the structure. Extension style ladders placed onuneven, loose or slippery surfaces must additionally have thebase firmly anchored or lashed so the base will not slip out.·Extension ladders must be used with walk-through devices orthe ladder must extend 36" above the stepping off point.·A-frame ladders must only be climbed with the ladder spreaderbars locked in the open position; A-frame ladders shall not beclimbed while in the closed position (ex, closed and used whileleaned against a structure).·Additional notes:Mobile Equipment·Only Qualified operators will operate equipment; operators mustmaintain a certification on their person for the equipment beingoperated.·Type(s) of mobile equipment (Type/Make/Model):·Qualified operator(s):Material Handling and Storage·Materials will be staged/stored in a way that does not present ahazard to client, personnel or public. Materials stored on theroof will be physically protect from failing or sliding off.Fall Protection·A site-specific plan for fall prevention and protection is requiredprior to starting work and must remain onsite at all times untilwork is complete; a fall rescue plan must be outlined anddiscussed among the crew prior to work start.·First-person-Up (FPU) must install their anchor and connectbefore any other task, including installing other anchors. TheLast-Person-Down (LPD) must be the only person on a roofuninstalling fall protection.·FPCP (name and title):·FPU and LPD (name and title):Electrical Safety·The Electrical Qualified Person (EQP) is required onsite toperform electrical work.·All electrical work will be performed with equipment in anelectrically safe condition (de-energized) unless approval hasbeen granted prior to work.·Service drops and overhead electrical hazards will beindentified and protected from contact, as neccessary.·EQP (name and tile):Public Protection·The safety of the Client and the Public must be maintained at alltimes.·The Client and the Public shall be prevented from entering thework zone through the use of barriers and/or signage, asrequired.·Company, Client and Public property shall be protect fromfalling objects.·Pets (including dogs) shall be secured by their owners prior towork start.·The client should not leave pets, family members, or others inthe charge or care of Employees, Contractors, or TemporaryWorkers.·Crew leader responsible for communication with the client:·Client and public is excluded from work area by barricades (N/A,Yes, No):Training and Pre-Job Safety Briefing·All employees onsite shall be made aware of the specifichazards of this project and review this HJA during a pre-jobbriefing, and their signature indicates awareness of siteconditions and the plan to eliminate any hazards identified priorto and during the project.·Crew leader (name/title):·Crew member (name/title):·Crew member (name/title):·Crew member (name/title):·Crew member (name/title):·Crew member (name/title):Airborne Contaminants:·Asbestos-containing (Transite) piping (ACP) - Do not disturb(move, drill, cut fracture, etc.)·Asbestos-containing thermal insulation (ACI) andAsbestos-containing duct wrapping (ACW) - do not disturb, noattic or crawlspace access is allowed if work to be performedcould cause exposure to personnel, client or public.·If yes, list specific tasks and protection in place:Weather and Environment·The site supervisor shall forecast the weather conditions at thejob site, prior to crew arrival, in order to mitigate any hazardsassociated with inclement weather (heat, cold, wind, rain, etc.)·The site supervisor will utilized a portable wind meter(anemometer) to verify actual onsite wind conditions, bychecking at the ground and on any elevated work surface (ex,rooftop) prior to work start, at midday and prior to solar panelstaging on a roof.·Elevated work involving the moving or maneuvering of solarpanels shall cease at 25mph (sustained wind) until windsubsides.·Forecasted weather maximum temp (degrees F):Heat Related Illness Prevention·Employees shall have access to potable drinking water that isfresh, pure, and suitably cool. The water shall be located asclose as practicable to the areas where employees are working.Water shall be supplied in sufficient quantity at the beginning ofthe work shift to provide at least one quart per employee perhour for drinking for the entire shift. Employees may begin theshift with smaller quantities of water if they identify the locationand have effective means for replenishment during the shift toallow employees to drink on quart or more per hour. Thefrequent drinking of water shall be encouraged.·Shade shall be present when temperature exceeds 80 degreesFahrenheit. When the outdoor temperature in the work exceeds80 degrees Fahrenheit, employees shall have and maintain oneor more areas with shade at all times.·New employees must be acclimatized. New employees will bemonitored by their Crew Leader (site supervisor) for the first two(2) weeks of employment or longer when necessary.·Employees will be allowed and encouraged to implementscheduled breaks during each shift. Employees must takecool-down breaks in the shade any time they feel the need to doso to protect them from overheating. Supervisors areREQUIRED to allow employees any break period they needduring high heat conditions.·Cool Vests are encouraged for all employees at all times duringperiods of high heat.·Identify the location of the closet Occupational/Industrial Clinicor Hospital in case a crew member becomes ill.What is the specific plan to provide and replenish sufficient water forall employees on site?·If offsite replenish is necessary, where will you go to replenishwater (location/address):·Who will replenish the drinking water (name):Restroom facilities·Employees shall have access to restroom facilities withhand-washing stations. Use of onsite restroom is at the client'sdiscretion (location is annotated below). If client does not givepermission, location of suitable restroom facilities withhand-washing stations offsite will be provided. The onsitesupervisor will identify location and make arrangements toensure all employees have access at any point.·Restroom facilities will be (circle one): Onsite - Offsite·If Offsite, add location name and address:Incident Reporting Procedure·Contact your Site SupervisorName:Phone:·Contact your ManagerName:Phone:·Contact your Site SupervisorName:Phone:With: Your full name, phone number, office location, brief descriptionof what happen and when.NOTE ADDITIONAL HAZARDS NOT ADDRESSED ABOVE(add as many as necessary by using additional sheets)Define the Hazard:Method/steps to prevent incident:Define the Hazard:Method/steps to prevent incident:Define the Hazard:Method/steps to prevent incident:Define the Hazard:Method/steps to prevent incident:SHEET:TITLE:CLIENT:REVISIONS:DATE:DESIGNBY:JOB NO.:DESCRIPTIONDATEREVISIONARVET GIBSON5500 HICKORY DRIVE,FORT PIERCE, FL 349827/16/2021JBPV-10F096964FREEDOM FOREVERINDY 6.07 TEMPLATE ELECTRICAL CONTRACTOR NO:CERTIFIED ELECTRICAL CONTRACTOREC13008056FREEDOM FOREVER FLORIDA LLC2619 CONSULATE DR SUITE 800, ORLANDO, FL 32819Tel: (800) 385-1075GREG ALBRIGHTSAFETY PLAN
FREEDOM FOREVERINDY 6.04 TEMPLATE
FREEDOM FOREVERINDY 6.04 TEMPLATE
FREEDOM FOREVERINDY 6.04 TEMPLATE
FREEDOM FOREVERINDY 6.04 TEMPLATE
FREEDOM FOREVERINDY 6.04 TEMPLATE
FREEDOM FOREVERINDY 6.04 TEMPLATE
FREEDOM FOREVERINDY 6.04 TEMPLATE
FREEDOM FOREVERINDY 6.04 TEMPLATE