Loading...
HomeMy WebLinkAbouthealth departmentSTATE OF FLORIDA S f..x DEPARTMENT OF HEALTH 4 ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM ,y CONSTRUCTION INSPECTION AND FINAL APPROVAL cw, WE �¢ APPLICANT: Rene SOSa AGENT: PROPERTY ADDRESS: 6801 Penny Ln Fort Pierce, FL 34951 APPLICATION #:AP1451878 PERMIT #:56-SF-1764487 DOCUMENT # : FI 1667880 DATE PAID:01/16/2020 FEE PAID:25.00 RECEIPT #:56-PID-4266662 LOT: 16 BLOCK: 111 SUBDIVISION: Lakewood Park ID#: 1301-611-0246-000-9 CHECKED [X] ITEMS ARE NOT IN COMPLIANCE WITH STATUTE OR RULE AND MUST BE CORRECTED. TANK INSTALLATION SETBACKS [ ] [01] TANK SIZE [1] 1090.00 [21 L ] [27] SURFACE WATER FT [ ] [021 TANK MATERIAL Polypropylene [ ] [28] DITCHES FT [ ] [031 OUTLET DEVICE [ ] [29] PRIVATE WELLS 77 FT [ ] (041 MULTI -CHAMBERED [ Y N ] [ ] (30] PUBLIC WELLS FT [ ] [051 OUTLET FILTER Polylok PL-68 [ ] [311 IRRIGATION WELLS FT [ ] (061 LEGEND 1. 70-143-11 DC4 2. [ ] [321 POTABLE WATER 37 FT [ ] [07] WATERTIGHT [ ] [331 BUILDING FOUNDATIONS 6 FT [ ] [081 LEVEL ( ] [34] PROPERTY LINES 16 FT [ ] [091 DEPTH TO LID [ ] [35] OTHER FT DRAINFIELD INSTALLATION FILLED / MOUND SYSTEM [ ] [10] AREA [1] 375 [21 SQFT [ ] (361 DRAINFIELD COVER [ ] [11] DISTRIBUTION BOX HEADER X [ ] [37] SHOULDERS [ ] [121 NUMBER OF DRAINLINES 1. 5.00 2. ( ] [381 SLOPES [ ] [131 DRAINLINE SEPARATION [ ] [39] STABILIZATION 07/30/2021 ( ] [141 DRAINLINE SLOPE [ ] [15] DEPTH OF COVER ADDITIONAL INFORMATION [ ] [161 ELEVATION [ ABOVE / BELOW ]BM 1.00 ( ] [401 UNOBSTRUCTED AREA [ ] (171 SYSTEM LOCATION [ ] [41] STORMWATER RUNOFF ( ] [18] DOSING PUMPS [ ] [421 ALARMS [ ] [19] AGGREGATE SIZE [ ] [431 MAINTENANCE AGREEMENT [ ] [20] AGGREGATE.EXCESSIVE FINES [ ] [441 BUILDING AREA [ ] [211 AGGREGATE DEPTH [ ] [45] LOCATION CONFORMS WITH SITE PLAN FILL / EXCAVATION MATERIAL [ ] [46] FINAL SITE GRADING [ ] [221 FILL AMOUNT [ ] [471 CONTRACTOR Bruce T Mc Cullers (Reliable T [ ] [231 FILL TEXTURE [ ] [481 OTHER ADS MPS-9 (9 pipes - 2 tier) [ ] [241 EXCAVATION DEPTH ABANDONMENT ( ] [251 AREA REPLACED [ ] [49] TANK PUMPED ( ] [26] REPLACEMENT MATERIAL [ ] [50] TANK CRUSHED & FILLED Comments: Comments are on page 2. / St. Lucie CHD DATE: 12/15/2020 CONSTRUCTION L APPROVED DISAPPROVED ] ' Enviro ntal Specialist J Ingram (ENVIRONMENTAL HEALTH) FINAL SYSTEM [ APPROVED / DISAPPROVED ]: St. Lucie CHD DATE: 07/30/2021 "'Envif6rimental Specialist I rian J Ingram (ENVIRONMENTAL HEALTH) (Explanation of Violations on following page) DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, FAC Page 2 of 3 EH Database v 1.0.1 AP1451878 EID1764487 APPLICATION #:AaP1451878 STATE OF FLORIDA PERMIT #:56-SF-1764487 DEPARTMENT OF HEALTH DOCUMENT # : FI 1667880 ONSITE SEWAGE TREATMENT AND DISPOSAL SYSTEM CONSTRUCTION INSPECTION AND FINAL APPROVAL DATE PAID:01/16/2020 FEE PAID :25.00 RECEIPT #:56-PID-4266662 Violation Number Comment Comments The system is sized for 3 bedrooms with a maximum occupancy of 6 persons (2 per bedroom), for a total estimated flow of 300 gpd. New ST, filter, and 5x25' long TRENCH DF installed. No violation, system ok to cover. Contractor notified onsite. Needs final inspection for mound system, gutters(front entry), and final site grading. Final system approved. Contractor and building department emailed final approval. DH 4016, 08/09 (Obsoletes all previous editions which may not be used) Incorporated: 64E-6.003, FAC Page 2 of 3 EH Database v 1.0.1 AP1451878 EID1764487