Loading...
HomeMy WebLinkAboutCreekside Lot 4-UG Plumbing Revised.pdf�U1141)VERSf) L� ENGINEERIWG SCIENCES INSPECTION RESULTS Inspection Date: 3—a I Permit No. Project: _ Address: Check one: XRegular Inspection: ❑ Reinspection Date of Initial Inspection: Inspection Type Requested (check): 8',3ka ( BUILDING/STRUCTURAL ) f ELECTRICAL ( ) PLUMBING necruwwu�.. Slab Floor Rough -in RougVn Steam Piping & Test Masonry Wall Rough -In Stack Piping & Test HW Piping &Test Wall/Ceiling Ceiling Rough -In Water Piping & Test CHW Piping & Test Framing Panel/Feeder Gas Piping & Test Cond. Piping & Test Structural Service/Ground Storm Piping & Test Insulation heei Rock -, _ Appliance/Equipment Fixtures Wall & Ceiling Protection Final Building ) I Final Electrical I f Final Plumbing final Mechanical Other Inspection Type: ' 1 Area Inspected/Code: OD — V Inspection Results: P-Approved ❑ AE-Approved with Exceptio s ❑ DA-Disallowed DP -Disapproved ❑ Not Ready Conditions/Comments 1. 2. 3. 4. 5. 6. 7. Inspector's Name: g4_x Lic.4: 6 �/ �9 _ OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 - (772) 924-3575 • (772) 924-3580 (fax) www.teampfa.com