Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
Creekside Lot 4 Temp Toilet-revised.pdf
01) ""'' `3 b I_r Lam. ft 6 : ENGINEERING SCIENCES 114SPECTION RESULTS r` Inspection Date: R " 3 _a I Permit No. Project: Kf L Address: 3 3 3 5 9 D" Check one: XRegular Inspection: D Reinspection Date of Initial Inspection: Inspection Type Requested (check): '9 - 3 -31 owavn�o/ainva-I VRK� CUUKI[AL PLUMBING MECHANICAL Footing Underground Underground Duct Rough -in Slab Floor Rough -In Rough -In Steam Piping & Te Masonry all Rough -In Stack Piping & Test HW Piping & Test Wall/Ceiling Ceiling Rough -in Water Piping & Test CHW piping & Test Framing Panel/Feeder Gas Piping &Test Cond. piping & Tesi Structural heei Rock Service/Ground Storm Piping &Test Insulation Roofing Appliance/Equipment Fixtures Wall & Ceiling Ligi'ting Protection Equipment Equipment Re -inspection Re -inspection Re -inspection Re -inspection Final Building Final Electrical Final Plumbing Final Mechaniral Other Inspection Type: Area Inspected/Code: 9 J, T(d rytil/j l ► t �1 Inspection Results: $kAP-Approved ❑ AE-Approved with Exceptions ❑ DP -Disapproved Q Not Ready Conditions/Comments: 1. 2. 3. 4. 5. 6. 7. Inspector's Name: ❑ DA-Disallowed OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Port St. Lucie, Florida 34986 • (772) 924-3575 • (772) 924.3580 (fax) www.teamgfa.com