Loading...
HomeMy WebLinkAboutCreekside Lot 88 Sewer Connect-not ready.pdfFIXIJYlk"I'VER" SAL @ta'�Iii���lF�G �CIEkG�s INSPECTION RESULTS Inspection Date: p — roc 1 Permit No. G S Project: � Address: Check one: Regular Inspection: -926 -6 789 0 Reinspection Date of Initial inspection: 6, — �} Inspection Type Requested (check): BUILDING/STRUCTURAL ELECTRICAL PLUMBING ....... Stab Floor Rough -In Rough -In Masonry Wall Rough -In Stack Piping & Test Wall/Ceiling Ceiling Rough -In Water Piping & Test Framing Panel/Feeder Gas Piping &'.--. Structural Service/Ground Storm Piping & Test 5heei Rock Gnonanro/r..u. a �:.,..___ Duct aleam�& 7e HW Pip— m—g & 7est CHW Ping & Test Cond. Pininp 2 Tpn nt-mspec Final Building Final Electrical Final Plumbing c u•pl JYI@CI Other Inspection Type: Area Inspected/Code: Inspection Results: ❑ AP -Approved 13 AE-Approved with Exceptions ❑ DA-Disallowed O DP -Disapproved XNot Ready Conditions/Comments 1. 2. 3. 4. S. 6. 7. Inspectors Name:_ Lic #: OFFICES THROUGHOUT FLORIDA 607 NW Commodity Cove, Pori St. Lucie, Florida 34986 - (772) 924-3515 • (772) 924.3580 (fax) www.teamgfa.com