HomeMy WebLinkAboutCreekside Lot 37 Driveway.pdfU VtiPV R-11 L`
ENGINEERING SCIENCES
INSPECTION RESULTS
Inspection Dale: v (p — Permit No
Project: G?�
Address: �3
Check one:
XRegular Inspection:
3 7
Jol/ -bl�� 6-
EJ Reinspection Date of Initial Inspection:.. Q ` cp '9
Inspection Type Requested (check):
Stab
Floor Rough -In
Rough -In
-..-.....wbn-n.
Steam Piping A Tesi
Masonry
Wall Rough -In
Stack Piping V. Test
HW Piping &Test
Wall/Ceiling
Ceiling Rough -In
Water Piping & Test
CHW piping &Test
Framing
Panel/Feeder
Gas Piping &Test
Cond. Piping &Test
Structural
Service/Ground
Storm Piping & Test
Insulation
Sheet Rock
Appliance/Equipment
Fixtures
Wall &Ceiling
Roofing
Lighting Protection
Equipment
Equipment
Re -inspection
Re -inspection
Re -inspection
Re -inspection
Final BuildingI
I Final Electrical I I
Final Plumbing
Final Mechanical
Other Inspection Type:
Area inspected/Code: G
Inspection Results:XAP-Approved ❑ AE-Approved vu
Exceptions ❑ DA-Disallowed
❑ DP -Disapproved ❑ Not Ready
Conditions/Comments:
1.
2.
3.
4.
S.
6.
7.
Inspector's Name:
OFFICES THROUGHOUT FLORIDA
607 NW Commodity Cove, Port St. Lucie, Florida 34986 - (772) 924-3575 - (772) 924-3580 (fax)
veww.tea mgfa.co m